I purchased Eric's book on Kanban, adapted it at work, and we had: - Very happy developers - Lots of stuff shipped - Very few production incidents - Stress free deployments - The ability to set goals and meet them Some areas of the business bucked at the implementation, so they needed extra care, but it all felt worth it. Then, some stuff changed, and to spare you many details, those teams are back on "Scrum". They now have: - Much less happy developers - Lots of stuff shipped, but often it doesn't look like the right stuff to be shipping - The rate of production issues and items being pulled before deployments increased tremendously - Deployments never ever ever stress free - Basically every sprint items roll over, they never have an experience where they set aside a goal and then complete that entirely
@bonybai8 жыл бұрын
Best introduction to kanban i have come across. No nonsense, just do it. And still providing lots of in depth through answering the questions. Make sure you listen to the complete question section. Great!
@Iamolivialondon4 жыл бұрын
absolutely loving this, especially how Eric has used the KanBan method whilst answering the questions to gain an active understanding of it... BRILLIANT
@pnalos3 жыл бұрын
(Watched six years after posting, been doing Kanban for >2 years, haven't read his book) This is delightful and refreshing. Well worth the hour to watch. We do a lot more than was presented here, and I like that, but I also gained from this video. Thank you!
@albertstein74333 жыл бұрын
Your example of letting the stakeholder put the deadline task to the board on their own, by transperantly understanding which task is really the next priority is brilliant!!!!!!!!
@samiraslan57372 жыл бұрын
This is really insightful. I learned a lot in this lecture. I loved the example he used at the beginning of the session when he converted the questions into Kannan. Thank you very much ❤️
@hassaansadiq26516 жыл бұрын
WAOOOO. Awesome talk. Thanks a lot Eric Brencher. You did the best and most practical explanation of Kanban.
@buffalosoldat5 жыл бұрын
I wasn't expecting such a great talk, seriously! This guy is amazing and entertaining to watch. I just feel sorry for him that his audience seems to have a stiff stick up in their asses and are not as cool as that dude is.
@Andrewtmcb4 жыл бұрын
This guy is my friends dad and was also a professor of mine in grad school. I assure you he is as cool as he seems. Awesome dude.
@patmull13 жыл бұрын
"This is how you prioritize. It's not hard... It's stickies and you move them around." They sounded to be almost offended by how simple he made it lol. But that is the problem of a lot of knowledge that is spreaded about Agile. People are making it so hard and complicated and often absolutely unnecessary. But it's the area where software devs, college professors and project managers meets together, so no wonder they are doing everything to make from those simple ideas abslolute nightmare full of pretenious talks. Thanks god there are no statisticians and bitcoin traders involved in this...
@AlishaAFoster4 жыл бұрын
love that answer at 50:00 about big complex tasks & splitting research/breakdown/create design docs into their own separate items...i tend to think about splitting that stuff into separate boards, but it really can be all under one.
@dmytroprokopenko14723 жыл бұрын
Very straightforward with low overhead, going to implement that in my team
@ChaunceyGardner1002 жыл бұрын
excellent kanban talk. love the the way you presented it Eric. Very engaging.
@LearningToCodeAndDesign2 жыл бұрын
Every time I watch Eric’s talk I learn so much!
@thomascurro14053 жыл бұрын
Excellent Quality Talk. Getting So much knowledge on kanban boards. This guy is amazingly gifted
@sundersingh95083 жыл бұрын
Zksjhahahaagga
@toysforever73933 жыл бұрын
I like the examples in the end with waterfall and scrum teams switching to kanban :)
@dasraja44793 жыл бұрын
Great talk. My only observation is, related to the suggested process for estimation. A big assumption is that, the complexity of the work more or less similar . In software development context , IMHO , that’s highly Unlikely. And another point I want to highlight is organization culture. MS is ahead of the game in that area compare to other companies. That makes things significantly different.
