Рет қаралды 23,532
Removing an old driveway and cutting area for larger new driveway. I hauled out 2 loads of concrete and dirt and leveled the area out for the owner to come and pour the new driveway. The job took about 3.5 hours to complete. Thanks for watching! #EliteEarthworks #Takeuchi #TakeuchiTB153fr