This project required two, 300 foot, 28 inch bores to accommodate a pull back of five, six inch conduits in each bore hole. The conduits were tested to 90 psig, and each inner-ducts was also tested to 90 psig. The purpose of the bore was to facilitate continuous fiber and power along a tollway to power lights, sensors and cameras.