@arduiscane2 жыл бұрын
This was a much more simplistic view of Kanban than Andersons take and that's both good and bad to me. I think it could get more people to buy in and it can act as a quick start. My concern is Kanban also has a cultural element to it that requires additional concepts like Kaizen and the value of Slack. I also agree with some comments about the simplistic response to estimating. I agree that as you build trust, you will improve rate of delivery and customers will loosen their grip I have seen it happen. On the flip flop, leadership will always want information to base ROI and investment planning into, and that includes rough estimates and pushing teams to make market deadlines. All in all though, great introduction!
@gbpraveen773 жыл бұрын
Good stuff... clears up your mind about Kanban...
@Liopot685 жыл бұрын
Peter Boyle explaining project management. Brilliant!
@ZaidDesignsTV5 жыл бұрын
Funny...
@tunbakyu2 жыл бұрын
Brilliant... so brilliant.. easy to understand. So hands on! :)
@pastpianist3 жыл бұрын
The main issue I see with all these methodologies is around the creation of the tasks. With the way it's described here, if my org has a massive project that's probably going to take like 8 dev months AND has a due date, then you are effectively needing to do incredibly detailed task breakdowns (in order to get each task to be ~1-3 days of work based on his recommendation) for the entire project up front. That's the only way you're going to be able to tell if you have a chance at hitting the date. around the 1:00:00 mark it was a bit of a gross oversimplification of how how this would work for a large org which was a bit disappointing.
@krunalshah432Ай бұрын
1. How to determine time taken on each sticky from the resource is proper? 2. As you said in a video, Sticky can take 1-2 weeks or more time. What QA team will do if they don't have any work in their bucket to pull in such case?
@miklc85373 жыл бұрын
Great presentation, great questions, great answers. Thank you.
@skisandcars3 жыл бұрын
Great for 'known' task management but not sure i have a clear of how continuous improvement informs the process and how creativity can flourish in designing great. No one framework is a panacea for the challenging work of building great digital solutions.
@max_common_sense6 ай бұрын
Hi there! Thanks for the video. I doubt that Eric will see the comment, still, may be someone else can share their experience. Question: how can you arrange this flow in Jira? Is there a way to create a "column", like "Breakdown" and have 2 sub-columns inside? Or in Jira terms you are forced to have 3 columns for one "Breakdown" like in this video? Eg. "Breakdown - To-do", "Breakdown - Blocked", "Breakdown - Done". Any examples how to organise Kanban board in Kira are welcome! Many thanks!
@vbachris4 ай бұрын
you know, i was thinking about this a couple days ago. everything done in software boils down to an "ask" or in his language "question" EVERYTHING is just an ask. that goes for bugs, stories, features, tasks. at the end of the day, it's someone (to include yourself) asking for something from the current software. giving these things different names only cause unimportant discussions, i.e. "that's not a bug, that's a feature" when they're all "asks" then we just need to determine who's ask is more important and then you have priority.
@jti1073 жыл бұрын
fantastic! looking forward to trying this with my team
@Feliztividad Жыл бұрын
❤❤❤❤❤ thanks!!’
@MikeBozart2 жыл бұрын
great info. thanks.
@tonyennis17875 ай бұрын
36:25 I had that happen to me. I'd task the person with getting an approval from everyone they wanted to skip ahead of. Most of the time they'd go away and you'd never hear about the work again.
@rajadas64322 жыл бұрын
This is awesome and this is how it should work. Unfortunately, not every company is MS. To make this happen the team must be empowered, staffed with right skillsets and transparency is celebrated. Otherwise it become another top-down heavy 'process'.
@robbyriverside4 жыл бұрын
I want to work for this guy. Seriously.
@teamhood10 ай бұрын
Made years ago, still great today!
@DavldLangner Жыл бұрын
Lohnt sich!
@parrisgjerde92124 жыл бұрын
How does one coordinate validation with the task breakdown? Seems there could be a lot of dependencies where revalidation would be required.
@youRube2007 Жыл бұрын
How does this apply to physical product development projects for consumer products like Power Tools, Sporting Equipment, Commercial HVAC equipment... i.e. things that require physical prototyping, multiple phases of lab testing, production line start up, marketing campaigns, production labor training...Typically 2 years to get to a first shippable unit out the door to a customer.
