I was very disappointed for a poor Boq I prepared before two weeks and this explanation is what i needed to improve into next level thanks sir really helpfull and in the right time to understand very well from you
@zainunissamohamed92522 жыл бұрын
Assalamu alaikum, I am from South Africa. Thank you so much for the detailed video. I have subscribed. I teach Construction Management first year students and your videos are very helpful to me and my students.
@CEPQS2 жыл бұрын
Much appreciated 🙏👍, and thank you for your valuable trust. I wish you and your students all the best. 🙂
@khotsodoski8794 Жыл бұрын
At what university. Can u please help me with a few questions I have about admission
@bobbyshett83182 жыл бұрын
I stayed spell-bound for the entire 47mins of the video without getting bored. You did not actually shouted and I did not get any headache. Your concept and delivery is excellent!!! I could see a perfect marriage between theory and field experience. I am looking forward to seeing the FCPI and how it will further consolidate on the overall cost control report. I have inboxed you for the template. Thank you and keep the good work.
@CEPQS2 жыл бұрын
Thanks Bobby for this elaborated feedback. Such support is enough reason to carry on and keep producing content. Much appreciate your valuable watch time and support 🙏👍. Regarding sharing the files, I’m still in search of effective and easy mechanism. Once done I’ll share all the templates of the channel videos. Thank you.
@friendsgroup333010 ай бұрын
Hi Mr. Adel, your videos on Cost Estimating and Cost Control (Cost, price, PV, EV, actual cost etc.) are superb. Today, I had an interview and it became very good after I went through your 4-5 videos in the last 2 days. Thank you and God bless you. I am in Romania.
@emmanuelyeboahobiri5189Ай бұрын
Thanks, you're a great teacher
@rabi.mywork4 ай бұрын
Alhamdulillah for this video... Thank you very much.... You're a blessing to my new learning Mr. Adel
@bourezahkarim3172 Жыл бұрын
The least we can do for you Ahmed is to say THANK YOU!! Thank you very much sir.
@mediabox1141 Жыл бұрын
Love from my bottom of heart. My seniors nevel told me like this. Iam learning all this through this channel. Insha allah iam planning to change my profession qs to planning& cost control
@CEPQS Жыл бұрын
Thanks a lot for your kind support and I wish you all the best 🙏👍
@javvaadagha48973 жыл бұрын
Credible explanation with practical diligence, good job.
@CEPQS3 жыл бұрын
Thanks Javvaad, much appreciated brother.
@panda-xz3wx7 ай бұрын
Wow, you're video is very helpful to beginners like me who want to start my construction project management journey! Thank you very much and I hope you continue to share your knowledge!
@CEPQS7 ай бұрын
Thanks a lot for the kinds words 🙏. I hope you enjoyed the video 🙂
@JaisonJohnjasienjohn2 жыл бұрын
Thank you very much for the best simple and practical explanation. Thanks for your effort.
@CEPQS2 жыл бұрын
Thank you Jaison and appreciate your valued time watching. All the best.
@mohamedaneesabdullatheef36033 жыл бұрын
Really very understandable explanation and you are teaching with very professionally. thank you brother
@CEPQS3 жыл бұрын
Thank you brother. Appreciate the time you spent watching the video and wish you all the best.
@life-20239 ай бұрын
You are amazing Adel ! Thanks a ton !! Keep sharing your knowledge for the benefit of humanity !!
@siby10020048 ай бұрын
Hi Mr Adel, Thank you somuch for such a great teaching...
@muhammedfaizal5180 Жыл бұрын
Barakallahu feek....This is awesome 👍 very detailed and explicit....
@CEPQS Жыл бұрын
Thanks brother. Glad you liked it 👍
@wajirabandara48762 жыл бұрын
You have an excellent teaching ability that attracts anyone who wishes to find the knowledge. I wish you all the success.
@CEPQS2 жыл бұрын
Thank you for watching and for the kind support, and wish you all the best.
