Рет қаралды 552
Measurand engineers travelled to the largest tailings facility in Europe while Measurand distributor, Budokop Sp. z o.o., installed a 156-metre SAAV model ShapeArray to monitor deformation. The tailings facility at Zelazny Most, Poland stores copper tailings in a confining embankment dam ‘ring dam’ that measures approximately 14.3 km in length.
Read more: www.measurand.com/blog