Following Craig Flat Road along Clutha River, from Beaumont Bridge to Millers Flat, on Saturday, 3 June 2023.
Пікірлер: 1
@waynesmith228710 ай бұрын
I never knew this road went all the way through. I'll be down south in March 2024 so I think I will cruise through here to Miller Flat. Finally a new bridge at Beaumont.