the first time where a CCL train runs overground, great video btw!
@ahboi_trains201 Жыл бұрын
correct, and thank you! 🥰
@calvinkulit Жыл бұрын
you're only counting overground on local soil, yes?
@ahboi_trains20110 ай бұрын
@@calvinkulityes, after all they'll be forever underground once they're done with the testing at SRTC.
@SBS1z9 ай бұрын
Th outer livery is reskinned, uses C830C DRMD and motor, Doors and main interior is C830, seat colour combination is different, and the extra window at the end of each car! Plus the doors are abit thicker if U haven't noticed ❤❤❤
@SGrailadventure2004 Жыл бұрын
At this point, NEL and CCL are the true 'underground or Alstom' version to the NSEWL as the C851E acts as a 'backup' model of the C751C and C830C while supporting the new extensions in which the model was brought for. I wonder if the C851E will use the old announcements that the C830C is currently using also when it debuts
@Fals3Agent Жыл бұрын
such a shame that these trains have these beautiful ceiling-to-seat windows but they only run underground.
@MoraxIsDEAD8 ай бұрын
It's so rare for ccl to be overground but
@ihavenofriends1817 ай бұрын
so sad that it does not have the same blue doors as its predecessors
@sussy0015 ай бұрын
@@ihavenofriends181only C830C has it The older C830 have white door
@hannabarberanicktoons2014 Жыл бұрын
Wow! It has C830C Motor but with C830's door interior. Now I can call this a really CCL C851E
@SGrailadventure2004 Жыл бұрын
C830C doors looks a bit weird compared to the C751C
@lukehackner9085 Жыл бұрын
B l u e
@gabrielkoh Жыл бұрын
I will still enjoy listening to my english female singer songs(CCL white playlist)in this train
@gabrielkoh18 күн бұрын
I will take photos of the train doors in this train for my personal use
@svc855bsoe10 ай бұрын
By the time C851E (CCL) debuts in around Year 2025, All C651 trains has been fully retired by Early 2025
@n9obs_win237 Жыл бұрын
2:10 old announcements! c851e motor is just c830c lol
@josephinthechickensoup123 Жыл бұрын
Is the train testing centre beside the Tuas west depot?
@94Princeking Жыл бұрын
Yes
@Im_nobody-A3502 ай бұрын
It is also just before Tuas Checkpoint
@ltankk9 ай бұрын
1:09 that huge gap MIND THE GAP MIND THE GAP MIND THE GAP
@caja1491 Жыл бұрын
Saw the DRMD above the door, just like NEL. "Why you never give me an LCD screen, why? Why give me an outdated DRMD?"
@ahboi_trains201 Жыл бұрын
LTA and their shinenegans once again, haha
@caja1491 Жыл бұрын
@@ahboi_trains201 The speech bubble is I got from BoredShawn.
@MrColinTheBusDriver Жыл бұрын
@@ahboi_trains201 HAIYA
@singaporetrainenthusiast Жыл бұрын
the first ccl train to ever see daylight
@Gregoryhi-5fan2 ай бұрын
when will they debut
@svc855bsoe Жыл бұрын
I like this C851E (CCL) train, its my future most favourite public transport series better than c151 and c830
@BusandTrainLover577 ай бұрын
I am excited for new c851e ccl train, its more intresting than old trains
@AlstomMetropolisCCL8757 ай бұрын
I said C851E (CCL) and 4th Generation Train (CCL) are my same opinion and they are both my favourite trains on earth
@TimothyMokCJ Жыл бұрын
Also saw the new Live Firing Area sign "Force May Be Used - No Entry Beyond This Point, Keep Clear" with the soldier having a gun and toxic substance.
@HarrisonLuiEKYiss8 ай бұрын
I was hyped for the new CCL and NEL trains… until they don’t have the new DRMD display. I understand that Alstom didn’t get the order to make the DRMD display but how come LTA wont replace with the new DRMD display??? 😭
@lowsimlim92993 ай бұрын
Cost saving!
@SBS8271H Жыл бұрын
Singapore Rail Testing Centre
@YaoboyProd2K154 ай бұрын
The CCL C851E has a lot of differences as compared to the NEL variant, but disappointingly, doesn't have a LCD DRMD.
what happen if you PUR INSIDE ALSTOM R151 INSIDE CIRCLE LINE
@MrYoungGreenGuy5310 ай бұрын
The first ccl outside from the tunnel
@SBS8271H Жыл бұрын
East Coast Integrated Depot for East-West Line, Downtown Line and Thomson-East Coast Line.
@ahboi_trains201 Жыл бұрын
This isn't the East Coast Integrated Depot my guy, it is the in-progress Singapore Rail Testing Centre in Tuas, all the way in the dead West of the country, haha
@josh8897010 ай бұрын
same colour scheme across all cabins?
@ahboi_trains20110 ай бұрын
for now, yes it seems so.
