The objective of the Factory Acceptance Test (FAT) is to verify that the system is set up correctly and will operate as expected from both the hardware and configuration software point of view before it ships to the site.
The objective of the Site Acceptance Test (SAT) is to validate that the control and safety systems are fully operational in accordance with their functional specifications prior to using them to operate the processing unit.