Turnaround: Spring cleaning at the Schwechat Refinery 2016

  Рет қаралды 22,993

OMV

OMV

Күн бұрын

OMV Blog: blog.omv.com/en...
The Schwechat Refinery turned 58 in April, making it a plant in the prime of its life. It goes without saying that regular medical check-ups are always a good idea; for refineries a so-called “turnaround” is mandatory once every six years. It also has enormous dimensions: 3,180 people joined in to dismantle, clean, maintain, repair and then rebuild it all back together in the end.
In the past people used to refer to the inspection weeks as a standstill, but this term doesn’t quite seem to fit when you look at today’s agenda: In these four weeks more than 306 tonnes of steel will be processed and inspections carried out on 480 heat exchangers, 16 furnaces, 510 containers and 2,677 valves, in addition to replacing more than 12,6 kilometers of pipes. The greatest challenge this time around is on the distillation plant.
One down, one to go - and so the preparations for the next round are already underway in the Schwechat Refinery. After all, only half of the refinery was inspected this year, namely the part that is responsible for producing fuels - the petrochemicals units will follow in 2017.
--- Note: As of June 13, 2017 Petrol Ofisi A.S. is no longer part of OMV Group.
------------------------------------------------------------
Subscribe to the OMV KZbin Channel: / omv
Follow our Blog: blog.omv.com
Follow us on LinkedIn: / omv
Follow us on Twitter: / omv
Follow us on XING: www.xing.com/co...
Follow us on Facebook: www.omv.com/por...

Пікірлер: 8
@purnimakashyap3129
@purnimakashyap3129 Жыл бұрын
EOT cranes and hoists are a big surprises in Turnarounds. Many are not (or cannot be) operated during the regular plant operation and when required after 5-7years of inoperation.. are discovered just konked off...(broken or siezed).... Best way is to -have an audit and rehearsal of all the hoists..(atleast 6months to 1 years in advance) - greasing & minimum operation (required to keep healthy) -keep all the spares for 1- minimum 2- maximum overhaul
@flailios
@flailios 6 жыл бұрын
What a high-paced shut!
@Faizu-pb3te
@Faizu-pb3te 3 жыл бұрын
Plz provide English captions
@omv
@omv 3 жыл бұрын
Hello, thank you for your comment. The text in the video all have English subtitles.
@abdusameaksheer2124
@abdusameaksheer2124 3 жыл бұрын
@@omv contractors name pls
@mckessa17
@mckessa17 Жыл бұрын
Canada has very few refineries left, they closed most of them.
Process Piping Inspection for Refining and Chemical Facilities
5:14
QuestIntegrityGrp
Рет қаралды 11 М.
ESSAR CAT CRACKER TURNAROUND EVENT 2013
13:43
Essar Oil Uk
Рет қаралды 18 М.
BP Texas City Refinery Explosion 2005 | Animation
6:15
HSE Insider
Рет қаралды 10 М.
Furnace Tube Inspection System - FTIS™
4:51
QuestIntegrityGrp
Рет қаралды 31 М.
Pentagon declassified data on Russia
12:05
NEXTA Live
Рет қаралды 259 М.
The Turnaround story of Vadinar Refinery
3:49
Essar
Рет қаралды 20 М.
FCCU
25:46
Harikrishnan P
Рет қаралды 73 М.
Graham Corporation - Ejector Efficient Operation
6:52
Graham Corporation
Рет қаралды 474 М.