TNPSC Field Surveyor - Chaining on Sloping Ground

  Рет қаралды 1,331

Civil Engineering

Civil Engineering

Күн бұрын

Пікірлер: 18
@mahimahi4763
@mahimahi4763 2 жыл бұрын
Romba romba thanks mam exam romba esaya irunthuchu neraya question nenga nadathunathula irunthu vanthu thank u so much
@CivilEngineeringintamil
@CivilEngineeringintamil 2 жыл бұрын
Super. Thank you.
@ரௌத்திரம்பழகு-ய8ல
@ரௌத்திரம்பழகு-ய8ல 2 жыл бұрын
Mam chain, compass, plane table, theodolite, tacheometry, levelling ithu ellam exam ku prepare pannuravunga mudichirupanga. So padikapora topic ah class edutha ennum usefull ahh irukum mam. Thanks for your classes mam. Unit10 : Building and Drainage Unit9 : CADD Unit8 : Morden Surveying Instruments
@CivilEngineeringintamil
@CivilEngineeringintamil 2 жыл бұрын
Sure, I will try. Thanks🙏
@bhuvanakumar1836
@bhuvanakumar1836 2 жыл бұрын
kzbin.info/www/bejne/ooi8iIqErquhnpo watch this channel for surveyor free classes and test batch
@rajeshchezhiyan7535
@rajeshchezhiyan7535 2 жыл бұрын
Plane table unit podunga mam
@CivilEngineeringintamil
@CivilEngineeringintamil 2 жыл бұрын
Sure. Thanks
@tamilselvans296
@tamilselvans296 2 жыл бұрын
chaining la innum pending edhavadhu irukka .. or all have completed ah akka
@CivilEngineeringintamil
@CivilEngineeringintamil 2 жыл бұрын
innum 4 topics eruku.
@tamilselvans296
@tamilselvans296 2 жыл бұрын
@@CivilEngineeringintamil ok akka
@ivns7619
@ivns7619 2 жыл бұрын
mam direct stepping method onum puriyala madam....
@CivilEngineeringintamil
@CivilEngineeringintamil 2 жыл бұрын
Follower - Hold back end of chain at A Leader - Hold Suitable length (D1) at air above ground at C. Range ACB line Next transfer end if chain to ground using plumb Bob or drop arrow. Repeat the procedure till the end point B
@priyasivakumar803
@priyasivakumar803 2 жыл бұрын
Akka a offset topic la enga irukum
@CivilEngineeringintamil
@CivilEngineeringintamil 2 жыл бұрын
Check the below link for surveyor and Draftsman ITI standard notes. Materials are available in both tamil and english. bharatskills.gov.in/Home/StudyMaterial?var=Fy8JcMKW0Akb4QqA33erJw==&Default=No
@selvarani677
@selvarani677 2 жыл бұрын
a, 0.075m
@CivilEngineeringintamil
@CivilEngineeringintamil 2 жыл бұрын
Super Sister. Your Answer is correct. Thanks for Answering.
@christystanitha903
@christystanitha903 2 жыл бұрын
0.015*5*5*20/100=0.075 m
@CivilEngineeringintamil
@CivilEngineeringintamil 2 жыл бұрын
Excellent. Correct Answer
Field Surveyor TNPSC - Ranging - Previous year Questions
18:20
Civil Engineering
Рет қаралды 1 М.
SLIDE #shortssprintbrasil
0:31
Natan por Aí
Рет қаралды 49 МЛН
🎈🎈🎈😲 #tiktok #shorts
0:28
Byungari 병아리언니
Рет қаралды 4,5 МЛН
Andro, ELMAN, TONI, MONA - Зари (Official Music Video)
2:50
RAAVA MUSIC
Рет қаралды 2 МЛН
Field Surveyor TNPSC -  Principles of Surveying
10:36
Civil Engineering
Рет қаралды 2,3 М.
Field surveyor TNPSC - Chaining - Previous Year Question
22:32
Civil Engineering
Рет қаралды 3,8 М.
Chain surveying in simple form
23:26
The Engineering Surveyor
Рет қаралды 23 М.
Chain surveying on sloping ground part -2
4:44
civil engineering basics
Рет қаралды 1,8 М.
TNPSC Group 2A Mains #tnpscgroup2 #tnpscgroup2amains #tnpsc
22:21
ASAN ACADEMY
Рет қаралды 2,9 М.
SLIDE #shortssprintbrasil
0:31
Natan por Aí
Рет қаралды 49 МЛН