Slab Casting से पहले ये Steel ज़रूर Check करले | Site Engineer Basic Knowledge | Slab Checklist

  Рет қаралды 156,225

Civil Engineers Training Institute

Civil Engineers Training Institute

2 жыл бұрын

#civilGuruji #civilengineerstraininginstitute #Training #Institute #Civil_Engineer #Slab #Checklist #Casting #Steel
Slab Casting से पहले ये Steel ज़रूर Check करले | Site Engineer Basic Knowledge | Slab Checklist
Start Your TRAINING NOW
Join this Training and get started :- civilguruji.com/s/store/cours...
For More Details Call Now : 9111001234
About This Video ------------------------------------------------------------------------------------
In this video Er. Akash Bohar, Corporate Trainer of Civil Guruji explaining about Slab Casting से पहले ये Steel ज़रूर Check करले | Site Engineer Basic Knowledge | Slab Checklist
A Reinforced concrete slab is horizontal members made of concrete which is used to resist the flexural bending stress when it is subjected to loads. Generally, the minimum thickness of the slab is 4 inches and the maximum thickness depends upon the span and loads acts on the slab. For Normal residential Building, 5 inches thickness is generally recommended. As we know that checking of slab reinforcement is very important. It is because the wrong layout of reinforcement on site creates a great loss for the client, so the first duties of a civil engineer to read the complete drawing of beam and Slab. The followings are a checklist of a concrete slab that needs to be carried before casting. Slab Casting से पहले ये Steel ज़रूर Check करले | Site Engineer Basic Knowledge | Slab Checklist
Slab Casting से पहले ये Steel ज़रूर Check करले | Site Engineer Basic Knowledge | Slab Checklist
Check the diameter of Main Bars and Distribution along with Shorter Span as per approved drawings. Check the diameter of Main Bars and Distribution along with Longer Span as per approved drawings. pacing between Main Bar and Distribution along the Shorter span and longer span of slab as per approved drawings. Check the depth of the cover block as per structural drawings. Ensure that spacing between the cover block shall be at 1 m spacing. The depth or thickness of the slab should be checked.
A proper layout of chair Bars shall be provided for a slab.
Check the dowel bars, if provided for future extensions.
Make sure that the Main reinforcement of slab( both long span and short span) shall be passed through the beam in order to transfer loads of slab. Ensure that the reinforcement bar that is lapped should be located in a low-stress zone.
Proper lap length shall be checked for Main Bars. Check diameter and Spacing of Extra Reinforcement in Slab.
Check the dimension of the formwork of each slab panel.
The level and diagonal of each slab panel shall be checked.
Check the thickness of the slab.
Ensure the formworks shall provide all-round the slab edges, openings, etc.
Ensure the Support props of Slab should be in proper alignment and also check the plumb.
Vertical props or support of each slab panel shall be checked.
Make sure all the gaps in the formworks shall be properly sealed in order to prevent slurry leakage.

Пікірлер: 132
@maheshnayak1512
@maheshnayak1512 2 жыл бұрын
Wow sir U r the best Er in the world koi Aap se sikhe Explain karna❤️❤️
@pra20011983
@pra20011983
अगर क्रैंक बार लगा रहे हैं क्या तब भी चेयर बार देना चाहिए ??
@sandeeppatta7869
@sandeeppatta7869
1m main number of bar 11
@mdbelal37db64
@mdbelal37db64 Жыл бұрын
1000÷100 = 10num of bars
@MrPrafulyadav
@MrPrafulyadav
10 bars in 1 mtr..
@avneetpatel5175
@avneetpatel5175 Күн бұрын
What about the binders spacing in extra bars ?
@MdFaizan-pe5hn
@MdFaizan-pe5hn 2 жыл бұрын
No. Of bars is 11 for every 1m. having 100 c/c
@dheerendrashukla7551
@dheerendrashukla7551 Жыл бұрын
No. Of bar = total length of bar/spacing +1
@sunilkumargupta1984
@sunilkumargupta1984 2 жыл бұрын
Sir off-line coaching kab se start hogi
@omprakashmahawar5883
@omprakashmahawar5883 2 жыл бұрын
1 m me 11 nos of bar aayenge
@subhankardutta6928
@subhankardutta6928 2 жыл бұрын
What an explanation!! Thank you
@praisethelord1828
@praisethelord1828 2 жыл бұрын
Dear sir
@jaysk.2862
@jaysk.2862 2 жыл бұрын
Thank you Gurooji
@SARTHAKGANJARE
@SARTHAKGANJARE 2 жыл бұрын
THANK YOU SIR
@dilsediltak6879
@dilsediltak6879 Жыл бұрын
Very nice thank you So much sir
@kemitikahibitumaku
@kemitikahibitumaku
Thank you sir guruji 🙏
@civilcknowledge6204
@civilcknowledge6204 Жыл бұрын
1000/100+1=11
@syedhassan4570
@syedhassan4570 2 жыл бұрын
Thanks ☺️👍
@manjumagar6540
@manjumagar6540 Жыл бұрын
Thank you vai🙏🙏
@ziauddin7948
@ziauddin7948 Жыл бұрын
good slab crank bar length at discontinued beam edge & at continued beam including length of crank bar as top bar after entering on adjacent slab #👍👍
Slab Checklist Before Concrete Casting | How To Check Slab Reinforcement in Site | Slab Checklist
18:56
SLAB Reinforcement Details, लोहा कैसे लगाते है. Must Watch #civilguruji
24:48
Looks realistic #tiktok
00:22
Анастасия Тарасова
Рет қаралды 100 МЛН
Nutella bro sis family Challenge 😋
00:31
Mr. Clabik
Рет қаралды 13 МЛН
50 YouTubers Fight For $1,000,000
41:27
MrBeast
Рет қаралды 126 МЛН
How to Check Level of Slab Shuttering By AutoLevel | Slab And Beam Shuttering Level | By CivilGuruji
13:13
Two Way Slab Reinforcement
9:08
AK Skills & Solutions
Рет қаралды 859 М.
Learn Basic Different Between One Way Slab | Two Way Slab | Sunken Slab | Site Visit Basic Knowledge
14:37