Рет қаралды 3,085
Calculation of Quantity of Earthwork for Road Works Numerical, Cutting/Banking. Prepare an estimate of road from chainage 15 to 23. The formation width of road is 12m, side slope 3/2:1 in cutting and 2:1 in banking. Draw cross-sections for cutting and Banking.#engineering TU, PU, Diploma, NEB #nepal