@waleedmoustafa22159 ай бұрын
شرحك ممتاز، يعطيك العافية باشمهندس ❤
@SakthiVel-gp2vl2 жыл бұрын
Very useful and easy understanding... thank you sir
@CEPQS2 жыл бұрын
Thank you for watching and support 🙏🙂
@Howtoexcel14 Жыл бұрын
Great work you are doing revealing all the details
@CEPQS Жыл бұрын
Thanks a lot for the support
@fihamahamed12768 ай бұрын
Best KZbin channel ever 🎉❤❤❤
@tariqaziz66432 жыл бұрын
what an amazing video , thanks Ahmad Adil
@poojav62893 жыл бұрын
Clear understanding, thank you so much sir 😊
@CEPQS3 жыл бұрын
Thank you pooja, Hope you enjoyed the video
@sachithgunathunga58662 жыл бұрын
Highly recommend, because I am following his courses ❤️
@CEPQS2 жыл бұрын
A testimonial that I’m proud of. Thank you so much and wish you all the best ❤️
@ronaldcirenis52962 жыл бұрын
@@CEPQS i bought the second course, but for some reason i can't access the first one ("Quantity Surveying, Cost Estimation and BOQ Preparation) to purchase it on your web site
@benchalk35799 ай бұрын
Thank you for your amazing videos and explanations
@jimmyaustria4019 Жыл бұрын
Great Job, simple and Clear. Thank you ..
@vineethv15506 ай бұрын
Sir , your videos was great to understand,can you pls upload labour productivity chart for various work in construction
@eshaojha8554 Жыл бұрын
Excellent Explanation..!Thank you, Sir.
@CEPQS Жыл бұрын
Thank you 😊
@romeledangal6640 Жыл бұрын
Very clear and informative ..thanks 👍 👍 👍 👍
@gum771910 ай бұрын
very easy to learn from you habibibibii
@mohamedzoubirelkan13002 жыл бұрын
Thanks you ,very useful information
@CEPQS2 жыл бұрын
Thank you 🙏🙂
@avbless584611 ай бұрын
awesome, thanks 4 sharing your knowledge. great demonstration
@أحمدصوافطة-ر3ر2 жыл бұрын
شكرا على الشرح الكافي والوافي
@CEPQS Жыл бұрын
اشكرك على المشاهدة و الدعم
@MudhassirMohammed-b7e8 күн бұрын
Assalamalaikum Dear brother Ahmed, Its been around 12 years I am working as a QS in UAE construction field, but last week only I have started to watch your KZbin channel. Only two videos I have watched so far, I hope I will watch all of your videos by coming days. I have already subscribed by the way. Let me say honestly you are such a great teacher and I appreciate your patients on explanation of each and every diminutive points. great and thank you very much. May Allah bless you. can you clarify one doubt by the way?.. Is the Earned value is same value which we receive from our client through interim payment? if not, can you explain how we can find those Earned value?.
@pragashtharantharumalingam3315 Жыл бұрын
Very useful lesson . Best of luck
@CEPQS Жыл бұрын
Many many thanks. Good luck to you as well 👍
@MohamadRoushenHasair Жыл бұрын
wow , best explantions , simpel and clear ❤
@christianconcepcion68132 жыл бұрын
Amazing explanation!!!
@CEPQS2 жыл бұрын
Thanks for watching 🙏🙂
@moggyman6413 Жыл бұрын
Wow, wow this has helped me so much. I can't believe that you have explained this extensive information In 47 minutes and more importantly I have fully understood it. Can I please ask how do I create and format the spreadsheets showing the blue, red and yellow lines. Thank you so much
@ConsciousLiving1113 күн бұрын
Thank you so much❤
@usmansaeed48502 жыл бұрын
Very well explained
@CEPQS2 жыл бұрын
Thank you brother ❤️
@Absadumar2 жыл бұрын
This is very educative, thank you very much.
@mostafaelgablawy164 Жыл бұрын
thank you so much sir that's what I need that's too clear
@CEPQS Жыл бұрын
Thanks a lot for watching and support. Wish you all the best 🙏
@kato_emmanuel3 жыл бұрын
Weldone sir, so insightful and informative. I keep learning a new concept each day i visit the channel
@newmanishiguzor31065 ай бұрын
Thanks for the info..
@CuongNguyen-jj2he2 жыл бұрын
Thank you for sharing, this is very interesting and helpful
@CEPQS2 жыл бұрын
Thank you for watching and support
@Cryptoguy892 жыл бұрын
Keep it up your good work mate
@CEPQS2 жыл бұрын
Thank you brother and much appreciate your valued support. All the best and Ramadan Kareem.
@Cryptoguy892 жыл бұрын
Deserves more views for such a quality content. You will get soon for your efforts Insha Allah. Ramadhan Kareem.
