most important bit is to clean the airflow stations for each box. Then use a hood to verify if cfm matches BAS if not calibrate to the certified hood.
@MR-backup10 ай бұрын
How much CFM is that? From the looks of the duct size I'd say right under 1500
@twincam8252 жыл бұрын
Have you installed the new zn341a controler.
@ACHVACTAB13 жыл бұрын
Fyi: The whole point of the DDC system is to NOT have to go stand at the Vav But check-it Remotely !!!!!!!!!! No: it's not Testing it !!!!! Setting and maintaining Cfm set points is Testing it with a t-stat ??
@67tr8763 жыл бұрын
This is what the boss wants. One guy checks its on the BMS and one guy checks it out in person.
@kennyw74533 жыл бұрын
They are verifying damper operation, whats wrong with a doing a visual once in a while instead of sitting behind the front end all day.
@gentv9422 Жыл бұрын
He's checking it remotely. One tech is at the front end opening and closing the damper "remotely" while the other tech is verifying visually.