Detailed video for installation procedure of Street light pole with LED Luminar termination and installation.
Пікірлер: 11
@hilalhm408 ай бұрын
Nice work, this was the last pole in the line?? because there was only one cable.
@Rashid-iqubal8 ай бұрын
Correct ✅
@dineshnagda202 ай бұрын
Which core cable used in street lighting?
@Rashid-iqubal2 ай бұрын
4C cable we use
@hilalhm408 ай бұрын
Engineer, I have a question, when you connect in series, one pole after another, we will use one single core each time? Mean for example red then blue then yellow, then again red for the forth pole and so on??
@Rashid-iqubal8 ай бұрын
Yes we connect each pole in different phase. Like starting from pole 1 to pole 6 we terminate cable fist pole with Red phase then 2nd pole with Yellow then 3rd pole with Blue then again repeat same pattern to the remaining poles. We are doing this type of termination to make load balance.
@hilalhm408 ай бұрын
@@Rashid-iqubal Thank you for your reply engineer
@zks7762 Жыл бұрын
Please upload wiring termination and layout of street light..
@Rashid-iqubal Жыл бұрын
Please see this link, it might be helpful for you. kzbin.info/www/bejne/i6K0hqluqayVac0
@anirbandey56083 ай бұрын
Please show foundation construction
@Rashid-iqubal3 ай бұрын
Its part of civil construction, anyway i will try to make video on foundation