Raising RFI and Its Attachment

  Рет қаралды 2,504

2i Constructions

2i Constructions

Күн бұрын

Check for more details..
video 01
• RFI, Raising/Closing &...
RFI / WIR |Request for Inspection| |Work Inspection Request|
• RFI / WIR |Request for...
Waterproofing of Roof Slabs |SAES-M-100||SATIP-M-100-02|
• Waterproofing of Roof ...
Steel Reinforcement Inspection |SAES Q 001| |ACI 117, 301, 315, 318| |09-SAMSS-106|
• Steel Reinforcement In...
YOUR QUIRIES:-
RFI
request for inspection and testing
request for inspection
mechanical engineering
work inspection request
workplace inspection training videos
quality inspection
qc inspector course
qc course institute
qa/qc civil engineer
qa/qc mechanical engineer responsibilities
qa qc interview questions
request for inspection in construction
request for inspection rfi
request for inspection procedure
work inspection request
request for inspection
inspection request
request for inspection rfi
site inspection request
construction work inspection request
inspection
material inspection request
request for inspection procedure
civil site inspection request
inspection report
construction inspection request
request for inspection in construction
inspection request in construction
request for inspection documents required
material inspection procedure

Пікірлер: 24
@MuhammadMusa-n9r
@MuhammadMusa-n9r Жыл бұрын
wow em big fan sir ALLAH BLESSED U
@SaqibToria
@SaqibToria 6 ай бұрын
Nice
@Numan-skills
@Numan-skills Жыл бұрын
Thank you brother
@IftikharHusain-n2l
@IftikharHusain-n2l 11 ай бұрын
Thank you for make it easy and simple..
@2iconstructions918
@2iconstructions918 10 ай бұрын
You are welcome 😊
@TheFilmFanaticFile-zj9jh
@TheFilmFanaticFile-zj9jh 7 ай бұрын
Sir aramco ki checklist share kr den discription mn .
@2iconstructions918
@2iconstructions918 7 ай бұрын
Please reach us at 2iconstructionz@gmail.com.
@2iconstructions918
@2iconstructions918 7 ай бұрын
📍📍📚📚📚📍📍 *SAUDI ARAMCO TYPICAL INSPECTION PLANS (For civil work)* 1 SATIP-A -000-01 Soil Improvement (Vibro Replacement & Vibro Compaction) CVL 2 SATIP-A-104-01 High Density Polyethylene (HDPE) Liner for Wastewater Disposal Evaporation Ponds CVL 3 SATIP-A-113-01 Geotechnical Investigation CVL 4 SATIP-A-114-01 Earthwork - Site Preparation, Excavation and Backfill During Construction CVL 5 SATIP-B-006-01 Fireproofing Concrete CVL 6 SATIP-H-003-01 Coating Application on Concrete Surfaces CVL 7 SATIP-L-450-01 On-Land and Near-Shore Pipelines CVL 8 SATIP-M-006-01 Security and General Purpose Fencing CVL 9 SATIP-M-100-01 Concrete Masonry Units and Building Bricks CVL 10 SATIP-M-100-02 Waterproofing of Roof Slabs CVL 11 SATIP-M-100-03 Structural Steel - For Buildings CVL 12 SATIP-M-100-04 Pre-Engineered Metal Buildings CVL 13 SATIP-M-100-05 Gypsum Board System Installation CVL 14 SATIP-M-100-06 Ceramic Wall and Floor Tiles CVL 15 SATIP-M-100-07 Doors and Windows CVL 16 SATIP-M-100-08 Acoustical False Ceiling System CVL 17 SATIP-M-100-09 Glass and Glazing CVL 18 SATIP-M-100-10 Resilient Vinyl Composition Floor Tile & Base CVL 19 SATIP-M-100-11 Raised Equipment Floors System CVL 20 SATIP-O-101-01 Security Fencing & Gates, (Type SSD1 Standard Security Fence) CVL 