Timeline: - a). 00:55 : - Introduction of excess demand penalty b). 01:38 : - Proposed by distribution companies (NBPDCL & SBPDCL) c). 02:42 : - Approved by the regulatory commission (BERC) d). 03:55 : - Pre-information to the consumers about the tariff change e). For updated suvidha app: - kzbin.info/www/bejne/jaXWaX6ki96ebKM f). 05:43 : - Expert advice regarding load enhancement (Why to choose 4 kW) g). 08:38 : - Security deposit and charges related to load enhancement
@AbhishekKumar-dh3zt3 жыл бұрын
Jj
@shaktikumar25813 жыл бұрын
घर ke bijli bill me dukan भी add karba सकते h
@Arushfundamentals3 жыл бұрын
Kis jagah ka connection hai?
@shaktikumar25813 жыл бұрын
@@Arushfundamentals bihar (patna)
@Arushfundamentals3 жыл бұрын
Nahi, Bihar me ghar aur dukan ka alag alag connection lena padega.
@RajeevKumar-vq9zt4 жыл бұрын
well explained and very helpful. Thank you very much. Pls continue your good work for general public
@Arushfundamentals4 жыл бұрын
Thank you.
@academyofcommerce19434 жыл бұрын
Again a great job Bahut confusion hai logo me Literally they are abusing co. Staff. Hope this will help. Good wishes for you 🌱
@Arushfundamentals4 жыл бұрын
Thanks a lot.
@fatehram41922 жыл бұрын
अति उत्तम रचना भाई
@Arushfundamentals2 жыл бұрын
धन्यवाद
@swapnilthali90412 жыл бұрын
Bohot badhiya.
@Arushfundamentals2 жыл бұрын
Thanks
@virendrasinghuikey60582 жыл бұрын
Mera ghar ka.0.77kw h aur metre reading 250 ka aa rha h load badhne ke liye penality lgega lgbg kitna penality lgega aur load kitna badhna chaiye urban area domestic purpose ke liye
@TAKLU_BACCHA2 жыл бұрын
नाइस वीडियो 🙏
@nifty_banknifty_trader3 жыл бұрын
Sir advanced consumption charges kya hai
@shahnawazkhan19503 жыл бұрын
Sir mai Patna se ho or mera smart meter lag h bill buht aa raha h 2kw ka meter h to kya kar chahiye 4ya 5 din mai 500 hundred ka recharge karna padta hai kya Karen Khush solution de please ?
@alokanand29114 жыл бұрын
Too good that help too much
@Arushfundamentals4 жыл бұрын
Thanks a lot.
@PANKAJKUMAR-yv9ti4 жыл бұрын
Nice Video
@amankhatri97043 жыл бұрын
sir mere yaha vse to ac fridge washing machine sab hai aaj kal vo log bht chalaan karne pe nikle hue hai ac lage hue saal bhar ho gya to unke agar mere ghar aake chalaan karne se phle me office jake apna load badva lunga to mere office me to mere khilaf case ya chalaan to nhi banega na aur kya load 2 se 3 karane me bill bhi jada aaega pls reply pls sir im from mp
@Arushfundamentals3 жыл бұрын
Yes, aap pahle hi office se load badha lijiye.
@ayushkumar854 жыл бұрын
Is there any electrical equipment which can take the electricity from 2 phase and simultaneously pass the electricity to 2 electricity meter and further both the phase is passed through 1 stabilizer in the same house .. purpose is to lower the electricity cost .. but the problem is that if the electricity is cut in any of the 2 phase the stabilizer will pull electricity from 1 phase passing through 1 meter (extra cost will occur as passed electricity in that phase is half the house requires) .. So could you please tell me of the equipment that will take the electricity from 2 phase and if electricity is cut in any of the 2 phase the equipment will pull the electricity from 1 phase but pass it to 2 electricity meter in the house?????
@Arushfundamentals4 жыл бұрын
According to Indian electricity act and distribution supply codes of different states, only three phase and single phase connections are allowed with separate three and single phase meter respectively. Further, output of any two meters shouldn't interface with each other and should not supply any common electrical load.
@rajbardhansingh50514 жыл бұрын
Very helpful..
@Rehanz_p9t Жыл бұрын
Hello sir mai Lucknow se hu or mere ghar me 1 kw ka meter laga h or mai. 1.5 ton ka a.c or ghar me jo bhi zaruri home appliances hote h refrigerator Washing machine etc use hote h to mai kitne kw tak ka meter lagau kyuki electricity bil bht zada ata h plz rply
@Arushfundamentals Жыл бұрын
कम से कम 3 kW का
@sourabhmazumder86104 жыл бұрын
In Assam the maximum limit for Single Phase connection is 4.99kW. Is there any problem if I opt for 4.99kW or 4.95kw? I am ready to bear the fixed charges i.e ₹50 (50×5=₹250), thats not a problem. Any other problems?
