An amazing view of the RTS Link Bridge connecting from Johor Bahru to Woodlands, Singapore! Bravo Admin!
@NES2922 ай бұрын
Plus, the music at the 4th minute perfectly suits the progress. Not just the progress, but also reflects the how lively JB is.
@9aredmi8462 ай бұрын
Mantap...makin cepat progress nya ..Maju JOHOR ❤️💙🙂
@muhdfauwazel-emin21322 ай бұрын
pembinaan LRT bakal menyenangkan pada rakyat kita yg bekerja di Singapore. Yg bestnye lak, LRT ini bergabung sekali dengan Terminal Johor Bahru. Rasanya Menteri Besar Johor patut buat penambahan parkir kenderaan dan motorsikal. Sedia ada belum tentu dapat tampung jumlah bila LRT ini siap sepenuhnya. Pembinaan LRT juga janakan perniagaan parkir kenderaan kepada yang berminat jerlah.
@benjerry39822 ай бұрын
Thanks again for the update! brilliant!!!
@alifalimazlan1812 ай бұрын
Upgrade sekali kawasan sekitar supaya lebih mesra pejalan kaki.
@rinnakahara36532 ай бұрын
Majulah negaraku Malaysia
@ericlai32212 ай бұрын
thanks again for the update
@SzlibgeSzli2 ай бұрын
Terbaik Jb 🎉🎉🎉
@drstephanietan79402 ай бұрын
Very well made video. I always look forward to your videos!
@akif.zainal2 ай бұрын
Hope SCM dapat cover development data centre Johor. Sedenak, Kulai, Iskandar Puteri etc
@mdcpq962 ай бұрын
Laju betul progress
@stephenheath5065Ай бұрын
Congratulations to all the main contractors, specialist sub-contractors, engineers and the MRT. Amazing quality and scintillating progress shown by IJM, Gadang, Sunway and CCCC. 🙌
@alinasimon63992 ай бұрын
Syukur alhamdulillah. Segala puji-pujian buat Allah yang memberkati Malaysia bumi bertuah.
@phuakiangee862622 күн бұрын
Great!! Rail tracks installation has started finally.
@captelor92602 ай бұрын
RTS link akan lebih efficient bila ada lrt line sekitar bandar2 JB. Orng yg kerja singapore, akan tinggalkan motor kereta untk masuk singapore, orng singapore tinggalkan kereta untk shopping hari minggu sekitar bandar JB
@cooperham40392 ай бұрын
So excited for this new development 😊
@amirism912 ай бұрын
harap ada lah lampu led dkt jambatan rts baru lawa malam2. satu tarikan pelancongan
@mashilmi232 ай бұрын
Serabut tgok kawasan pembinaan dan tatakelola disitu. Mudah2an nnti akan diperkemaskan dan JB penuh dengan high rise
@mohdsaufi12602 ай бұрын
lepas ni tak payah lah amik bas CW1.,pergi stesen kranji..Siap ni Terus sampai stesen woodland. dah siap nanti pakai biometrik lah ye. tak payah nak beratur2. buka 10 kaunter
@nazreenismail7822 ай бұрын
Blh dh buat laluan LRT or MRT dr JB ke Pasir Gudang/Tebrau..stress weh hari² hadap jem dr Perling hala ke Pasir Gudang 😢
@bennyho59722 ай бұрын
wow huge progress 👍❤
@nurmuhammadbinabdullah2 ай бұрын
Cantik RTS dan bolehkah RTS diperkenalakn ke seluruh Johore Baru dan seluruh Johor untuk elakn kesesakan lalulintas..seperti MRT/LRT.......adam..a.s
@迷迷鼠2 ай бұрын
Wow the track is very high.
@ieatburgeh2 ай бұрын
Yes.
@shasanmaz2 ай бұрын
the depot is too small for the parking of trains. Thus I think I will be like Bukit Panjang LRT depot which is similarly small. I saw many trains parked at the various stations along the way during off peak hours. Truly amazing aerial video using dji drone on 4k resolution. Vibrant JB
@cadinvent2 ай бұрын
The columns for the curved section near R&F Phase 3 could have been better placed in the middle of the road to minimise land encroachment into the school perimeter land. Same for curved section near R&F Phase 1.
@jb_chan71702 ай бұрын
1.KL 2.selangor 3.JB
@pherdauzjivrailishmael70782 ай бұрын
Penang
@shahrmillan21322 ай бұрын
1.KL 2.Selangor 3.Penang 4.Johor 5.Sarawak
@jb_chan71702 ай бұрын
@@shahrmillan2132 kau tanya aku buat ape😂😂kau tnye SCM sane...fakta JB KL 2.0😂🤭
@shahrmillan21322 ай бұрын
@@jb_chan7170 I rasa u tak pernah mai penang... U mai sendiri tgk mana lebih maju
@nigellanjuat32942 ай бұрын
What about SABAH north Borneo 😅😅😅
@MohdSyafiqSyafiq-oy2tv2 ай бұрын
❤❤❤❤❤
@psoon042862 ай бұрын
Any update on the official opening date? I’m hoping to do a trip to Singapore in April-June period next year and would love very much to ride this link across to Malaysia. Cheers from BC🇨🇦😄
@nick_15512 ай бұрын
Tentatively January 2027 to start operations.
@psoon042862 ай бұрын
@@nick_1551 Thank you. Looks like there’s still a lot more to be done
@InteltalАй бұрын
Just wondering why there is no elevated bridge so that ship can cross underneath it and sea water can flow freely.
@yusufzakaria35812 ай бұрын
Bila siap?
@nick_15512 ай бұрын
Dec 2026. Operasi Jan 2027
@amirism912 ай бұрын
design mcm MRT Putrajaya
@AIMBLOXKIN2 ай бұрын
What’s the music scm?
@thomaskiang37512 ай бұрын
Only RTS train project is join project Singapore /JB No HSR project ??
@nigellanjuat32942 ай бұрын
🇲🇾👍🕊️❤
@mokasha189220 күн бұрын
Free the Tebrau Strait from all dams
@Edyjeddy922 ай бұрын
Min belanja pnb118 pulak
@Copix2480Ай бұрын
Dengan kelajuan 110kmj mengenangkan jpj😅
@AIMBLOXKIN2 ай бұрын
Hi
@LukeLuke-x4b2 ай бұрын
Lisandro Trail
@faizrazakkk49082 ай бұрын
Bukan smpi KL ke ?
@bennyho59722 ай бұрын
itu kereta api laju ini RTS
@mohdsaufi12602 ай бұрын
yang tu EDTP gemas - Johor Bahru (ETS).Jangka Operasi Bulan Mei 2025
@wgm68112 ай бұрын
It'll great if this project can extend to Kuala Lumpur or all the way to the north (Penang, Alor Setar etc.)
@nick_15512 ай бұрын
KTMB is already doing that with their upcoming ETS. There's no need for a parallel. And the RTS is an LRT, not an Intercity rail.
@kennySg1012 ай бұрын
Thanks for the update. But not really Mega project!
@KaiserNail-ur7mj2 ай бұрын
RM10 billion is mega for Malaysia albeit 61% of the cost is funded by Singapore.
@lubisbatakrabit70932 ай бұрын
Oh Dari jb ke sg kluar kt woodlands ingat terus kluar ke sembawang