Once the project was completed in 1995, the total cost for the Metro Subway was $1.392 billion.
The current system is 15.4 mi (24.8 km) long, including 6.2 mi (10 km) underground, 2.2 mi (3.5 km) elevated, and 7.0 mi (11.3 km) at grade level (with roadways separated). Eight of its 14 stations are underground, at depths of 52 ft (16 m) to 112 ft (34 m) below street level. Its elevated stations stand from 25 ft (7.6 m) to 28 ft (8.5 m) above ground.
When the system started operation, it became the largest single user of Susan B. Anthony dollar coins.
On February 11, 2018, the MTA announced a month-long closure of the entire subway system to complete emergency track repairs identified during a safety inspection. An aboveground portion of the system had already been shut down due to emergency inspections and repairs. The system reopened on March 9 ~Wikipedia
-