Рет қаралды 82,148
Wet Stony Hill Road Construction JCB Backhoe Loader.
In the presented video of jcb backhoe loader, the jcb backhoe loader operator is making a new hilly road by cutting hill and digging out huge rocks from the hill. The jcb backhoe loader operator was distracted by the rocks and stones in the hill so the operator had to dig them out as the operator is digging and cutting hill because it may result in serious damage to the machine and its part.
The jcb backhoe loader operator was cutting hill for new hilly road and suddenly a lot of groundwater started coming up as the jcb backhoe loader operator was working which made the hilly road track wet. After some time the jcb backhoe loader operator had to move a little and it couldn't because the soil got so wet that it was like a muddy pond or something like that so the jcb got stuck. Hardly the jcb backhoe loader operator managed to get out of such a situation thanks to his skills and experience.
The presented video shows the skills and stunts of jcb backhoe loader operator from which jcb backhoe loader learners can learn jcb backhoe loader skills and stunts easily or learn jcb dozer skills and stunts easily.