Hey Guys.., Here i have covered about the cost center splitting structure. check the vide and let me know your thoughts through comments section.
Пікірлер: 11
@TheJaebeomPark11 ай бұрын
Thanks to your good explanation, I figured out this concept. Thank you.
@AJAYKUMAR-wr8wx4 жыл бұрын
Hi, very great effort Sir, thanks for your posting.
@kamleshjadav32854 жыл бұрын
Waiting for next series of videos...great job Ramesh
@AJAYKUMAR-wr8wx4 жыл бұрын
Please also post the second part of Splitting structure. Regards A Mishra
@niteshchawda8984 Жыл бұрын
Well Explained for beginners.. It would be great if you would show it how the costs flow in T-code KSS2. I am facing an issue when i run T-code KSS2, where the cost is getting split equally to all the activity and that GL is consumption GL. Hence i am getting confused that against which activity type i will have to assign it? and its not one GL which is getting splitting equally but multiple GLs costs are. It would be great if you suggest a solution. my client is using S4 HANA 2022 system. Thank you.
@infoafsarrnc4 жыл бұрын
Nice explanation... In Production order confirmation... System will post activity hours and value to production cost center to secondary cost element and there will also be actual cost in primary cost element... After closing KSU5, KSII,KSS2, CON2.. How cost center balance is getting zero and moving to Proruction order... It should have over/under allocated right as there are secondary posting too? Please explain the logic
@CommerceKnowledgeDuniya2 жыл бұрын
Thanks Sir.If possible mention T codes.It will help
@rishabhpurohit83332 жыл бұрын
Please post the part 2 -user activity
@imtiazhussainkhattak1434 жыл бұрын
Hi can you please tell me how to create functional area wise PnL when cost center accounting is active and functional area is maintain center center
@nayabrasool87574 жыл бұрын
Sir plz upload new asset accounting S4 hana
@hkpadmanabham7859 Жыл бұрын
You seem to have very good knowledge, but quite a haphazard and unstructured way of presenting, which works not in your favor. It would have helped, if you have explained the concept, then the steps required, then started the configurations. In this case, until you came to 55% of your session, you did not even realize activity types are not created. at 4.42 seconds, what is the column header for H, are these activity types or cost centers? C80 and C74 are both salaries. I am not trying to criticize you, but giving you constructive feedback, so that, your videos gets its deserving recognition.