@svc855bsoe10 ай бұрын
My favourite trains in 2043, 1) Both Unrefurbished and Refurbished C851E (CCL) & C851F (CCL) 10/10 3) Seletar Line Train 10/10 4) Replacement Rolling Stock of C830 and C830C 10/10 5) Refurbished C751A 10/10 6) R151A 10/10 7) C751C 10/10 8) CR151 (CRL) 10/10 9) Both Unrefurbished and Refurbished CT251 9/10 10) C830C 8/10 11) Refurbished C151B/C 7/10 12) Replacement Rolling Stock of C951 7/10 13) CJ151 7/10 14) Unrefurbished C151B 5/10 15) Unrefurbished C151C 5/10 16) 2nd Generation Train (TEL) 5/10 17) R151 3/10 18) Replacement Rolling Stock of C751A, C751C and C851E (NEL) 3/10 19) 2nd Generation Train (DTL) 3/10 19) C851F (NEL) 1/10 20) C851E (NEL) 1/10 21) Refurbished C951 0/10 22) Refurbished C830 0/10
@Athens-Teh Жыл бұрын
Which depot is this?
@ahboi_trains201 Жыл бұрын
This isn't a depot, it is an integrated rail testing centre in Tuas for new trains to tested before their official revenue service debuts.
@Athens-Teh Жыл бұрын
Ok wow@@ahboi_trains201
@Athens-Teh Жыл бұрын
I actually like the C851e CCL trains @@ahboi_trains201
@ZhaoZimingPl11 ай бұрын
This is the new Singapore Rail Test Centre.
@madamwong54298 ай бұрын
I thought Circle Line got LCD screen at doors but why this is not LCD Screen
@ahboi_trains2012 ай бұрын
I think you meant the North East Line, their oldest trains have the new LCD screen for their upgrade works. This new Circle Line train for some reason don't have it, damn wasted sia
@madamwong54292 ай бұрын
@@ahboi_trains201 i think the circle line should do the upgrade to TV screen for the train with white doors
@ahboi_trains2012 ай бұрын
@@madamwong5429 I think so too, but it is still LTA's decision at the end of the day, hopefully they do so!
@ihavenofriends1817 ай бұрын
why "Please do not lean ON the train doors" instead of "AGAINST"
@SebastiansEpicVideosOfficial7 ай бұрын
Because it has old announcements for testing
@ahboi_trains2012 ай бұрын
That was the old 2012 announcements, used by Circle Line trains back when the Marina Bay Extension first opened. As to why they changed it, still have no idea till today! 😅
@Felix87953.YTStudio Жыл бұрын
This is actually the same motor as C830C,I can't believe they are using the same motor just like North East line C751C😂😂😂😂
@ahboi_trains201 Жыл бұрын
Yeah, they directly copied the motors directly from their respective Gen 2 predecessors.. really lives up to the batch 2 joke! 😂
@Felix87953.YTStudio Жыл бұрын
I know,first time to hear C851E's motor sounds😅😅😅😅
@94Princeking Жыл бұрын
See C851E NEL vvvf motor copy C751C and then C851E CCL copy C830C vvvf motor
@SGrailadventure2004 Жыл бұрын
Just like the C151B and C151C for NSEWL
@Felix87953.YTStudio Жыл бұрын
@@SGrailadventure2004 Agreed!
@yugurocreamy Жыл бұрын
door like c830
@thealexpshow7822 ай бұрын
Lots of english in Singapore, wow thats interesting
@ducnguyentrung2208 Жыл бұрын
C851E has the same motor sound as C830C
@svc855bsoe Жыл бұрын
C830C and C851E (CCL) are boy cousins, my favourite is C851E (CCL), i like C830C abit and i abhor C830
@Idkidgaf22 Жыл бұрын
It uses old announcement
@MrColinTheBusDriver Жыл бұрын
Sounds different from C830C
@ahboi_trains201 Жыл бұрын
It sounds different because of the rather slow acceleration we were shown.. but nonetheless, motor is still the same as the C830C.
@svc143bsoe Жыл бұрын
I like the motor of c830c and c851e (ccl) better than c830, pls respect my opinion
@lukehackner9085 Жыл бұрын
The c830 is hella quiet, so it’s understandable
@svc143bsoe Жыл бұрын
@@lukehackner9085 c830 must go to hell
@Last_stand_lalaloopsyfan Жыл бұрын
Holy the CCL C851E is much more cleaner than NSL like there's a lot of bird shit dropping on the latest NSL train like how they gonna clean this up😂
@ahboi_trains201 Жыл бұрын
I mean yeah, the NSL trains are already running for some time so its bound to kena a lot of bird shit haha xD
@calvinkulit Жыл бұрын
I mean, one will run in a fully underground line while the other runs on elevated track
@hapticpleasure3 ай бұрын
bruh no lcd drmd
@makmsjsiqT2 ай бұрын
Bro is old announcement
@re_newjeans Жыл бұрын
can they just install those drmd screens instead of a route map display? kinda bored with the drmd map displays...
@ahboi_trains201 Жыл бұрын
I wish so too, but it seems like they're bound to stick to the route map display anyways..