I really like the Nervous System analogy. Really helped me wrap my head around SCADA. Hard to put all the pieces together when I'm trying to learn SCADA, EMS, RTUs, ICCP, and more!
@SCADASupportPhАй бұрын
@Hatanpaa yeah, the Nervous system analogy was from my mentor - Robert, and it really stikes me as the best analogy. I'd say start with the SCADA Architecture, and consider all those components as I/O devices. good luck on your learning, make sure to have fun!
@RemjiusMiyaiodongo Жыл бұрын
I like the speed at which you are explaining your videos ..
@SCADASupportPh Жыл бұрын
Thanks! Hope you found it useful
@chisomchuba96727 ай бұрын
Sarcasm?
@blue-peridot1087 Жыл бұрын
Very helpful
@SCADASupportPh Жыл бұрын
Thanks! Happy to help
@qingsenmeng83238 ай бұрын
Nice and thank you for share
@SCADASupportPh8 ай бұрын
@qinsenmeng8323 thanks! glad you appreciate it!
@javadtaghavi Жыл бұрын
sehr hilfreich
@SCADASupportPh Жыл бұрын
Vielen Dank @javadtaghavi! I hope google translate got it right, as I want to say "Thank you very much" :-)
@lovetacoma86042 жыл бұрын
thank you.
@SCADASupportPh2 жыл бұрын
You're always welcome!
@saeedahmed46512 жыл бұрын
For a typical 300 MW solar power plant, with substation 33kV/220kV what will be the cost for the scada system including engineering, hardware, commissioning, and software.
@SCADASupportPh2 жыл бұрын
@SaeedAhmed the overall cost of the SCADA system varies due to a lot of factors: Engineering and Commissioning - this will be more dependent on your preferred contractor as you'll be paying for Manpower and skillset. Hardware - dependent on the type of HW to be used ; types of cables and or connections (fiber, ethernet, wireless etc), Meters, Data Loggers, Virtual Machines, PPC (power plant controllers). the price would also double if you'd consider setting up a redundant network. Software - for those passive devices (Smart Meters, RTACs, etc) there is already an OEM software bundled with the hardware. However, for your main SCADA Application, this is separate and will be defined by the number of tags you need. Historization is also a separate package as well as Alarming and /or Events Generation. All of the above would also vary depending on your geographical location as some equipment and manpower cost may differ from one another.
@saeedahmed46512 жыл бұрын
@@SCADASupportPh thanks dear for your detail response. Just a rough estimation in dollars, how much it will be. Can you please share the price range. Location will be middle East.
@saidsorour10975 ай бұрын
thanks for your informative video. may you let me know where could i get Scada for on grid solar plant 80 kw? i live in Kuwait
@SCADASupportPh3 ай бұрын
@saidsorour1097 I would recommend to check out these solutions: www.inaccess.com/scada/ n3uron.com/
@lejlamony8 ай бұрын
Hi. I need scada for on grid sola plant 155kw where to buy it.
@SCADASupportPh8 ай бұрын
@lejlamony, thank you for your inquiry. Would you be able to share where the plant would be located? This will give us a good baseline and help scout local suppliers for you to evaluate.
@lejlamony8 ай бұрын
Hi. Location is in Bosnia. Regards
@SCADASupportPh8 ай бұрын
@lejlamony since the location is within Southeastern Europe, I would recommend to check out these solutions: www.inaccess.com/scada/ n3uron.com/ Hope this helps
@saeedahmed46512 жыл бұрын
Can you please explain GC.
@SCADASupportPh2 жыл бұрын
@SaeedAhmed SCADA Grid Controller is an absolute requirement for Plants from
@saeedahmed46512 жыл бұрын
@@SCADASupportPh nice explanation. Is there any documents that you can share gives little bit more insight about Grid controller hardwares, or communication diagram.
@SCADASupportPh2 жыл бұрын
@@saeedahmed4651 RTACs are the most common, those SEL 3530 & SEL 3530-4(selinc.com/products/3530/) that are in-between the SCADA and the substation relays. For large power plants wherein a capacitor bank is required- for the V ratio changes on the high and low side, you should have a load tap changer (LTC). (www.reinhausen.com/productdetail/on-load-tap-changers/tapmotion-ed) Transformer monitoring is a must too (smsystems.co.in/qualitrol-SERVERON-TM8-on-line-DGA-monitor.html) On the subject of documentation, most of the documents I've used are more proprietary, so I would refer you to online / public documentation for those related hardware, or make sure to have a generalized video presentation.
@andreipacala54802 жыл бұрын
where is placed panel photovoltaic?
@SCADASupportPh2 жыл бұрын
@andreipacala the PV are mounted in the ARRAY. Further explanation can be found on this separate video: kzbin.info/www/bejne/gWKVnWyAaNV_f7c
@son_zrek Жыл бұрын
can i have this pdf? pls
@SCADASupportPh Жыл бұрын
Thank you for the inquiry @xicor_ly, unfortunately, my backup copies were purged from my hard drive, so this video is the only copy available.
@RR42636 Жыл бұрын
sure!
@ALI_KERSHEDA Жыл бұрын
can i have this pdf
@SCADASupportPh Жыл бұрын
Thank you for the inquiry @alikersheda, unfortunately, my backup copies were purged from my hard drive, so this video is the only copy available.