@blahdelablah9 ай бұрын
Toyota was the first company to use Kanban. If you can develop cars using Kanban, I don't think it'll be a problem to use it for developing power tools.
@gautambajekal2383 жыл бұрын
@Eric - YAAT (Yet Another Awesome Talk). One suggestion. Use Fibonacci numbers for estimation so that any estimation errors are covered
@jjaaxx119977333 жыл бұрын
For in house development work, where you have indefinite availability of resource, it seems easy to do Agile/Kanban. But for consulting companies where availability of consultant is limited and customer is adamant about the expected delivery time and budget being fixed and unchangeable, how do you communicate the cost and schedule in each meeting?
@vytautasalisauskas6059 Жыл бұрын
The last part about large scale sounds as SAFe, just with less structure.
8 жыл бұрын
i would ask if internet explorer development uses Kanban.
@veronicaolivares91503 жыл бұрын
sound great :)
@vbachris4 ай бұрын
he used kanban to explain kanban. well played!
@SrividyaYashRudra6 жыл бұрын
Wonderful unique session Eric.... Great!!!
@GiveMeAnOKUsername3 жыл бұрын
I think a good estimate of a backlog item depends on doing a breakdown. But for several items in one go, the WIP limit would prevent this. I suppose you could do a separate Kanban for estimation alone.
@GarikTate3 жыл бұрын
Can you make those double columns functional in Jira?
@noklat44823 жыл бұрын
You can make equally named swimlanes. It would be a crude solutuin, be very usable. Alternatively, you can use a single swimlane where issues are given labels like refine v sprint-ready, awaiting-review v in-review.
@kjames7054 жыл бұрын
I am not a software developer or a project manager. Just an everyday Joe trying to get things done at home and work. I have developed my own system combining Eric's Kanban, David Allen's GTD, and many more other systems that I have tested and finally, I have a solid, agile system that works for anything, anytime. Let me know if anyone wants it.
@MrRedstonefreedom4 жыл бұрын
Sure. Do you have a quick description?
@DanielLiljeberg5 жыл бұрын
Number of stickies per day feels a bit crude though unless you know the size of the stickies. Moving 10 stickies a day when they average 30 min to complete would not mean your team would do ten stickies a day if the contents of them took three hours to complete. I decided not to post this because "perhaps a followup would address this"... It did. I get the idea, but still feels a bit crude and finding a "universal size" to break things down into could probably be a bit of work depending on the environment. But sure, over time it would most likley even out.
@Cenot4ph3 жыл бұрын
this works over time your team is working on a specific project or product similarly how people are wasting their time doing estimates that are always wrong. This process cuts down on useless activities
@DanielLiljeberg3 жыл бұрын
@@Cenot4ph Well it could be argued that the work of breaking down tasks into similarly sized bits in order for them to have a similar effort attached to them is akin to estimating. You look at the task, decide if it's roughly the size your tasks usually are (estimate the effort) and if not break it down. I think the main thing, no matter your approach, is to know and clearly communicate why you do it. If that is clear to everyone I'm sure a plethora of approaches could work well for different teams.
@Arghamaz4 жыл бұрын
This is great👍
@veronicaolivares91502 жыл бұрын
Ship online? great :)
@veronicaolivares91502 жыл бұрын
nICE CLASS :)
@SeanBarrett6666 жыл бұрын
The laugh at 52:08 👍
@DiogenesVitali3 жыл бұрын
How to estimate and define the product roadmap in a team that is starting. We are talking about high level features and you don’t have data about team velocity per sample. How would you handle this?
@veronicaolivares91502 жыл бұрын
Wip limit would be like deadline?
@veronicaolivares91502 жыл бұрын
How can I help my country that is Peru to make quicker decitions? And correcting mistakes faster in order to be a first world country? Using Kanban and Scrum. I want the health system to be the best of the world and integrate Traditional Chinese medicine into the SIS (Sistema Integral de SAlud)
@YounesKeraressi6 жыл бұрын
love this guy, thx for the introduction to Kanban, people cant event laugh to the funny's statements what a weird audience..
