Sir please describe prop setting with prop in hilly area like ULE
@karmajamtsho55744 жыл бұрын
How is it practically done to measure half back to back distance at the bottom of the stub with tape or total station since the stub bottom is inside the pit ?
@karmajamtsho55744 жыл бұрын
I mean "how is it practically done to measure half back to back diagonal distance from the center point at the bottom of the stub with tape or total station since the stub bottom is inside the pit ?"
@ashishkumarsharma23834 жыл бұрын
Nice sir
@Mvsiva0017 ай бұрын
i had come across the word called profile slope. please let us know how do we calculate profile slope??
@vinodkumar.skakde93402 жыл бұрын
Please explain 2. Point how slope of stub is taken
@pratulmishra1644 жыл бұрын
Please make more vedio related to tower engineering
@abhishekchourey96993 жыл бұрын
Sir how to finalise top and bottom level of stub
@tapasbhumij9113 жыл бұрын
Rectangle tower prop seting
@abdelaziztalbi864 жыл бұрын
good :)
@sekhhafizulislam97703 жыл бұрын
Sir drawing ko flow korke measure ment dikhanese acchese samaj aayega.
@kmmahto82412 жыл бұрын
Aap mukharge sahab hai kiya?
@senakahettiarachchi50443 жыл бұрын
please any one know differance of Dx and F
@prasannapaudyal45494 жыл бұрын
Example please
@aslamshaikh16974 жыл бұрын
Slope of stub calculating trick or formula please
@informativeontransmissionl86414 жыл бұрын
Tan alpha x root 2 / Developed slope
@shaazsab74313 жыл бұрын
@@informativeontransmissionl8641 sir What is developed slop??
@ashishbiswas69442 жыл бұрын
Rict angel prof set kase kore
@goutamgarai43504 жыл бұрын
Pls reply sir Hape diagonal 4949 Hape back to back 3500 Stub length 3805 1 meter slop ? Full slop? Formula ve batai sir
@informativeontransmissionl86414 жыл бұрын
U need slope of tower. Formula 4 slope of stub = slope of tower x root 2 / developed slope.
@mrutyunjayabahinipati54543 жыл бұрын
@@informativeontransmissionl8641 sir what is developed slope???