@benchalk35799 ай бұрын
You are a legend Sir
@zeeshan-wz3vv Жыл бұрын
Very nice professor ❤ Impressive explanation Great job
@caiphasmutata983711 ай бұрын
Your video is so educational, thanks for sharing. I just have one question that I need clarity on: Why on the computation of the EV are you using the internal values? I thought only the cost part of it should be the internal value but the PV and the EV should be based on the BOQ submitted to the employer. May you kindly add more light on this? Thank you in advance.
@uke_kristy_hendarto Жыл бұрын
very clear, thank you, be blessed.
@CEPQS Жыл бұрын
Thank you 🙏 and wish you all the best 😊
@relaxingstressreliefmedita80462 жыл бұрын
u saved me! thanks
@CEPQS2 жыл бұрын
Thanks for the support 👍, did you like the video ?
@ndyamusiimaarchangel47132 жыл бұрын
Great.Thumbs up to you.
@CEPQS2 жыл бұрын
Thank you 🙏😊
@jublieeyes10 ай бұрын
Please share link of next video about project controls and estimated EV
@atusaasirajoshua321 Жыл бұрын
its a nice one
@gasanageorge20057 ай бұрын
Thanks!
@murishodzic1353 Жыл бұрын
"It's commendable that your team has worked hard on this project, even if it resulted in going over the estimated timeline. However, it's important to keep in mind that the cost to the client may also exceed the original estimate
@flkmbck2 ай бұрын
Hi, Adel. Wouldn't be more didactically correct to calculate CPI by AC/EC? Once this quotient would be how efficient I use my EV. What does the 1.41 (141%) CPI actually mean? Thank you!
@markpalm672 Жыл бұрын
Thanks a lot for your presentation. I have one question about EV. The Client has got an initial planning for costs (PV)so he can prepare accordingly his payments .What if he refuse to pay 60000 saying that he had planned to have only about 30000 available for first month? If so, then i assume the Contractor will not have the same enthusiasm to continue with high EV at the early stages of project.
@CEPQS Жыл бұрын
Thanks a lot for watching and support. The client will usually have some reserve in case the value of executed works exceeded the planned value. But generally there is a limit to what can be done in 1 month considering the constrains that can be in the schedule due to the activity relationships and available work fronts. So the earned value will most of the time match the planned value or less. Increasing resources in some cases will not always enable you to seriously push the work and reduce the duration.
@writetopardeep Жыл бұрын
so helpful
@CEPQS Жыл бұрын
Glad it was helpful!
@超级无敌大赢家10 ай бұрын
Go to be a professor in the university, i think u more better than them.
@mukundviswanathan34656 ай бұрын
Hi Mr. Adel, I watched this detailed video 2 to 3 times, however, i feel Earned value for every month shall be based on our price (equal to our monthly invoice submitted). so that the final cumulative earned value shall be same as our contract price. please correct me if i understood wrongly.
@lovenaturelovenature2156Ай бұрын
Let's make some sheets in which we collect data on cleaning material which one is used more
@healthylifestyle4346Ай бұрын
Great lectures sire i have a problem If a company precast 7 elements/ day and it takes 5 days for the elements to be harden. those incharge of laying can lay 12 elements in a day and the total number of elements to be precast is 420 elements. NB: start of laying is 20days and end if laying is 55days 1. when can pre-casting start so that laying of elements will not be interrupted 2. determine the maximum number of elements that can be stocked on the site. Thanks sire. i will be waiting for anyone to help me out
@njikumedwin17552 жыл бұрын
Thank you sir, for this well prepared training materials, very useful in the industry. please for the link to enroll for the two courses.
@gorgiassokrates Жыл бұрын
Can i assume earned value is payment certificate amounth that we calculated each month. Thank you for your valuable lessons god bless you,
@CEPQS Жыл бұрын
Well, not the net payment amount, because it will include the deductions. But you can say the total work done is the earned value. For example 1,000,000 out of 2,000,000. But the 1,000,000 will be subject to retention and recovery of advance payment and deducting the previously paid as well. So maybe your net payment in the end is just 150,000 this month. But still the earned value is 1,000,000 👍. Thank you for the question and wish you all the best 🙏
@Queen34678 Жыл бұрын
good knowledge thank a lot
@CEPQS Жыл бұрын
Thank you 🙂
@OmarAl93 Жыл бұрын
Thanks for the wonderful explanation. Could you please clarify how the Earned Value at 1st month was calculated?
