Ever wondered how railroads install new ties? THIS is how its done, and with the use of an entire track gang! We'll get a neat, up close view, of the entire process, while seeing these cool machines hard at work!
Watching new ties get replaced is a neat process. It requires an entire traveling track gang, with an entire crew! In this video, we'll see spike pullers, scrappers, tie inserters, tie pullers, track brooms, ballast regulators, and so much more hard at work! With the use of this cool, heavy equipment, the skilled crews on this track gang make things look easy! Watching this entire process unfold along the railroad tracks was neat!
Instagram: / sd457500
/ sd457500
/ sd457500
#train #diesel #railway
Any use of this content without expressed, clear permission is prohibited. For usage, licensing, and other usage, contact me on Instagram at SD457500.
Copyright 2024 Douglas Hildebrandt, all rights reserved.

Пікірлер: 39
@richardcarlson582
@richardcarlson582 3 күн бұрын
I've seen several tie replacement videos and this one is by far the most coherent explanation of how it's done. And that crew were really moving along. Thanks!
@daveschmitt4499
@daveschmitt4499 3 күн бұрын
@richardcarlson582 . When I worked these 20 years or so ago, we could install around 8000 to 10000 ties a day. This only happens when there are many ties in each mile of track. The more spread out the replacement ties happen to be, the less production you would experience. Walking 15 to 20 miles a day wasn't unheard of with limited tie replacement. Oh and that was when I worked on the wood tie gangs. Concrete tie gangs were so much different. New tracks were laid with a huge machine laying on tie at a time under it, while riding on caterpillar type tracks on the front of the machine and the rear ran on the rail that was being forced onto the ties after they were placed on the ground. The huge machine pulled many flat cars filled with concrete ties.
@TonyTruth-s9z
@TonyTruth-s9z 3 күн бұрын
Best video of the day. I've seen this locally recently.
@SD457500
@SD457500 3 күн бұрын
Great to hear! Locally as in the Twin Cities? This same track gang is slowly working east; its so cool to see.
@TonyTruth-s9z
@TonyTruth-s9z 3 күн бұрын
@@SD457500 St. Cloud. The gang has been working on a spur that runs into the western industrial park where the old repair yard and roundhouse once resided.
@StormySkyRailProductions
@StormySkyRailProductions 3 күн бұрын
Awesome part two tie replacement video. Took me back to my railroad days back on the CP. Enjoyed watching once again and have a wonderful rest of your Tuesday. Steve
@TomahTrains-s5b
@TomahTrains-s5b 3 күн бұрын
Great video! Thanks for sharing!
@SD457500
@SD457500 3 күн бұрын
Thanks for watching, and great to hear that you enjoyed the video!
@BattleshipOrion
@BattleshipOrion 3 күн бұрын
Those tie inserters have so much force, that when the track crew I mentioned some time ago came through, they broke 3 ties in a 150ft span...3 NEW ties....also, as mentioned in my last comment when I came by to read comments, something else kinda maintenance related is that my town is not known for railroad history...CSX kinda changed that, as they donated a 40ft steel sided boxcar ACL 20767 to the Fort Wayne Railroad Historical society...yes, the same people with the NKP 765, and 358. The boxcar was used as a tool car and storage in town for the last 39 years as part of the railroad's maintenance of way department. It sat on a 500ft stretch of abandoned track, the respective switch was taken out after a derailment in the late 70's, early 80's...sometime between then because in what lil' footage of that derailment exists, C40-8w's are used.
@lexpo181
@lexpo181 3 күн бұрын
so cool to see those MOW machineries! Excellent video Douglas! ;)
@lfeco
@lfeco 3 күн бұрын
Enjoyed that. Doing this the old way would have been a hard job.
@SD457500
@SD457500 3 күн бұрын
Doing this the old way would have been a TASK! Thanks for watching!
@daveschmitt4499
@daveschmitt4499 3 күн бұрын
@lfeco . Trust me. When I first started at a laborer years ago, we worked on a section crew with other section crews helping. We were required to uninstall and completely install 10 ties per man per day. Absolutely, everything was done by hand. The only thing that we did use that would be considered mechanical was track jacks that you carried from location to location, hand jacked to raise the rails. Everything else was manual labor, including spiking
@Seaboardsystem-t7e
@Seaboardsystem-t7e 3 күн бұрын
BNSF seriously needs to do tie replacement on the Hinckley subdivision. Some of the ties on that line are up to 20 years old and railfaning there every day i’ve seen those ties start to show their age for a while now
@marksamuel130
@marksamuel130 2 күн бұрын
So ancient compared to European systems
@RFMCabooseNP1713
@RFMCabooseNP1713 3 күн бұрын
Cool
@docugraf
@docugraf Күн бұрын
On Europe's tracks all the steps are done within one machine
@erict5234
@erict5234 3 күн бұрын
Every time we have a tie gang scheduled for our area, the same routine happens every time... 1st ballast train comes and dumps new rock, then the regulator clears it, tie gang does their jobs and finally a tamper and regulator finishes the job. (I have never not seen the regulator run ahead of the gang.)