21 SATIP-Q-001-01 Ready Mix Concrete Batch Plants and 3rd Party Laboratory Management CVL 22 SATIP-Q-001-02 Cast-In-Place Portland Cement Concrete CVL 23 SATIP-Q-001-03 Pre-Cast Concrete Fence Posts at Fabrication Yards CVL 24 SATIP-Q-001-04 Structural Precast Prestressed Concrete at Fabrication Yards CVL 25 SATIP-Q-006-01 Conventional Asphalt & Sulfur Extended CVL 26 SATIP-Q-006-02 Conventional & Sulfur Extended Asphalt Paving CVL 27 SATIP-Q-006-03 Foamed Asphalt Stabilization CVL 28 SATIP-Q-010-01 Cement Based Non-Shrink Grouting CVL 29 SATIP-Q-011-01 Epoxy Grout For Machinery Support CVL 30 SATIP-Q-012-01 Installation of Structural and Architectural Pre-cast Concrete CVL 31 SATIP-S-070-01 Earthwork - Excavation and Backfill For Under Ground Utilities
@2iconstructions918
@2iconstructions918 7 ай бұрын
🔴🔴 *SATIP-M-100-01 Concrete Masonry Units and Building Bricks CVL* 1 SAIC-M-1006 Concrete Masonry Unit (CMU) Compressive Strength and Aggregate Test Reports CVL 2 SAIC-M-1007 Masonry Materials Receiving and Storage Inspection CVL 3 SAIC-Q-1007 FBE Rebar & Embedments Receiving Inspection CVL 4 SAIC-M-1008 Concrete and CMU Surface Preparation and Protection Inspection CVL 5 SAIC-M-1009 Masonry Units and Plaster Installation Inspection CVL 🔴🔴 *SATIP-M-100-02 Waterproofing of Roof Slabs CVL* 1 SAIC-M-1012 Waterproofing Receiving and Storage Inspection CVL 2 SAIC-M-1014 Waterproofing Surface Preparation, Waterproofing Layer Installation Inspection final CVL 3 SAIC-M-1018 Waterproofing Final Inspection final CVL 4 SATR-M-1014 Roof Flood Testing CVL 🔴🔴 *SATIP-M-100-04 Pre-Engineered Metal Buildings CVL* 1 SAIC-M-1031 Pre-Engineered Building Components Material Receiving, Handling & Storage Inspection CVL 2 SAIC-M-1032 Pre-Engineered Building - Foundations and Pre-Installation Inspection CVL 3 SAIC-M-1033 Pre-Engineered Building - Components and Accessories Installation Inspection CVL 4 SAIC-M-1034 Pre-Engineered Buildings - Interior and Exterior Final Inspection CVL 🔴🔴 *SATIP-M-100-05 Gypsum Board System Installation CVL* 1 SAIC-M-1035 Gypsum Board System Receiving & Storage Inspection CVL 2 SAIC-M-1037 Gypsum Board Framing, Insulation, and Pre-Installation Inspection CVL 3 SAIC-M-1038 Gypsum Board Installation Inspection CVL 4 SAIC-M-1039 Gypsum Board System Plastering, Finishing and Final Inspection CVL 🔴🔴 *SATIP-M-100-06 Ceramic Wall and Floor Tiles CVL* 1 SAIC-M-1041 Ceramic Wall and Floor Tiles and Accessories Receiving and Storage Inspection CVL 2 SAIC-M-1043 Ceramic Wall and Floor Tile Pre-Installation and Surface Preparation Inspection CVL 3 SAIC-M-1044 Ceramic Wall and Floor Tiles Installation and Final Inspection CVL 🔴🔴 *SATIP-M-100-07 Doors and Windows CVL* 1 SAIC-M-1046 Metal Doors & Windows Receiving Inspection CVL 2 SAIC-M-1047 Metal Doors and Windows Pre-Installation Inspection CVL 3 SAIC-M-1049 Metal Doors and Windows Installation Inspection CVL 4 SAIC-M-1051 Metal Doors and Windows Final Inspection CVL 🔴🔴 *SATIP-M-100-08 Acoustical False Ceiling System CVL* 1 SAIC-M-1052 Acoustical False Ceilings Receiving & Storage Inspection CVL 2 SAIC-M-1053 Ceilings Suspension System Installation Inspection CVL 3 SAIC-M-1054 Acoustical