The process with which solar panels are manufactured and the way quality is controlled determines the quality of the solar photovoltaic module, which in turn is very crucial to achieve the maximum possible efficiency & output. We use A Grade Solar cells and other raw materials are also procured from Tier one suppliers. Following steps are involved in manufacturing of solar panels:
1. Cell Testing & Cutting
Solar cells are checked and inspected using advanced optical or imaging sensors to ensure all the components are located correctly and the cells wafers, which are very delicate, are not damaged or cracked. and with the help of a laser machine they cut into different dimension depending on the wattage of Solar Panel. Cutting is skipped where full size cell is required.
2. Tabbing & Stringing
To make a solar cell array the first step is tabbing and stringing. Multiple ribbons are first soldered to the front and back surfaces of individual PV cells (tabbing). After tabbing the stringer subsystem which solders the front side ribbons of a first PV cell to the back side ribbons of the neighboring PV cell to form strings of PV cells wired in series.
3. Lay-up & Bussing
In this process the solar cell strings from the stringer are placed on layup table above EVA-covered glass. A small pieces of adhesive tape is applied the on the cells to hold them in place. This process is called lay-up. Now second layer of EVA sheet, polymer back-sheet is placed on solar cell array. The bus wire is soldered with tab wires .
4. Visual Inspection
Visual inspection of a PV module performed before the module has been subjected to environmental, electrical, or mechanical stress testing in the laboratory. This visual inspection is done by looking at the glass underneath to check the PV module alignment, cell matrix and presence of dust particle or other element on cell.
5. Electroluminescence Testing
Bluebird solar panels are 100% EL tested. Electroluminescence technology allows asset us to clearly identify the defects in the modules that are invisible otherwise like cell damage / microcracks in the inner structures of the solar cells that can cause underperformance or hot spots in the future. This also checks inactive strings, cell breakage and fissures.
6. Lamination
The encapsulation of the solar cells through lamination is a crucial step in solar panel manufacturing. It ensures longevity of the solar cells of the PV Module. During the lamination process, the prepared 5-layer module is placed in the lamination machine and heated to max. 135°C for 20 -25 minutes. The laminate that comes out is completely sealed and is left for 10-15 minutes to cool down till it reaches room temperature.
7. Framing
Solar panel framing refers to the process of attaching protective and strengthening aluminum frames to the PV laminates of a solar panel. The frame that slides around the laminate will be filled with silicon adhesive. Then, the frame will be pressed around the laminate. The holes on the back of a PV frame make it easy to install the panels on a mounting structure.
8. Sun Simulation Testing
Sun SimulatorTest or Flash Test measure the output performance of a solar PV module. During a flash test the PV module is exposed to a short (1ms to 30 ms), bright (100 mW per sq. cm) flash of light whose output spectrum is as close to the spectrum of the sun as possible. Module parameters are measured at standard test conditions (STC). The results of the flash test are compared to the data specifications of the PV module type which are then printed on the label and pasted at the back of solar panel.
9. Fixing Junction Box
An IP68 rated PV junction box is attached to the back of the solar panel with silicon adhesive. It is the output interface of the solar panel. The diodes inside the junction box keeps the power flow going in one direction, and prevent current from feeding back into the panels when there's no sunshine. it is connected to MC4 connectors with the help of 4mm cables.
10. Cleaning & Packing
The module is then wiped to remove any traces of dust, foreign particles or extra sealant. Being high-priced products, we cannot ignore the significance of correct, safe and efficient packaging of the solar panels. So, Bluebird solar panels are then are then stacked in a boxes. Separators are placed between each module and extra protections are added to the four corners of each module stack. In some cases, modules are also packed in individual cartons boxes to be packed into a large master carton box. Palette packing is also done on demand from customer or on basis of order quantity .
#solarpanels #renewableenergy
visit us at www.bluebirdso...
Micro website - sites.google.c...
Follow us on LinkedIn - / mycompany
Follow Us on Twitter - / bluebird_solar1

Пікірлер: 29
@Misc_useful
@Misc_useful 3 жыл бұрын
Awesome 👏🏻 plant very nice quality panels
@madhugj8645
@madhugj8645 4 ай бұрын
waaree renewables is a great company to invest in Solar Sector
@arupkarmakar1537
@arupkarmakar1537 Жыл бұрын
I have purchased a 100w mono perc solar panel but they send me without graph test report with out purchase bill with faulty rejected panel,scratch has on the solar cell inside the glass,cell is not A grade, shipping box was damaged and panel frame also damaged,I contacted instantly after receiving the product, and requested to replace the product,but they not did.
@user-fh7yk1kw8u
@user-fh7yk1kw8u 2 жыл бұрын
Without mask and gloves ke module clean kar rahe hai... Inke ander kitna chemical jata hoga har roz
@rajjoshi2685
@rajjoshi2685 Жыл бұрын
i hope they must be paying well to these workers.
