Feels like a weekday crowd. I tap out at 10:28 along aye towards queestown even with bike this past wed. Kudos to you for completing the whole journey.
@4jsangels113 жыл бұрын
Excellent editing and filming really amazing views the beauty of natures was absolutely perfect
@BaySean3 жыл бұрын
The railway tracks being replaced by walking and cycling paths after a decade.. hope the old Tanjong Pagar Railway Station becomes a museum and Bukit Timah Railway Stn made into a heritage monumental library.
@Muhaimin47busfan3 жыл бұрын
Amazing 😍😍😍 still waiting for CCL station to be complete in 2025
@justwalk-travelasmrchannel16303 жыл бұрын
Thanks for the share! Added to next walking goal 👍
@lkjter29693 жыл бұрын
Have been looking forward to the rail corridor since it has been return to Singapore. From Hillview to Tanjong Pagar stretch would be good as it passes thru many HBD neighbourhoods along the way. The main problem is when, the track is ready but those access passages to the tracks have yet to be built. Have written to NPark but no one bother to reply.