Рет қаралды 3,185
USS Toledo (SSN 769) entered Dry Dock 2 at Norfolk Naval Shipyard (NNSY) May 1. The Los Angeles-class submarine arrived at NNSY Jan. 21 for an Engineered Overhaul which requires approximately 437,000 workdays to replace, repair, and overhaul components throughout the boat. Toledo remained pierside for an extended period due to Dry Dock 2 undergoing maintenance upgrades to its caisson, flood wall, and piping.
We are the #ForceBehindTheFleet! We are #AmericasShipyard!
#OneMissionOneTeam #WeGotThis
Video by Alim Jordan, Videographer with the Shipyard Audio Visual Production Office, Code 1170.
******
Follow Norfolk Naval Shipyard on Social Media
Facebook- / norfolknaval...
Twitter- /
Instagram - / norfolknava...
Issuu- www.issuu.com/nnsy/
LinkedIn - / norf...
Website- www.navsea.navy.mil/Home/Ship...
Command Home Page - www.navy.mil/local/nnsy/
KZbin- kzbin.info
Slideshare- www.slideshare.net/NNSY/