Рет қаралды 14,117
In this educational video, Mountain Crane goes over the tilt-up construction process and the steps used from start to finish.
Concrete walls are framed and poured on a slab at ground level then tilted into place with a crane. The panels are braced in place until the remaining structural components such as the remaining panels, roofing and floors are secured in place.
Tilt-up construction jobs are quicker and can follow a more accelerated schedule. It's also cost-effective as it uses locally source material. Tilt-up construction is also safe since most of the work is done at ground level.
To learn more go to mountaincrane.com or our free crane training site: crane101.mountaincrane.com where we go over other crane-related learning.
www.mountaincrane.com