Thank a rig worker for your petroleum products you use every day!
@TrueIndie883 жыл бұрын
Bad ass. Every tone I fill up my car I will remember this.
@mithundevadiga2329 Жыл бұрын
Great job guys.nice communication good team work ✌👌👌👌❤
@rooodg5 жыл бұрын
I've worked in ENSCO of Brazil in ENSCO 8500 and ENSCO 6004 for 2 years, the best company that i've worked ever... NICE PULLING RISER OPERATION... Ensco always the best.
@IRISHSTUBIE2 ай бұрын
WOW! I have done some rod trippin in my days, but that gear is gargantuan
@Carlitosway2117 жыл бұрын
Miss those days!
@uwemjimmy311110 жыл бұрын
The pulling Mariner Riser
@fabiomuniz48326 жыл бұрын
Cara é doidao heim. Debaixo do rises
@markwitte99678 жыл бұрын
ok...I understand the bolts and flange connection...but how do the umbilicals connect? some sort of slip joint? I don't see anyone working on them...they provide electric and hydraulic power, right?
@keeblertime1486 Жыл бұрын
I kinda want to get back out there. Miss that oil field life.
@wagnervalente240411 ай бұрын
Excelente trabalho! Mas com a tecnologia do ROBO SPIDER, desenvolvido pela empresa americana TORQ LITE, esse trabalho seria muito mais rápido, seguro e com menos pessoas envolvidas.
@Jonay19908 жыл бұрын
Forgive my lack of technical terms and names for the parts, but the part that lifts the riser ( what we see being disconnected from 5:40 and connected to the next riser at 6:00) how is that secured? Is it by vacuum? I can't see any fasteners but I do see a couple of air lines connected/disconnected between the process?
@rfw7008 жыл бұрын
+Jonay. Normally the deep water riser is connected to other joints of riser by 8 bolts of roughly 2 1/2" diameter. These are torqued by hydraulic torque wrenches to about 1000 ft/lbs of torque. However, when lifting or lowering riser and the BOP. Each new joint is lifted or lowered using a lifting nubbin. This is the part you see being disconnected from the joint being laid out, and reattached to the next joint to be laid out. This is secured in place ready for the lift, by a hydraulically activated locking ring. The locking rig is activated by about 3000 psi of hydraulic power, then the hoses are disconnected so trapping the activation pressure. The load being lifted can be up to 1000 tons.
@Jonay19908 жыл бұрын
+robert west Thanks for that, it was puzzling me, but yes a hydraulic action would be more sensible than vaccum (I don't know what I was thinking!). I see this equipment going in and out from the docks all day (work at the quayside doing the logisitcs for the vessels coming and going offshore) but piecing all the parts together interests me, your videos are a great help!
@jeffreykreft5442 Жыл бұрын
It’s a hydraulic clamp
@rogansteeven167210 ай бұрын
@@rfw700Sorry to bump the old thread. To clarify a bit, the lifting nub can grip the riser by giving it hydraulic pressure up to 3000 psi and loose the grip by using torque to release the hydraulic pressure. Is my understanding correct?
@arriecohen26723 жыл бұрын
I thought this might’ve been a Maersk rig
@supportmalphite8769 Жыл бұрын
God damn those bales are fucking huge
@Leningrad_Underground3 жыл бұрын
This outfit is like watching paint dry. Somebody go for the sandwiches & coffee, before I fall asleep
@stuipooey14 ай бұрын
What do you know 😂
@Leningrad_Underground4 ай бұрын
I started as a Rst,about on the SEDCO 703 in 1975 on the Magnus field north of shetland. In 19 77 I ws with Reding &Bates in the Gulf of Suez on a tender rig the "W.D. \kent. as derrickman and Asst. Driller and H E Bates off Congo. 1982 I was back in North sea with DIVI Offshore as Asst. Driller then with Nedrill on the drillship Nedrill 2 offshore Newfoundland. Spain Meditterranian. Senegal Carribian off Aruba Gulf of Mexico off Humor. Then to Vietnam Off Dar nang and Vung Tau. The Phillipines Off Palauan. 1991 down to south africa for one well on route to Brazil from 1991 to 1996 as driller. took a break with Mersk in China on the "NanHi 2 " as Driller then with Arabian drilling in the south of KSA drilling longreach horiontal wells 11 K meters. finally with Global Santa Fe in the Caspian Sea off Baku as Tool pusher on the "Istiglal" drilling for Chevron and Exon on the Nachivan prospect "Nachivan I" 7467 Meters TVD vertical well 1,000,000 Lbs on the Martin decker when I landed the 9 58/ Casing. Retired in 2003 . And You sir? @@stuipooey1
@user-xm2qh3wg2u3 жыл бұрын
ต่อท่อขึ้นไป
@pitbroox4322 жыл бұрын
Awesome "Red Zone Management" 😆 Nice job, but F...... H...!!!
