Slope inclinometers/indicators are used to determine the magnitude, rate, direction, depth, and type of landslide movement. This video presents the installation of Inclinometer pipes to monitor ground movement.
Пікірлер: 13
@Jake-ti9sp Жыл бұрын
You should have tremie pipe to the bottom of the borehole to ensure grout goes in from the bottom up.
@user-fv4uq6js7x4 жыл бұрын
What the filling do you use , only cement?
@touatitsamir36442 жыл бұрын
we know that the composition of the grout depends on the nature of the soil, therefore, which composition to choose in the case of a superposition of a hard layer with a plastic layer. thank you
@hbenjame12316 жыл бұрын
omg when that cement truck pulled up I started dying of laughter.... WTF is a cement truck doing at an instrumentation installation...Best of luck
@stuartbaker31077 жыл бұрын
Did you not put any tape around the coupler joints? How will you be sure that the cement does not enter the inclinometer casing and block it up or obstruct the keyways? Also - are using a concrete mix for back filling the borehole? No bentonite? If you back fill the annulus of the borehole with concrete all you'll end up with is a reinforced column of concrete with a plastic pipe in the middle.... And where is the slope? I don't see it in the video? It looks like your drilling and installing on level ground.....
@jamesvignali60746 жыл бұрын
That is what the "O" rings on the male thread is for.
@afauty27 ай бұрын
Usually people do this test in new slope constrcution..so why you are doing that on level ground i dont understand the purpose..
@kappanistei7 жыл бұрын
Why did you use ciment?
@alinasir13272 жыл бұрын
To confine the pipes and hence move the lateral pressure to the inclometer rode and measure the angle of inclination
@lilnick16512 жыл бұрын
I do this test tommorow morning
@zcsensor96752 жыл бұрын
ZC Sensor has also Bluetooth inclinometer with Android app. Contact contact@zc-sensor.com, now!