Sleeping Sleeping 😴 what a sound engineer good job bro
@arailfanslogbydevansh Жыл бұрын
ICF Track Sounds are love! LHB can never match this.
@fwix110 ай бұрын
then your amateur
@srivatsaiyer97136 ай бұрын
@@fwix1 Agreed. Even LHB Sounds are unique and good in their own way but ICF wins over LHB
@harishpatidarArdentRailFan7 күн бұрын
Can you teach me bro how you recorded I have tried everything, never matching such quality sound. Awesome❤
@pritam436 Жыл бұрын
This is Just Awesome
@siddheshnargolkar11 ай бұрын
Same music till after भटकळ to Mangalore.😅😅
@pritam436 Жыл бұрын
My favourite track Sounds ❣️
@nirmalk3423 Жыл бұрын
Super ❤️
@vishnudattajackeRF Жыл бұрын
🤗
@ravireddy3259 Жыл бұрын
Nice. After long time. Please do update on Guntakal -Maddikera doubling. Also from Guntakal - Nancherla side.
@vishnudattajackeRF Жыл бұрын
scr construction organization- guntakal division- final location surveys for proposed byepass line at guntakal connecting bellari-nancherla (21 km), for proposed new line with rail over rail between guntakal west and mallappa gate stations (12.00 km) & for proposed byepass line between guntakal end and nandyal end at yerraguntla (5.50 km) (total project length 38.50 km) - fixing of alignment, pegging out centre line, taking levels, finalization of land requirement (survey number wise), soil investigations, geological investigations for bridges by drilling bore holes, collecting samples, calculation of water-way requirement for all the proposed bridges and preparation of gad's for bridges, station yards, project sheets and preparation of detailed estimate etc
@ravireddy3259 Жыл бұрын
Earth work and bridge works are in progress in Mallappa gate Guntakal by pass line. One end will join after the Hundri Neeva canal in between GTL jn - Nancherla. This needs to be covered. West Guntakal- MLGT by-pass with ROR might happen after 5 years.