Рет қаралды 2,682
A narrated run over almost all of the mainline track at Ridge Live Steamers as of January 2017. Prior to each section, you'll see a track chart with the area to be viewed marked out on the chart. The segments are continuous, as we moved out and back on the track, and at the end we even navigate one of the Wyes to get the train in proper direction to be stored into the barn. You can see the current (Jan 2017) construction of the M barn (complete except for the doors) and the N barn (currently only a poured concrete slab)
Learn more about Ridge at www.ridgelivesteamers.org
Special thanks to Engineer Rich Clemons and U-Man Caboose Mikey