Steel Distribution Pole Install on Energized Line

  Рет қаралды 21,314

T&D World

T&D World

Күн бұрын

Пікірлер: 9
@PilotVBall
@PilotVBall 4 жыл бұрын
No way! That pole just went straight into mud and not bolted onto a concrete base. Good lord! That's 3rd world style.
@jaywillow9927
@jaywillow9927 5 жыл бұрын
Those guys are so lucky that a company actually gave them the shot to do that work. They are SOOOO lucky. The company could have moved right by them and hired the next applicant.
@sylviaelse5086
@sylviaelse5086 6 жыл бұрын
Do they ground the pole while raising it?
@Marsalis_CW
@Marsalis_CW 6 жыл бұрын
Sylvia Else No, you can't. That is why they were putting the insulation around the pole
@sylviaelse5086
@sylviaelse5086 6 жыл бұрын
I don't see why the pole cannot be grounded.
@Marsalis_CW
@Marsalis_CW 6 жыл бұрын
Sylvia Else because you will have a wire attacked to the pole while you're setting it
@linehandibew6205
@linehandibew6205 4 жыл бұрын
Because you don’t want to stick a ground into energized primary. Hence why they’re putting protective guards on it to isolate it from energized lines
@sylviaelse5086
@sylviaelse5086 4 жыл бұрын
@@lobola956 I'd have thought grounding it would be manageable. The grounding cable doesn't have to be particularly short, and it would help prevent accidents.
@DragonBuilds
@DragonBuilds 6 жыл бұрын
First!
Temporary Extension Arm Installation
7:35
T&D World
Рет қаралды 38 М.
BPA Install of Transmission Line: Hole Digging
6:06
T&D World
Рет қаралды 22 М.
The IMPOSSIBLE Puzzle..
00:55
Stokes Twins
Рет қаралды 141 МЛН
Из какого города смотришь? 😃
00:34
МЯТНАЯ ФАНТА
Рет қаралды 2 МЛН
Underground Distribution Upgrade for Hospital
6:17
T&D World
Рет қаралды 35 М.
How to dig a hole and set a pole
17:29
Altec Incorporated
Рет қаралды 26 М.
Arm Buddy for Distribution Line Tie-Ins
5:26
T&D World
Рет қаралды 50 М.
Pole-top Rescue
17:54
High Voltage Custom
Рет қаралды 7 М.
Line Sag with Dynamometer
6:26
T&D World
Рет қаралды 78 М.
Powerline Alaska
42:47
Wilson Construction Co
Рет қаралды 2,9 МЛН
FIRST TIME CLIMBING 55 FT POLE - NLC - California Campus
4:36
a.w. flickks
Рет қаралды 16 М.
H-Frame Transmission Line Install: Framing
6:19
T&D World
Рет қаралды 106 М.
What Is A Black Start Of The Power Grid?
17:06
Practical Engineering
Рет қаралды 2,3 МЛН
PG&E Power Pole Replacement
32:17
WardCo
Рет қаралды 35 М.