Put soil in water and you will get soup, put boulders down first to get a firm base then smaller stones to fill, if this is flowing water there will also be a current that will drag that soil down into the flow
@grahamparkin24658 ай бұрын
put down a base of heavy rock first....then overlay with fill ......rinse and repeat! or you will be using way too much fill and creating silt!
@choukamebkhout34078 ай бұрын
in the same place since a week ago
@SangPejuang.8 ай бұрын
Good luck with your work
@jackwalker35828 ай бұрын
There is a drain pipe that will be covered u[ unless they extend it.
@johnandersen63648 ай бұрын
Yes, I was looking at that too.
@BackintheUSSR20248 ай бұрын
It is obvious that there is no engineer involved in the planning of this road. Like the first 2 comments mentioned, you have to put a good solid base of blast rock down to lend strength to the base. Good luck.
@johnandersen63648 ай бұрын
Yup, If there was an engineer involved he probably graduated from he school of, soft rocks......
@croserktm8 ай бұрын
in the same place since a week ago in all chanels :(