Рет қаралды 2,405,171
This is the final stages of pumping, we had to pump a smaller holding area over a berm into the forebay so the 10" could suck it out. The crazy wind sounds are from the 60-80km/h winds we had that day! It was so crazy at one point we both got blown across the pond by the wind.