UNDERGROUND CABLE | Outdoor Termination | Cable Sealing End (CSE) | XLPE | PART II

  Рет қаралды 9,854

Mission Transmission

Mission Transmission

Күн бұрын

Пікірлер: 13
@JoseAUrdanetaC
@JoseAUrdanetaC 3 жыл бұрын
This series of videos is amazing. Usually project engineers as myself are not able to access these level of detailed information on the field installation. Thanks for sharing it and hope you're able to keep on with the rest of the series.
@TheRamiro234
@TheRamiro234 3 жыл бұрын
Thank you for sharing these highly informative and well-edited videos. Keep uploading such content.
@GoCoyote
@GoCoyote Жыл бұрын
A couple of thoughts from an electrician who has done high voltage connections: Acetone is bad carcinogen, and damages skin tissue. We were always required to wear gloves when cleaning with solvents, and it does not make sense to clean with acetone, and then touch high voltage components with bare hands that will leave behind residue. We were never allowed to touch the high voltage components with bare hands once cleaning commenced.
@mohsin90ish
@mohsin90ish 2 ай бұрын
Great videos. Are you going to finish this series?
@s0012823
@s0012823 Жыл бұрын
21:50 the cable plug should be mounted 180 degrees with the grooves to the contact area with Penetrox or similar.
@AhsanAziz-01
@AhsanAziz-01 8 ай бұрын
Kindly share more videos like this.....waiting for part III
@TheRamiro234
@TheRamiro234 2 жыл бұрын
Is it possible to make a video explaining the workings of different machineries and devices used for stringing operations ?
@dagnachewtsega2746
@dagnachewtsega2746 2 жыл бұрын
Thank you for sharing the Video and it is very clear. I have one questions regarding a project I am involved, the contractor has proposed to apply welding to connect the two core conductors in straight through joints. Do you think it is good option to use welding instead of crimping?
@janardhanReddyvizag
@janardhanReddyvizag 8 ай бұрын
When part III will be explained
@adiladhikari33
@adiladhikari33 3 жыл бұрын
Sir when will you upload next part of this video I waiting for last 2 months
@vigneshmoorthy9633
@vigneshmoorthy9633 3 жыл бұрын
Which company are you from we need gis termination services for our project in aramco
UNDERGROUND CABLE | GIS Termination | XLPE
17:01
Mission Transmission
Рет қаралды 15 М.
$1 vs $500,000 Plane Ticket!
12:20
MrBeast
Рет қаралды 122 МЛН
IXOSIL ESS - The safe, conventional outdoor termination
2:56
PFISTERER
Рет қаралды 12 М.
UNDERGROUND CABLE | Cable Pulling/Laying | XLPE
14:24
Mission Transmission
Рет қаралды 62 М.
Nexans Medium Voltage Armoured Heat-shrinkable Termination (XLPE-HEPR Cables)
5:57
Nexans Power Accessories
Рет қаралды 68 М.
NordLink underground power cables - explanatory film
8:37
35kV Underground XLPE High Voltage Cable
15:10
SpeedFreakLS1
Рет қаралды 29 М.
"For $35,000 I'd Expect it to be Perfect"
42:13
Blacktail Studio
Рет қаралды 6 МЛН
DIY Electrical Service trenching and conduit Installation
14:22
Daniel Woodell
Рет қаралды 268 М.
110kV XLPE GIS Sealing end
12:18
Yingwei Wang
Рет қаралды 45 М.