@daveschmitt4499
@daveschmitt4499 3 күн бұрын
@erict5234 . Must dump rock first because most times a lot of rock either isn't on the track to begin with or the surfacing gang behind the tie gang wouldn't have enough to smooth the track and stabilize it.
@erict5234
@erict5234 3 күн бұрын
@@daveschmitt4499 correct.
@TrainWork
@TrainWork 3 күн бұрын
Good Stuff👍😁OperateOnOperator
@SD457500
@SD457500 3 күн бұрын
Glad you enjoyed the video; this was a neat and cool operation to see.
@BruceBergman
@BruceBergman Күн бұрын
Do they have this equipment in 36" narrow Gauge? asking for Disneyland and Knott's and Cedar Fair 7:43 😊
@richardbause2453
@richardbause2453 3 күн бұрын
You skipped the part on how the plates are reinstalled under the rail using the rail lifter . This has to happen "before" spiking can begin. 😮
@SD457500
@SD457500 3 күн бұрын
Whoooops, I appear to have missed one of the machines. You can see the plates being placed with the track broom though. Hope you enjoyed the video, and thanks for watching!
@richardbause2453
@richardbause2453 2 күн бұрын
@@SD457500 The guys walking along pickup the plates and set on end of the ties, the rail lifter follows behind them. Those guys lift up the rails and slide the plates under, then comes the spikers.
@Bob.W.
@Bob.W. 4 күн бұрын
Thx. What CPKC Subdivision?
@SD457500
@SD457500 3 күн бұрын
This is on the Withrow Sub, over in NE Mpls. Thanks for watching!
@Bob.W.
@Bob.W. 3 күн бұрын
@SD457500 Thx. Not familiar with that Sub.
@SD457500
@SD457500 3 күн бұрын
Think of Shoreham Hill; that area.
@daveschmitt4499
@daveschmitt4499 3 күн бұрын
@@SD457500. When were they in that area and which direction were they headed
@SD457500
@SD457500 3 күн бұрын
@@daveschmitt4499 This was last week, and they were heading east. I *think* they are still heading east towards Withrow or down towards Soo Jct.
@kkoch666
@kkoch666 3 күн бұрын
I bet those machines break all the time. Looks like a lot of maintenance.
@Memphisdoug
@Memphisdoug 3 күн бұрын
What happens if the new tie is too low to the rail?
@daveschmitt4499
@daveschmitt4499 3 күн бұрын
@Memphisdoug . After the new tie is installed, another machine installs the metal plates between the rails and the ties on both ends, then the tamper comes and tamps the ties tight to the rail. Then the spikers come and spike the rail to the tie.
@abecoulter8550
@abecoulter8550 2 күн бұрын
why not concrete sleepers
@daveschmitt4499
@daveschmitt4499 4 күн бұрын
It's called a Tie Gang
@SD457500
@SD457500 3 күн бұрын
Appreciate the feedback on the video; I hope you enjoyed it otherwise!
@daveschmitt4499
@daveschmitt4499 3 күн бұрын
@SD457500 . There was a missing machine. A machine would typically raise the rail so someone or a couple of maintenance of way employees could slide the plates under the rail on each end of the new tie. Back in my day we first used track jacks or pry bars. Then came machines that clamped both rails, a piston jack would raise the rails by pushing down on the ground, then there was a stick like attachment with prongs on the bottom of the stick to place in the spike holes on the outside of the rail to slide the plate under the rail. Then the pistons were released, the clamps unclamped and the machine was either pushed forward to button control, powered forward. And NATURALLY the piece of equipment i showed someone several weeks ago, I can't find now, lol.
How A Railroad Replaces Ties: Part One - Dropping New Ties
5:30
Nooo! Not The New Truck! - HARVEST BREAKDOWN
23:14
Welker Farms
Рет қаралды 115 М.
Men Vs Women Survive The Wilderness For $500,000
31:48
MrBeast
Рет қаралды 101 МЛН
Angry Sigma Dog 🤣🤣 Aayush #momson #memes #funny #comedy
00:16
ASquare Crew
Рет қаралды 51 МЛН
TRRS 504: Railcar Wheel Replacement
20:05
Thornapple River Rail Series
Рет қаралды 9 МЛН
BNSF Mountain Subdivision (G Scale) Coal Operations - Overview
47:45
The Entire History of Caterpillar Inc.
20:16
Heavymatic
Рет қаралды 144 М.
CN train track replacement
12:34
CN RAILROAD
Рет қаралды 675
Building My YouTube Work Shop
31:01
Dumpster Dave
Рет қаралды 11 М.
First Train in YEARS on the Nashville & Eastern Railroad
1:33:11
Delay In Block® Productions
Рет қаралды 27 М.
Ballast Train in Action! -Dumping Rock with Herzog GPS -
5:38
TRRS 547: Railroad Rail Replacement
26:19
Thornapple River Rail Series
Рет қаралды 2 МЛН
V&O Short Version
26:53
Daniel Hadley
Рет қаралды 4,9 М.
Men Vs Women Survive The Wilderness For $500,000
31:48
MrBeast
Рет қаралды 101 МЛН