@CEPQS Жыл бұрын
Thank you for watching and support. EV is the total of the work done. Please refer to this video kzbin.info/www/bejne/oZ68aaRmdrd4lc0
@AhmedSalama-uq2il3 жыл бұрын
Great work👍👍👍👍👍
@babaksaeidi-q5j Жыл бұрын
great. Thanks
@Rafaykhan-o9n Жыл бұрын
Thank you for this detailed video. One question I have, however, is how feasible is it to calculate the ‘earned’ value in the real word. I don’t think you spoke to how you arrived at the numbers in EV row. Could you shed some light here please ? Thank you in advance!
@CEPQS Жыл бұрын
The earned value is calculated monthly when you prepare your payment applications 😊. So every month you know the percentage completed and the earned value. There are 2 videos on the channel on how to prepare payment application, I believe they would clarify your concern 😃
@shehinhn47732 жыл бұрын
Sir, Kindly do for infrastructure works also (like bridges, highways and tunnel)
@CEPQS2 жыл бұрын
Thank you for the request 👍🙏. Apologies I don’t have that experience but I’ll do my best to compile some information and make a video on that 🙂
@moggyman6413 Жыл бұрын
I am trying to set up the spreadsheet above, do you have a template I could download which includes the formulas to generate the charts. I would really appreciate it, Thank you
@sifathsifath443 Жыл бұрын
excellent 😎
@CEPQS Жыл бұрын
Thank you 🙂
@TheHamzaysm2 жыл бұрын
Hi Sir, well explanation without getting bored, i have a question for you that how did you find Actual cost and Earned value, are those ur assumption amount or u found somewhere ?, kindly explain. Thank you
@CEPQS2 жыл бұрын
Actual cost will be calculated monthly for the activities executed in each month. In this example everything is an assumption just to clarify the concept.
@ahmadfareedthoufeek1133 Жыл бұрын
I have some questions 1) When we make budget, can we add the same cost for PS? 2) How about retentions , advance payment ,repayment of advance payment, recovery of retentions while making cash flow? 3)EV is the monthly payment from Client in our payment certificate?
@CEPQS Жыл бұрын
1) for PS - yes without the margins 2) terms of payment have nothing to do with cash flow of the project (that is submitted to the client). You may consider these things in your internal cash flow. 3) EV is the total approved work done without any deductions
@CEPQS Жыл бұрын
The above is my sole opinion. No references
@wasswaoumar7755 Жыл бұрын
Nice video sir could please elaborate using Ms project
@CEPQS Жыл бұрын
Alright 🙂
@CEPQS Жыл бұрын
Thank you 🙏
@willyzgambokawirima85092 жыл бұрын
powerful
@CEPQS2 жыл бұрын
Thank you 😊
@dipeshsawant4628 Жыл бұрын
Wher I got link for study
@asalemeor3 жыл бұрын
Nice 👌
@ayushmansdiary26949 ай бұрын
Hi sir, can I purchase this course now?
@muhammedshaatheer65743 жыл бұрын
Thank You
@CEPQS3 жыл бұрын
Thank you brother, I hope it was useful
@gotlboys Жыл бұрын
Great educational video. One question: Why the cash flow for earned value (EV) or yellow line at the end of the project completion is not equal to the total project price (i.e. $2.4M)? Thanks
@husseinhurayz5998 Жыл бұрын
B3cause the earned value wad calculated depends on planned cost, not BOQ prices ( earned value = BOQ price - margin)
@shadishadi569411 ай бұрын
@husseinhurayz5998 hello sir, thank you for the explanation, i have one question please, so the EV is the total work done from progress payment or we need to deduct the margins from each item, and do we need a software or we can do it by excel, thank you in advance
@akarqadir3 жыл бұрын
thanks so much ...
@CEPQS3 жыл бұрын
Thank you bro ❤️
@shafishan906410 ай бұрын
How can I join your course for cost control
@sakooo12 Жыл бұрын
thanks for the wonderful sessions, can i please have the template that you worked on the video??
@CEPQS Жыл бұрын
I'll arrange it for you shortly. The problem is that I don't have the template on the PC that I'm using these days.
