Рет қаралды 60,072
In this video, I give an overview of the Phase 2 extension of the Bay Area Rapid Transit to Silicon Valley. The extension will add 6 miles of track and 4 stations to BART system and finally bring BART service to San Jose, California.
SCVTA route flyover video: vimeo.com/4909...
BARTFanSMA video of BART at Millbrae: • San Francisco/Richmond...
TrainSF Video of the UP at San Mateo: • Railfanning San Mateo ...
Welwyn22 Video of the UP at Diridon: • Caltrain, Amtrak and U...
WSDOT Alaskan Way Viaduct Replacement Playlist: • Alaskan Way Viaduct/SR...
Music: • Vaporwave Chill [Full ...
LA Metro Purple Line: • LA Metro PURPLE LINE (...
California HSR: • California HSR 2020
Caltrain: • Caltrain Electrificati...
Thanks a lot for watching. If you want to see more of these updates, feel free to subscribe!
Contact:
Email: thefourfoot8@gmail.com
Twitter: @TheFourFoot
Instagram: @TheFourFoot
Patreon: www.patreon.co...
#BART #SiliconValley #Extension
3,683