False Ceilings Installation & Final Inspection CVL 4 SAIC-M-1055 Raised Equipment Floor Installation and Final Inspection CVL 🔴🔴 *SATIP-M-100-09 Glass and Glazing CVL* 1 SAIC-M-1057 Glass & Glazing Receiving and Storage Inspection CVL 2 SAIC-M-1059 Glass & Glazing Pre-Installation Inspection CVL 3 SAIC-M-1060 Glass & Glazing Installation & Final Inspection CVL 4 SATR-M-1060A Glass Window or Glass Curtain Wall Installation Leak Test Procedure and Form CVL 5 SATR-M-1060B Glass Window or Glass Curtain Wall Installation Tests and Warranties CVL 🔴🔴 *SATIP-M-100-10 Resilient Vinyl Composition Floor Tile & Base CVL* 1 SAIC-M-1062 Resilient Vinyl Floor Tile & Base Receiving & Storage Inspection CVL 2 SAIC-M-1063 Resilient Vinyl Floor Tile Pre - Installation inspection CVL 3 SATR-M-1063 Concrete Floor Moisture and pH Tests (For Resilent Vinyl Purposes) CVL 4 SAIC-M-1064 Resilient Vinyl Floor Tile Installation and Final Inspection CVL 🔴🔴 *SATIP-M-100-03 Structural Steel - For Buildings CVL* 1 SAIC-M-1065 Review of Procedure for Tightening of High Strength ASTM A325 and A490 Bolts CVL 2 SAIC-M-1066 Review of Procedure for Localized Heating to Correct Warping CVL 3 SAIC-M-1067 Receiving Inspection of Structural Steel Shapes & Plates CVL 4 SAIC-M-2021 Bolts, Nuts and Washers Receiving CVL 5 SAIC-M-2004 Fabricated Steel Structures Receiving CVL 6 SAIC-M-1068 Storage, Handling and Preservation of Structural Steel Materials and Components CVL 7 SAIC-M-1069 Inspection of Support Foundation Prior to Structural Installation CVL 8 SAIC-M-1070 Inspection Of Structural Alignment During Erection CVL 9 SATR-M 2001 10 SAIC-M-1071 Repair Correction of Errors of Structural Alignment CVL 11 SATR-M-2002 Pre-Installation Procedure Verification Testing of Turn-of-the-Nut Method (ASTM A325 or A490 Bolts) CVL 12 SATR-M-2003 Pre-Installation Procedure Verification Testing of Direct Tension Indicator (ASTM A325 or A490 Bolts) CVL 13 SATR-M-2004 Pre-Installation Procedure Verification Testing of Calibration Wrench (ASTM A325 or A490 Bolts) CVL 14 SAIC-M-1072 High Strength Bolts Tightening Inspection and Testing (ASTM A325 or A490 Bolts CVL 15 SAIC-M-1073 Inspection of Structure Installation CVL 16 SAIC-M-1074 Structural Re-instatement Punchlisting CVL 17 SATR-A 2011 Re-instatement Checklist (Form) or Punchlist Form CVL 🔴🔴 *SATIP-M-100-11 Raised Equipment Floors System CVL* 1 SAIC-M-1055 Raised Equipment Floor System nstallation and Final Inspection CVL 2 SAIC-M-1075 Raised Equipment Floor Material Receiving Inspection CVL
@ItachiUchiha-q8v
@ItachiUchiha-q8v Жыл бұрын
Aoa sir main saudi azad visa pe aya ho bachelor kiya hai geology mai civil lab technician bhi raha ho 2 years pakistan main yaha 1 month se ho konsa job sahi rahega sab aramco approved mangte hai koi advise doge tu mehrobani hogi
@2iconstructions918
@2iconstructions918 Жыл бұрын
"Welcome to KSA, brother! There are numerous opportunities for lab technicians in non-Aramco projects as well. Prepare yourself with updated standards and specifications. Search for jobs on expatriates. Join some WhatsApp groups with the help of your friends, and seek advice from them. Insha Allah, you will secure a very good job."
