Safety work at visitor mine with the WIWA INJECT 2K 230

  Рет қаралды 423

WIWA Wilhelm Wagner GmbH & Co. KG

WIWA Wilhelm Wagner GmbH & Co. KG

Күн бұрын

Um im Besucherbergwerk Finstergrund mit unserer WIWA INJECT 2K 230 einen Hohlraum von 180 m3 mit Schaum zu füllen, wurden insgesamt beträchtliche 7,6 Tonnen an Material benötigt. Dabei handelte es sich um Mine Fill LF von DSI, einen Phenol-Schaum im Mischungsverhältnis 4:1 und mit einem Expansionsfaktor von 75. Praktischerweise konnten wir im Rahmen dieser Aktion zudem eine neues Injektionsgerät testen, das bald erhältlich sein wird.
Vielen Dank an alle Beteiligten!
---
In order to fill a cavity of 180 m3 with foam in the Finstergrund visitor mine using our WIWA INJECT 2K 230, a considerable total of 7.6 tons of material was required (Mine Fill LF from DSI, a phenolic foam in a mixing ratio of 4:1 and with an expansion factor of 75). Conveniently, we were also able to test a new injection device during this action, which will soon be available.
Many thanks to all involved!

Пікірлер
Basement waterproofing with the WIWA INJECT 2K 14025
2:04
WIWA Wilhelm Wagner GmbH & Co. KG
Рет қаралды 1,2 М.
Polyurethane Grouting (Chemical Grouting)
2:28
HeliconUSA
Рет қаралды 3 М.
Je peux le faire
00:13
Daniil le Russe
Рет қаралды 9 МЛН
SCHOOLBOY. Мама флексит 🫣👩🏻
00:41
⚡️КАН АНДРЕЙ⚡️
Рет қаралды 6 МЛН
Presentasjons video Gruva
5:00
Kristoffer Øyborg Stallemo
Рет қаралды 61
Water Damage Repair In The Basement With The WIWA INJECT HD 2 & the WIWA INJECT GUN
1:08
WIWA Wilhelm Wagner GmbH & Co. KG
Рет қаралды 156
Amazing Process of Making Wooden Hotpot | Creative Woodworking Idea
18:24
Risky Way They Transport Logs on Brakeless Wooden Cart
20:16
Should I Buy a Second Home?
7:41
Ramsey Everyday Millionaires
Рет қаралды 106 М.
Negative Waterproofing / Grouting of the Wall and Sole Area with the WIWA INJECT ND 1
1:25
WIWA Wilhelm Wagner GmbH & Co. KG
Рет қаралды 389
Spray Painting Work #8981525752/8240100052
4:38
GIRI ENTERPRISE
Рет қаралды 930