Rhythm RR (Front cam spring break 2024)

  Рет қаралды 2,747

Rhythm Railroad

Rhythm Railroad

Күн бұрын

Пікірлер: 17
@BaltimoreOhioToledoSecondSub
@BaltimoreOhioToledoSecondSub 8 ай бұрын
Each time I log onto KZbin subscribed, the first image of this video just blows me away. The grass, rail color, the photographer... Super. Could be the cover shot on a model railroad magazine.
@rhythmrailroad1101
@rhythmrailroad1101 8 ай бұрын
Thanks very much Wil. I appreciate the kind words. 😊
@Lakeside1943
@Lakeside1943 8 ай бұрын
Huge multilevel layout with smooth, perfect trackwork and gentle curves ! Realistic speed makes the (long) ride enjoyable. You still got a few hours of scenery to complete. Great operational possibilities too.
@rhythmrailroad1101
@rhythmrailroad1101 8 ай бұрын
Thanks for checking it out! 🙏😊
@FGLKPaul
@FGLKPaul 8 ай бұрын
Man... I've watched a few of your videos before. But I did not realize the overall size of your layout until watching this. Insane!
@rhythmrailroad1101
@rhythmrailroad1101 8 ай бұрын
Thanks for that. This modified track plan makes it feel even larger. I’m really enjoying it
@ronaldrondeau7870
@ronaldrondeau7870 8 ай бұрын
Thanks for the ride, hope to see new job done
@MLWQC
@MLWQC 8 ай бұрын
Very impressive and fun
@rhythmrailroad1101
@rhythmrailroad1101 8 ай бұрын
Thanks! Having a blast 😊
@BaltimoreOhioToledoSecondSub
@BaltimoreOhioToledoSecondSub 8 ай бұрын
Looking good! Leaving staging just after the arrow pointing to the Amtrack jct at 1:15 and next at1:23 there are two sets of red leds hanging from above? Is this something you are working on for the future or? Curious as I am trying to follow your signalling work. Also seems like you have put up more backgrounds and plexiglass since your last update.
@rhythmrailroad1101
@rhythmrailroad1101 8 ай бұрын
Thanks Wil! The signals hanging from above are placed there simply because that area is only visible through a camera so I had to make it obvious for the operator to see on the camera screen. In fact, I had to make any kind of proceed aspect some kind of flashing yellow because it’s almost impossible to differentiate between red, yellow and green on my cameras, especially from far away. The additional plexiglass is to either protect some of the new signals or and industry placed in a location where people may be reaching into the layout and accidentally bump into some delicate tank cars for example. I also started to add plexiglass on the spline sections that don’t have anything around them.
@oneastrails
@oneastrails 8 ай бұрын
Pretty darn impressive, is this a club or home layout?
@rhythmrailroad1101
@rhythmrailroad1101 8 ай бұрын
Thanks! I appreciate it. It’s just in my basement
@canadianlocomotivelogistics
@canadianlocomotivelogistics 7 ай бұрын
What DCC system do you use?
@rhythmrailroad1101
@rhythmrailroad1101 7 ай бұрын
Digitrax
@canadianlocomotivelogistics
@canadianlocomotivelogistics 7 ай бұрын
You have jmri?
@rhythmrailroad1101
@rhythmrailroad1101 7 ай бұрын
Yeap. I use a combination of Panel Pro and CATS.
Rhythm RR (Update #41)
1:06:30
Rhythm Railroad
Рет қаралды 1,7 М.
Rhythm RR (FRONT CAM December 2023) Happy New Year!  In 4K
47:22
Rhythm Railroad
Рет қаралды 877
요즘유행 찍는법
0:34
오마이비키 OMV
Рет қаралды 12 МЛН
O scale on 3 peninsulas
6:58
modelrailscenes
Рет қаралды 731
Rhythm RR (yard lead project) Part 5
28:46
Rhythm Railroad
Рет қаралды 2 М.
Cab Ride, 2024
6:13
Trains and Trucks by Fred
Рет қаралды 91
Rhythm RR (yard lead project) Part 1
11:08
Rhythm Railroad
Рет қаралды 1,3 М.
Flat Car CAM Ride.  Amarillo,Texas RR Museum
11:39
Spanky Fuentes
Рет қаралды 259
2024 MD & BD RR Christmas Cab Ride
8:30
Bruce Blackwood
Рет қаралды 102
Rhythm RR (Yard lead project) Part 9 (final)
7:43
Rhythm Railroad
Рет қаралды 803
Rhythm RR (almost invisible bracing)
8:58
Rhythm Railroad
Рет қаралды 926
Rhythm RR (yard lead project) part 7
26:53
Rhythm Railroad
Рет қаралды 1,5 М.
요즘유행 찍는법
0:34
오마이비키 OMV
Рет қаралды 12 МЛН