@sdakshin9 жыл бұрын
is the white fixture a spider? it holds the riser joint while the next one is going to be pulled. but i am curious as i have not seen a spider in that shape before.
@isaiah80538 жыл бұрын
that is the spider. they look different on drillships.
@isaiah80538 жыл бұрын
this was Ensco 8502
@oldbutbold8 жыл бұрын
+Dakshin Sudarshan perhaps different legacy brands under NOV. this should be Varco's. most of the recent drillships built in South Korea have Hydralift legacy.
@rfw7008 жыл бұрын
+Dakshin Sudarshan That's a typical hydraulically activated spider as used on deep water semi's and drillships. Below the spider, there will sit a gimbal which will allow the supported string of riser to remain vertical, while the drillship or semi, continues to pitch and roll. On shallow water semi's and drillships they more normally consist of 4 manually activated drop down dogs, which sit underneath the flange of each riser joint.
@user-xm2qh3wg2u3 жыл бұрын
ให้โครงการสร้างบ้านไป
@glimpsepedroza43933 жыл бұрын
So its true. Oil rig riser are massive, so the TUNA also.
@akimbojimbo37633 жыл бұрын
Between 54 and 72 inch outside diameter is common for the neutrally bouyant risers (which these appear to be)
@TanujbabuTanuj900009 жыл бұрын
what is that platform you working on ?
@isaiah80538 жыл бұрын
this is Ensco 8502
@ericjarvie Жыл бұрын
Good to see an mechanical grab in action on this Rig but in this day and age is there any reason brute human labour should be the resource and should it have any place handling equipment like this?
@user-bh4be2of1g2 ай бұрын
Hi gays, say me international company sabsea and surface please. I have experience .
@user-xm2qh3wg2u3 жыл бұрын
การลงทุนมหาศาล
@karinamachado83846 жыл бұрын
Good Morning! Could someone provide me the Man Rider to study?
@Caldeireiro.2 жыл бұрын
Yes
@user-xm2qh3wg2u3 жыл бұрын
เขาเงียบตอนนั้น
@fernandosantos87734 жыл бұрын
👍👍👍👍💪💪 show
@oldbutbold9 жыл бұрын
Ensco 8500 series semis?
@isaiah80538 жыл бұрын
Ensco 8502 to be exact.
@oldbutbold8 жыл бұрын
+Dylan Sauce i see. thanks for the verification. i heard they are some of the most outstanding rigs so far. good stuff.
@isaiah80538 жыл бұрын
Yeah we did a lot of work.
@user-xm2qh3wg2u3 жыл бұрын
เทคอนกรีตปิด
@quocnguyencuu9828 Жыл бұрын
Ocen general
@nicmar19162 жыл бұрын
Pqp floorhand debaixo do riser.🤦
@jeffnone4108 жыл бұрын
OK but wtf is it and why are you changing it???
@epistte8 жыл бұрын
The riser is the piece of pipe between the wellhead/BOP stack on the sea floor and the drill ship/platform. it forms a conduit for drilling mud and pressure control around the drill string.
@dustyflair7 жыл бұрын
Simply put...its a long fucking drill bit...
@jeffnone4107 жыл бұрын
Thanks.
@onthegreenintwo7 жыл бұрын
Rick Fountain what? The riser is a drill bit? That's is not its purpose not even close. Hopefully I missed a comment or something because you could not be that stupid.
@jeffnone4107 жыл бұрын
There where no comments only two questions.This is for us non marine drillers. Just what is a marine riser and why do you have to change?
@makmunsanah.bangkrutroti49292 жыл бұрын
Terapy vaksin out
@swang67826 жыл бұрын
Bunch of union dudes growing hemorrhoids standing around, nothing to see here but wasted money
@QwikKota5 жыл бұрын
You would be wrong. Offshore workers are not in a union and it is very tough work. On your feet for 12 hours a day, for at least 2 weeks straight. Dangerous but rewarding for those taking the risk. No degree required.