Рет қаралды 860
Renovation and preservation of the monumental building with its intricate arched facade and simultaneous construction of a multifunctional tower, adapted to the difficult site conditions in the centre of Rotterdam.
Doka provided storage at the self-climbing platform, used a hybrid system (Platform SCP inside and SKE50+ outside), installed Protection Screen Xclimb 60 around the building, used Dokadek panel formwork for the floors and used Xlight columns for pouring floors and columns. Ringlock scaffolding was used for different floor heights.