@astatine00852 жыл бұрын
So, with this method, you don't need to allocate bandwidth time for unexpected (bugs, etc.), you just re-prioritize what can be re-prioritized.
@jasonfanclub42673 жыл бұрын
Google: Gives a talk about project management with Kanban Also Google: Doesn't want to integrate Kanban Features into Keep and/or Tasks
@adhi_r3 жыл бұрын
potential premium feature/product
@jasonfanclub42673 жыл бұрын
@@adhi_r I think they use Write, Smartsheet and Asana internally so I have no hope for any good project management tool by Google
@yousefalfarhoud32555 жыл бұрын
is it applicable for all types of projects or just software ?
@SaifKhan-mz5hz4 жыл бұрын
all
@veronicaolivares91503 жыл бұрын
Thanks G-D for Kanban
@crot104 жыл бұрын
Hi I'm an RTPO we partner with SAFe and I run a full portfolio RT 50+ people globally. I found this useful as a simpler explanation of kanban and I bought your book so I can improve the Program level of the train. My headings are obviously different because they are all all discovery items but what is important is that they run in parallel with the Scrum teams in our PI. I have plans to add additional team to the RT in then coming months and I'm going to give them the option to be Scrum or Kanban. I just have two questions: 1) Is there a ebook version 2) Do you have any recommendation to how to create a split in the columns in Jira. Being a global team there is no wall board.
@arduiscane2 жыл бұрын
I know this is from a year ago, and Id be curious how it's going. I work in an org where teams have been asked to work in SAFe, but the org never adopted any of the practices. Were you able to pull together an ART level Portfolio Kanban? Was it difficult to get buy in ?
@skylvid6 жыл бұрын
Love Kanban.
@cookielover12138 жыл бұрын
Can you use this for pharma companies and drug development?
@wilmerkaplan13098 жыл бұрын
Sure you can. The method was originally adopted from supply chain management to software development, but it's been years since it strated to spread to all industries. We use an online Kanban Tool - kanbantool.com to manage a large estate rentals porfolio. Works like a dream.
@PrasenjitBaisyaBkp5 жыл бұрын
Yes - we can. I work for Johnson & Johnson and we are using Kanban in core areas in our Technology Services organization.
@lakkarajushankar6 ай бұрын
Still working with papers? Why don't you use one of the many software available? Are we going backward?
@matthiasmoser60962 жыл бұрын
The book might be very thin and full of information, but he never mentioned the font size! xD
@gstabel2 жыл бұрын
Big problems and open ended at 50m 45s, very interesting
@veronicaolivares91504 жыл бұрын
Thank you for aharing
@veronicaolivares91503 жыл бұрын
Sorry for sharing
@MartinLichtblau7 жыл бұрын
Doing Scrum without KanBan... why would you do that in the first place?
@veronicaolivares91503 жыл бұрын
I am already waiting for More than a year for a process to finish
@labworx6 жыл бұрын
thanks for the vid, just one remark! whats with the white sox LOL
@najuste6 жыл бұрын
It goes well with a german surname...
@veronicaolivares91503 жыл бұрын
ya man, you always need to have your por siacaso :)
@veronicaolivares91503 жыл бұрын
In Peru things take forever
@pmisconsultinglimited36847 жыл бұрын
anyone notice this presentation discusses: task/work breakdown; estimating; tracking; dependencies; due dates; etc and a lot that needs to be done and captured that is not on this board - also said "all we have is the kanban board - no spreadsheets etc. ". Something really does not stack up with this statement.
@OttawaGuy6 жыл бұрын
It doesn't stack up because you have to let go of your traditional waterfall constraints and let the kanban board and the the agile process be free of some of the items you listed. Don't try to put a lot of management overhead on an agile project, or you'll fail... For instance - task/work breakdown is done by getting stickies decomposed to the same timeframe for effort. Estimating is done the same way. Tracking dependencies is done with sticky note management. Due dates are integrated by figuring out your pace and adding/removing team members accordingly (or reduce scope).
