The new western bypass in nairobi Kenya

  Рет қаралды 262

Jm-traveler

Jm-traveler

5 ай бұрын

Coordinates: 01°13′52″S 36°40′19″E
From Wikipedia, the free encyclopedia
Nairobi Western Bypass Highway
Route information
Length 17 km (11 mi)
History Designated in 2019
Completed in 2022
Major junctions
Southwest end Gitaru
Wangige
Kihara
Ndenderu
Rumingi
Northeast end Ruaka
Location
Country Kenya
Highway system
Transport in Kenya
Nairobi Western Bypass Highway is a road in Kenya. It connects the town of Kikuyu to the town of Ruaka, both in Kiambu County.[1]
Location
This road starts in Gitaru, in near the town of Kikuyu, approximately 24 kilometres (15 mi), north-west of the central business district of Nairobi.[2] The road travels in a general north-easterly direction through Wangige, Kihara, Ndenderu, Rumingi, to end at Ruaka, a total distance of about 16.5 kilometres (10 mi).[1][3] At Ruaka, it will connect to the Nairobi Northern Bypass Highway through Limuru Road.[1]
Overview
This road is one of the four bypass highways built to direct motorized traffic away from the central business district of the city of Nairobi, to alleviate the perennial traffic jams on the city streets. The bypass highways include (a) Nairobi Northern Bypass Highway (b) Nairobi Eastern Bypass Highway (c) Nairobi Southern Bypass Highway and (d) Nairobi Western Bypass Highway. It is one of these four bypass roads that form a 96.7 kilometres (60 mi) ring-road around the city.[1]
The Western Bypass development also involves the construction of 17.7 kilometres (11 mi) of service roads and walkways measuring 2 metres (6 ft 7 in) on both sides of the highway. A total of six interchanges and overpasses will be built, one each in the six townships where the four-lane dual carriageway is planned to pass. This way, the traffic on the highway will not interfere or be impeded by the surface traffic in the urban centers.[1]
Construction
The Nairobi Western Bypass Highway will cost an estimated KSh17.3 billion (US$173 million).[1] In February 2019, China Road and Bridge Corporation, the selected contractor, began construction of this highway. Funding for this project was provided by the Exim Bank of China. Construction is expected to last 39 months.[4]
See also
List of roads in Kenya
List of bypass highways in Nairobi
References
Patrick Lang'at (17 September 2018). "New road project to decongest Nairobi City". Daily Nation. Nairobi. Retrieved 5 March 2019.
Globefeed.com (5 March 2019). "Distance between Nairobi, Kenya and Gitaru, Kenya". Globefeed.com. Retrieved 5 March 2019.
Globefeed.com (5 March 2019). "Distance between Gitaru, Kenya and Ruaka, Kenya". Globefeed.com. Retrieved 5 March 2019.
Mosoku, Geoffrey (26 February 2019). "KeNHA's Sh37 billion road projects for Nairobi, Kiambu". The Standard (Kenya). Nairobi. Retrieved 27 March 2019.
External links

Пікірлер
THIKA ROAD | Kasarani to Nairobi CBD Drive | The best Road in Kenya
16:37
How Many Balloons Does It Take To Fly?
00:18
MrBeast
Рет қаралды 168 МЛН
🤔Какой Орган самый длинный ? #shorts
00:42
Heartwarming Unity at School Event #shorts
00:19
Fabiosa Stories
Рет қаралды 19 МЛН
КАК ДУМАЕТЕ КТО ВЫЙГРАЕТ😂
00:29
МЯТНАЯ ФАНТА
Рет қаралды 9 МЛН
Meet Kenya's Youngest Self Made Real estate Billionaire
18:00
Steven Ndukwu
Рет қаралды 698 М.
Nairobi Scenic Views | Westlands to Western Bypass - Lower Kabete Rd
39:35
Ngutu the widow, Nyabohanse's TOP bachelor.@iammarwa
1:30
Iam_Marwa Fans
Рет қаралды 894
BBS MALL EASTLEIGH   NAIROBI//IT LOOKS LIKE DUBAI
7:16
Audree Bree
Рет қаралды 2 М.
Comparison Between Nairobi And Dar Es Salaam
16:14
Architect Russell
Рет қаралды 42 М.
EXCLUSIVE TOUR OF TATU CITY  in 2024 (Part 1-Industrial Park)
22:59
Dolphine 254
Рет қаралды 61 М.
Yamaha R1M Run from Ruiru to Nairobi 🚀💨"
15:29
ACID BOY KENYA
Рет қаралды 49 М.
Nairobi to Namanga Tanzania & TLV Rooftop Lounge Road Trip
7:41
How Many Balloons Does It Take To Fly?
00:18
MrBeast
Рет қаралды 168 МЛН