TAITON TAV-3AL-Kit : Three Linkage Intermoving Door Installation Instructions

  Рет қаралды 10,447

TAITON ARCHITECTURAL INDIA (OFFICIAL CHANNEL)

TAITON ARCHITECTURAL INDIA (OFFICIAL CHANNEL)

Күн бұрын

you're one step closer to creating a seamless and efficient space. This installation guide will walk you through the steps to ensure a smooth and successful setup of your three-linkage intermoving door system.
Before you begin, make sure you have all the necessary tools and equipment handy, including a drill, screwdriver, measuring tape, and level. Additionally, ensure that you have thoroughly read the instruction manual provided with the kit.
Step 1: Preparation
Start by unpacking the TAITON TAV-3AL-Kit and lay out all the components in an organized manner.
Carefully review the installation instructions to familiarize yourself with the process.
Measure and mark the installation area on the door frame, ensuring proper alignment and spacing for the three-linkage system.
Step 2: Installation of Top Track
Begin by installing the top track of the three-linkage intermoving door system. Position the track securely on the top of the door frame using the provided screws.
Use a level to ensure that the top track is perfectly horizontal and adjust as needed.
Once the top track is securely in place, proceed to install the bottom track using the same method.
Step 3: Mounting of Door Panels
With the top and bottom tracks installed, it's time to mount the door panels onto the tracks.
Carefully lift each door panel and align it with the tracks, ensuring that the wheels on the bottom of the panel fit securely into the bottom track.
Once the door panels are in place, secure them to the tracks using the provided screws, making sure they are evenly spaced and aligned.
Step 4: Adjustment and Testing
After mounting the door panels, test the functionality of the intermoving door system by sliding the panels back and forth along the tracks.
Make any necessary adjustments to the alignment or tension of the tracks and panels to ensure smooth operation.
Once satisfied with the functionality, tighten all screws and bolts to secure the door panels and tracks in place.
Step 5: Final Checks
Before completing the installation, perform a final inspection of the three-linkage intermoving door system to ensure everything is securely installed and properly aligned.
Test the doors again to verify smooth operation and make any last-minute adjustments if needed.
Congratulations! You have successfully installed the TAITON TAV-3AL-Kit and transformed your space with a functional and stylish three-linkage intermoving door system. Enjoy the enhanced convenience and aesthetic appeal that this innovative solution brings to your home or business environment.

Пікірлер: 1
@suhandi8729
@suhandi8729 16 күн бұрын
Good👍👍
It’s all not real
00:15
V.A. show / Магика
Рет қаралды 20 МЛН
Арыстанның айқасы, Тәуіржанның шайқасы!
25:51
QosLike / ҚосЛайк / Косылайық
Рет қаралды 700 М.
Fabrication of Sliding & Folding Doors from Swisstek Aluminium
4:12
Swisstek Aluminium
Рет қаралды 1 МЛН
ESC FW1-50 Series
4:35
ESC Aluminium Systems
Рет қаралды 170 М.
3 plus 0 installation video durospace
3:31
DURO SPACE
Рет қаралды 9 М.
Twin TL - Ducasse Industrial
4:38
Ducasse Industrial
Рет қаралды 1,2 МЛН
SẢN XUẤT CỬA TRƯỢT SLIM
2:26
Nguyễn khắc Linh
Рет қаралды 30 М.
GLOBAL ACCESS - Bottom Mount Cable Driven Telescopic Gate Kit
5:59
GLOBAL ACCESS
Рет қаралды 330 М.
Process of Making Glass Partition Door. House Door Mass Production Plant
11:24
All process of world
Рет қаралды 851 М.
HETTICH Grand Neo 400 Installation BY #wify  #HETTICH
12:05
Training at WIFY
Рет қаралды 13 М.
DEKKSON frameless sliding telescopic system
5:43
ZAMI GZ
Рет қаралды 9 М.
It’s all not real
00:15
V.A. show / Магика
Рет қаралды 20 МЛН