@VolkTron3 жыл бұрын
👍
@browncapitalist48844 жыл бұрын
He didn't convince the audience well on estimations and handling due dates. At the end, he skipped the whole topic with "We are not doing estimations anymore because my team is darn good". It was an interesting presentation. But he skipped the very question I was looking for without a convincing answer.
@guipedr4 жыл бұрын
He talks about it. But he doesn't give the necessary attention to the topic, the "Breakdown" is crucial. you need to breakdown your tasks in similar sizes (i.e estimation of 2 days for each task / stickie), then it's easy to calculete your thoughput and work with bigger estimations and handle your schedule and due dates. They call it Little's law. Average Throughput = Average WIP divided by average cycle time. So if you know the number of cards you have and historically long it takes to complete them, you know the average time you need to get stuff done. Yeah, there's stuff that is in your backlog that hasn't yet proceeded to that first "Breakdown" planning phase, so you have two choices. Get together with the team (a lead developer/technical professional alone could do) and do a quick estimation (mental breakdown of big card in a quantity of smaller 2 day ones) based on experience or proceed with this on your kanban, put on your breakdown/analysis column and do it with a little more patience and assertiveness with the team.
@ruslanfadeev31135 жыл бұрын
Expected a punchline around 2:00
@PaulERose618 жыл бұрын
did he say con bon?
@iluvcakes196 жыл бұрын
Paul Rose that's how I pronounce it
@askcraz1115 жыл бұрын
Check out www.my3dfolder.com - See how Kanban board is literally folded in to your everyday life!
@kdhlkjhdlk4 жыл бұрын
Traditional waterfall? What org on the planet is using waterfall? The moment it was named it was a strawman example.
@xq_nemesis3 жыл бұрын
Think construction companies or other sectors that don’t necessarily do software development.
@veronicaolivares91502 жыл бұрын
What do you think of Udemy?kzbin.infovideos?view=0&sort=dd&flow=grid
@veronicaolivares91503 жыл бұрын
And they should work for a goal that is reach out, do not recieve any payment unless they do what they promise
@samarendrakumarsinha88983 жыл бұрын
IT SHOULD BE A FIRST HOME
@brazorf9993 жыл бұрын
Kanban Police, arrest this man he talks in math
@veronicaolivares91503 жыл бұрын
we need plenty tracking for goverment
@thechoiceisyaws5 жыл бұрын
THIS MAKES ME WANT TO SCOOP UNDER MY NUTS AND TAKE A BIG DEEP WHIFF OF WHAT I'M COOKING DOWN THERE. GREAT VIDEO
@MrUncleHermit6 жыл бұрын
Sounds more like Agile Project Delivery rather than Agile Project Management.
@janeknox30362 жыл бұрын
Eric seems to function as the product owner here. He decides where and if items go in the board. When and how do they specify the work items? He doesnt cover that. How do they size work items and how accurate are they in sizing them? How do they claim to forecast if they dont know what problems may come up? He sounds like he doesnt actually do development, he hand waves so much. I get the feeling he is overstating his success and that there ar many issues he doesnt mention. Executives like to make it look like they are responsible for every success and innocent of every failure. I dont know what they actually contribute.
@Mitchellkirstie3 жыл бұрын
He should have had slides.... LOL
@samarendrakumarsinha88983 жыл бұрын
WE DO IT IN EXCEL ANYTHING BETTER SIR
@veronicaolivares91503 жыл бұрын
Deadlines, not only for shipping. Due date for vaccines
@veronicaolivares91503 жыл бұрын
If they do not produce, then out :)
@tedepz5 жыл бұрын
Kanban is not Agile
@ftnsco8 жыл бұрын
Mehh
@veronicaolivares91503 жыл бұрын
Goverment very slow, I want to wip them...LOL
@miguelangelsimonfernandez54982 жыл бұрын
Lovely but absolutely chaotic and thus less useful.
@veronicaolivares91503 жыл бұрын
Due date for covit end
@ArvinBuising6 жыл бұрын
It's just scrum with extra steps.
@joseperez14643 жыл бұрын
Another snake oil salesman, can’t do anything without at least an approximate cost in mind.