@sakooo12 Жыл бұрын
@@CEPQS well yes please I would really appreciate if you could do that for me . And let me know please if there’s any cost is associated with it
@vanadjei96982 жыл бұрын
This is super. In fact u r a genius Ahmed cos I'm not not QS but the depth of knowledge acquired from this to my Acc is fully packed. Thanks for taking me to the higher level
@CEPQS2 жыл бұрын
Thanks Van for your time watching and your kind support 🙏🙂. Much appreciated 👍
@balogunayodeji57592 жыл бұрын
Thanks for this insightful video sir! Can I get this template?
@CEPQS2 жыл бұрын
Thanks a lot for watching. Sure, contact me at info@costengpro.com
@MrLou000Ай бұрын
Do you have a internship program
@IP_8579 Жыл бұрын
hi,really appreciate your work,my question is if it's normal to disclose a breakdown of cost as per BOQ and the margins if a client request it(or there are things we don't reveal),regards
@CEPQS Жыл бұрын
Depends, sometime contractors need to play with such stuff 😅
@thukaramyadav73242 жыл бұрын
how to get standard productivities for CEMM3 Codes BOQ items
@CEPQS2 жыл бұрын
Already shared under the other comment 😊
@asrafa84382 жыл бұрын
Explain about fidic
@CEPQS2 жыл бұрын
Ok 👍
@thukaramyadav73242 жыл бұрын
how to calculate RATE ANALYSIS OF CESMM3 CODE WISE ITEMS COEEFICIENTS or Productivities FOR LABOUR HOURS ,MACHINARY hours etcc. (rate analysis)
@CEPQS2 жыл бұрын
There are several videos on the channel talking about labor and material cost estimation, I’m listing 2 of them down here, but there are more talking about the form and all of that 👍
work as aquantity surveyer civil engineer in misr qs company iwiil be so grateful if any one has work to do for we are afreelancing company Thanks
@splay88442 жыл бұрын
it was labor contract
@CEPQS2 жыл бұрын
Ok 😀
@dipeshsawant4628 Жыл бұрын
I need this excel file
@AceCPAsBookkeeping3 ай бұрын
TLDR: Cost control in construction projects involves monitoring planned value, actual costs, percentage completed of budget, schedule performance index, and cost performance index to ensure the project stays within budget and on schedule. 00:00 🏗 Understand how to create a cash flow for construction projects by preparing a quantity take off and bill of quantities, estimating costs, and managing the difference between cost and price. 02:57 🏗 Cost control in construction projects involves obtaining drawings, pricing, and cost estimation activities, with contractors submitting detailed programs and cost breakdowns for approval to effectively track and control project costs. 09:32 🏗 Understanding cost control in construction projects involves scheduling activities, submitting bills based on completion, and tracking planned values and cash flow over time. 16:26 🏗 The process of cost control in construction projects involves monitoring the scheduled and cumulative value of work done over time. 19:50 🏗 Prepare project budget by removing margins from cost estimate, execute project at budgeted amount, calculate costs of works, understand budgeting, focus on planned values and cost baseline. 26:02 🏗 Planned budget for construction project was exceeded, leading to termination of project manager, as the speaker explains the concept of planned value, actual cost, and earned value management in construction projects to track and analyze project spending. 32:24 🏗 Exceeding planned costs can still be favorable if earned value is higher, reaching 100% of budgeted amount, even if actual cost is higher, and budget plan changes can result in cost underrun and finishing ahead of schedule. 36:37 🏗 Cost control in construction projects involves monitoring planned value, actual costs, percentage completed of budget, schedule performance index, and cost performance index to ensure the project stays within budget and on schedule.
@arbazhodekar80072 жыл бұрын
very nice information .Love you too Sir...!!!!!! please send your linkedIn profile
@CEPQS2 жыл бұрын
Thank you 😊.
@samueladeolu846Ай бұрын
please how can i contact you ?
@bamidelefestusoladimeji3358 Жыл бұрын
How do I get you on LinkedIn.
@CEPQS Жыл бұрын
It is Ahmed Adel in LinkedIn
@humbertodiaz3137 Жыл бұрын
Hi, very explained video, congratulations I would like to ask you, which are they courses for activities and for BOQ there is just one link, Could you share the course links?
@CEPQS Жыл бұрын
Thank you for watching and support. Currently courses are being updated. Better wait until the revised courses are published and announced ☺️