Renovation of runway 10/28

  Рет қаралды 10,156

Flughafen Zürich

Flughafen Zürich

Күн бұрын

As concessionaire, Flughafen Zürich AG is obliged to ensure orderly and safe operations, provide the necessary infrastructure for this purpose and carry out appropriate maintenance work. The work to repave the centerline of runway 10/28 will be split into around 70 to 80 night shifts. The original concrete runway will be replaced by pavement consisting of three layers of asphalt, which will be delivered during the preceding day. A special low-temperature, rapid-curing asphalt will be used so the runway is ready for use again as soon as flights resume in the morning.

Пікірлер
The Simple Secret of Runway Digits
17:38
CGP Grey
Рет қаралды 10 МЛН
The Unbelievable Logistics of Fixing an Airport Runway
11:27
The B1M
Рет қаралды 733 М.
버블티로 부자 구별하는법4
00:11
진영민yeongmin
Рет қаралды 21 МЛН
ДЕНЬ УЧИТЕЛЯ В ШКОЛЕ
01:00
SIDELNIKOVVV
Рет қаралды 4,2 МЛН
Миллионер | 2 - серия
16:04
Million Show
Рет қаралды 1,5 МЛН
Sanierung Piste 10/28 am Flughafen Zürich
8:41
Flughafen Zürich
Рет қаралды 3,9 М.
ONE DAY Asphalt Repair! | Resurface Asphalt Yourself Including Cracks
9:35
TSAIA - Airfield Lighting Safety Program
42:57
AlaskaDOTPF
Рет қаралды 21 М.
Sanierung Piste 10/28 Flughafen Zürich
8:13
Flughafen Zürich
Рет қаралды 20 М.
Why Buildings Need Foundations
14:51
Practical Engineering
Рет қаралды 3,5 МЛН
Asphalt Paving Operation Training Video - Positions and Equipment
12:54
Asphalt Testing Solutions & Engineering
Рет қаралды 182 М.
airport lighting - you must know [atc for you]
6:53
ATC FOR YOU
Рет қаралды 1,4 МЛН
Replacing Airport Concrete OVERNIGHT
7:29
Aaron Witt
Рет қаралды 160 М.