Рет қаралды 1,243
The third and improved rake of Train 18, after completing a 180 Kmph speed trial successfully, was handed over to the Ahmedabad division. Today, the RDSO team conducted a 130 Kmph speed trail on the Ahmedabad-Mumbai-Ahmedabad section. Post getting a successful certificate, this train will be inaugurated between Ahmedabad and Mumbai. This video showcases the up-and-down speed trial. Do like and share this video if you like it. Special thanks to railfan Virag Mhatre for taking video from my pocket 2.
Summary of Speed trials ADI -MCT-ADI of VB rake on 09-Sep-22.
Ahmedabad-Mumbai: ADI departure at 07:06 and MCT arrival at 12:16. 492 Km in 5:10. Also, after starting at 07:06, owing to an instrumentation issue, the train stopped & resumed at 07:25. So if the above, 19 mins are shaved-off, ADI-MCT was done in 4 hrs. 51 mins.
Mumbai -Ahmedabad: MCT departure at 13:10 and ADI arrival at 17:55. 492 Km was in 4 hrs. 45 mins. The running time between ADI-MCT of 5 hrs. was also achieved. During testing, the rake achieved 100 Kmph speed in 52 seconds beating bullet trains which take 54.6 seconds.