@ZubairKhan-vs8fe
@ZubairKhan-vs8fe 2 ай бұрын
No
@zaheerbhatti-uv2wi
@zaheerbhatti-uv2wi 10 ай бұрын
Mashallah
@zaheerbhatti-uv2wi
@zaheerbhatti-uv2wi 10 ай бұрын
Sar ji job milegi
@ramendragupta5482
@ramendragupta5482 Жыл бұрын
i want to purchase 400 watt 24 volt panel for single 150 ah bttry ......with mppt charger its 9 ampere will be double to a single battry or not ? otherwise its bttr to take 190 watt 2 panel.....kindly reply
@BluebirdSolarIndia
@BluebirdSolarIndia Жыл бұрын
Thank you for contacting us. We request you to kindly share your query regarding Solar Panels at bit.ly/31u6SPU. Bluebird Solar team will contact you shortly.
@sandipchaudhari4302
@sandipchaudhari4302 Жыл бұрын
Auto machine nahin hai kiya
@BluebirdSolarIndia
@BluebirdSolarIndia Жыл бұрын
Glad to inform you that Bluebird Solar Now has a 300 MW Fully Automated Manufacturing Facility.
@arinwal5362
@arinwal5362 6 жыл бұрын
wow
@rahulanand4606
@rahulanand4606 6 жыл бұрын
What is the cost of the manufacturing plant I want to setup.
@भक्ति_भाव-8001
@भक्ति_भाव-8001 6 жыл бұрын
RAHUL ANAND give me your mail id . I will send you quotation
@gautamjadhav4818
@gautamjadhav4818 5 жыл бұрын
@@भक्ति_भाव-8001 What is the cost of the manufacturing plant I want setup in Maharashtra please send me details my mail ID gautamsenterprises1@gmail.com
@umamahesh9789
@umamahesh9789 4 жыл бұрын
@@भक्ति_भाव-8001 hii can you send me quotation for cost of manufacturing plant
@DanzZerous
@DanzZerous Жыл бұрын
Sitting on a chair in a corporate promotion video is a lazy move
@rajpawar4173
@rajpawar4173 7 жыл бұрын
What is cost of 1 kv solar panel mono and poly
@BluebirdSolarIndia
@BluebirdSolarIndia 7 жыл бұрын
Hi Please share your requirement at info@bluebirdsolar.in or contact 011-47052208/09 to let us understand your requirement in better way Thankyou
@vinithcarmel1433
@vinithcarmel1433 4 жыл бұрын
@bluebirdsolar.in wast is the cost of a plant
@lovevarshney4579
@lovevarshney4579 4 жыл бұрын
@@BluebirdSolarIndia सर जी , आप स्टेबलाइजर की सर्विस पर ध्यान दे एक महीना हो गया अभी तक इंजीनियर नही आया है । जबकि में सबसे ज्यादा स्टेबलाइजर व सोलर पैनल बेचता हु आपके । जय भोले इलेक्ट्रॉनिक बिल्सी जिला बदायूँ up 9837164855
@BluebirdSolarIndia
@BluebirdSolarIndia 3 жыл бұрын
@@lovevarshney4579 Dear Sir, Sorry for inconvenience and thanks for sharing the grievance. You can dirctly contact the branch at - 1800 11 0717 OR 011-46025588)
@binuboruah3590
@binuboruah3590 Жыл бұрын
Let See
@rakeshkumargupta3087
@rakeshkumargupta3087 5 жыл бұрын
Mai Indosolar Ltd me kam kiya hai Bhai job milega experience 4 years
@arupkarmakar1537
@arupkarmakar1537 Жыл бұрын
Don't buy,this is my first and last time purchase with blue bird solar,I trust them,and they broken my trust.I am going dealership from West Bengal but now I not taking bluebird solar dealer ship after this experience with blue bird solar company.
HOW IT'S MADE: Solar Panels
9:05
How It's Made
Рет қаралды 90 М.
How Solar Panels Are Made in 2024
15:32
Solar Surge
Рет қаралды 5 М.
艾莎撒娇得到王子的原谅#艾莎
00:24
在逃的公主
Рет қаралды 54 МЛН
7 Days Stranded In A Cave
17:59
MrBeast
Рет қаралды 96 МЛН
Get 10 Mega Boxes OR 60 Starr Drops!!
01:39
Brawl Stars
Рет қаралды 19 МЛН
Jinko Solar Virtual Tour-Cell Factory
7:27
JinkoSolar
Рет қаралды 22 М.
First Solar's Module Manufacturing Process
3:46
firstsolar
Рет қаралды 119 М.
600MW Turnkey Automatic Solar Panel Manufacturing Line
8:07
HORAD HORAD
Рет қаралды 13 М.
High Quality Solar Cell and Solar Module Manufacturing in India
11:17
How Solar Panels Are Made
6:18
Tech Vision
Рет қаралды 471 М.
Solar Panel Manufacturing
11:49
SOLAREX
Рет қаралды 39 М.