@abidullah7523
@abidullah7523 Ай бұрын
SAPMT,PID Abbreviation ?
@2iconstructions918
@2iconstructions918 Ай бұрын
@@abidullah7523 SAPMT Saudi Aramco project Management System SAPID. Saudi Aramco project inspection division
@RizwanShaikh-by1rw
@RizwanShaikh-by1rw 6 ай бұрын
after filling the rfi excel format from. where we have to submit rfi form whether its a separate app are there or through WhatsApp we have to submit rfi form for both aramco and non Aramco project?
@2iconstructions918
@2iconstructions918 6 ай бұрын
@RizwanShaikh-by1rw once you're done with the inspection and everyone has signed off, you need to upload the RFI front page, ITP, checklists, drawings, and any other relevant documents to EPM/QMIS/Acconex. As for informing your team about the inspection schedule, each PID has their own preference. You can either share your daily RFI log via email or send them a list of scheduled activities on WhatsApp. Here's an example for you: *RFI SCHEDULE FOR 7TH AUGUST 2024* 1. Inspection Request - Cement Based Non-Shrink Grout (Sikadur-114) Surface Preparation & Formwork Installation for Seal plan 53B (X03-G--0118A,B) OWS 2. Inspection Request - Cement Based Non-Shrink Grout (Sikadur-114) Surface Preparation & Formwork Installation for Seal plan HRS 3. Inspection Request - Mixing, Placement, Sampling, Testing, Curing, and Final installation of Cement Based Non-Shrink Grout (Sikadur-114) for Seal plan
@RizwanShaikh-by1rw
@RizwanShaikh-by1rw 6 ай бұрын
How many hours before we have to submit rfi?
@2iconstructions918
@2iconstructions918 6 ай бұрын
@RizwanShaikh-by1rw All inspection requests will be submitted as follows:  At least twenty-four (24) hours prior to the time of the inspection for normal work hours (7:00 AM - 5:00 PM, Saturday through Thursday), or according to Client’s Schedule.  Forty-eight (48) hours for weekend or holidays.  Remote Areas: A minimum of 48 hours advance notice is required except when air travel is required. In this situation, a minimum of seven (7) days advance notification is required
@EngrAbdullah2252
@EngrAbdullah2252 5 ай бұрын
excellent sir.g .i need it please share with me .i will will be very thankful sir
@2iconstructions918
@2iconstructions918 5 ай бұрын
@@EngrAbdullah2252 what do you need?
@RizwanShaikh-by1rw
@RizwanShaikh-by1rw 6 ай бұрын
after filling the rfi excel format from. where we have to submit rfi form whether its a separate app are there or through WhatsApp we have to submit rfi form for both aramco and non Aramco project?
@2iconstructions918
@2iconstructions918 6 ай бұрын
I hope it's clear now.
@RizwanShaikh-by1rw
@RizwanShaikh-by1rw 6 ай бұрын
after filling the rfi excel format from. where we have to submit rfi form whether its a separate app are there or through WhatsApp we have to submit rfi form for both aramco and non Aramco project?
@2iconstructions918
@2iconstructions918 6 ай бұрын
Already responded
Aramco RFIs, INCRs & Calibration LOGs #aramco
6:27
2i Constructions
Рет қаралды 901
RFI, Raising/Closing & its Descriptions #aramco
13:22
2i Constructions
Рет қаралды 8 М.
Tuna 🍣 ​⁠@patrickzeinali ​⁠@ChefRush
00:48
albert_cancook
Рет қаралды 148 МЛН
Don’t Choose The Wrong Box 😱
00:41
Topper Guild
Рет қаралды 62 МЛН
Construction RFIs - How to write and answer them
14:45
The Girl in the Hard Hat - Well Works
Рет қаралды 20 М.
Levels Of Documents In Aramco Projects. @aramco
11:21
2i Constructions
Рет қаралды 3,8 М.
Tuna 🍣 ​⁠@patrickzeinali ​⁠@ChefRush
00:48
albert_cancook
Рет қаралды 148 МЛН