@sumitraj53008 ай бұрын
Sir mera bpl connection hai, usmein ham load badhana chahte Hain kaise hoga suvidha app se nahin hota hai, smart metre mein bahut jyada bil banaa deta hai
@Arushfundamentals8 ай бұрын
लोड बढ़ाने पर category change होगा और आप APL में आ जाएंगे। बिजली ऑफिस से कराना होगा।
@rohitpandey3234 Жыл бұрын
Mishra ji namaskar mera 7.5hp ka motor kitne kw ka connection lena chahiye plz bataye
@Arushfundamentals Жыл бұрын
6 kW
@alokanand29114 жыл бұрын
Too good
@rahulroy18082 жыл бұрын
Mera currently 1 kw connection hai bihar me, smart prepaid meter, excess demand 1.06 ka aa rha hai garmi me aur kabhi nhi aata hai, mujhe load kitna increase karna chaiye
@Arushfundamentals2 жыл бұрын
1 kW और बढ़ा लीजिए।
@veerchhatarashal43574 жыл бұрын
Good job brother
@Arushfundamentals4 жыл бұрын
Thank you so much 😀
@neyazahmad67853 жыл бұрын
Sir meter defect hai aur billing 2 sal se MD pr hi ban rha h rural area me...meter change karwana jaruri hai kya?
@Arushfundamentals3 жыл бұрын
Han karwa lijiye. Bahut jaroori hai.
@sarkaricafe Жыл бұрын
Pay kab karna hota hai load ka kyuki app se load badhate waqt to nhi manga
@Arushfundamentals Жыл бұрын
Next बिल में चार्ज होगा।
@RajendraAheer11 ай бұрын
Sir mera bricks ka kaam h abhi mere. Pass 5 kg ka single phase transformer h muje load 10 se 15 krvana h ab kya krna hoga
@Arushfundamentals11 ай бұрын
किस जगह का बिजली कनेक्शन है?
@RajendraAheer11 ай бұрын
@@Arushfundamentals Rajsamand Rajasthan
@RajendraAheer11 ай бұрын
Btao na sir
@gursharansingh29113 жыл бұрын
Sir m punjab se ho mann lo m 4kw kar leta ho lodd or mara 2 munth ke bil me koe vi unet nahe h to mara ketna bill Ae ga
@sunilsrivastava81293 жыл бұрын
अगर मैं single phase से 3 phase करता हूं तो क्या मेरे बिजली के बिल में भी कोई अंतर आएगा जो यूनिट चार्ज अभी लग रहा है क्या वही यूनिट चार्ज 3 phase के बाद लगेगा।
@Arushfundamentals3 жыл бұрын
Electricity unit rate me koi antar nahi aayega.
@Satishkumar-o6s2u Жыл бұрын
What is the max limit in single phase connection
@Arushfundamentals Жыл бұрын
7 kW in Bihar.
@deepankaryadav5473 жыл бұрын
Sir mere 2 kw load ha,jisma 1.5 ton spliit ac ,1 ton ac,washing machine,mixer grinder,ro,5 light 4 fan ??Kya mujha badvana hoga load
@Arushfundamentals3 жыл бұрын
Han. Total 4 kW karwa lijiye
@deepankaryadav5473 жыл бұрын
@@Arushfundamentals thank you
@viveksinghrajput17102 жыл бұрын
Load increase krwana better option h Ya alg 1.5 ton ac ka alg s 2 kwh ka metre le lu
@Arushfundamentals2 жыл бұрын
Load increase करवाना बेहतर है।
@rajgupta-gd8je9 ай бұрын
Can i inhance my electricity load from 2 kilowatt to 55 kilowatt.
@Arushfundamentals9 ай бұрын
Yes. It's possible. The department would check the infrastructure status and will act accordingly.
@lovemix36452 жыл бұрын
Sbpdcl me abhi 1phase wala 3kw or 4kw ka fixed charge daily kitna hai?
@Arushfundamentals2 жыл бұрын
घरेलू कनेक्शन का Rs 40 प्रति kW है।
@AbhishekRaj-ho3mk2 жыл бұрын
@@Arushfundamentals mera connection 3kw hai pr 136rs charges ho rha h fixed charge kyo??
@Arushfundamentals2 жыл бұрын
34 दिनों का बिल बना होगा।
@AbhishekRaj-ho3mk2 жыл бұрын
@@Arushfundamentals ooo i didnt notice that yes billing days is 34
@AbhishekRaj-ho3mk2 жыл бұрын
@@Arushfundamentals mere name pe ek domestic connection already h dushra domestic connection hm le skte h kya??
@nagendralal11992 жыл бұрын
I had applied to enhance load from 1 kw to 2kw,which has been approved by the executive engineer ,nbpdcl,supaul, bihar has approved in the system.now there it is mentioned to deposit 89.00rs as application fee.how I can deposit ,I have prepaid smart meter.
@Arushfundamentals2 жыл бұрын
Just recharge your prepaid meter.
@dhamalmusicalgroup58952 жыл бұрын
स्मार्ट मीटर का जो एप्लीकेशन है उसमें लोड कैसे बढ़ा सकते हैं
@Arushfundamentals2 жыл бұрын
सुविधा App से load बढ़ाएं।
@nagendralal11992 жыл бұрын
Sir ,Please clarify. My online request to enhance the load from 1kv to 2kv by the executive engineer, nbpdcl,supaul, bihar.you replied to recharge the prepaid meter for payment of application fee of rs 89.00.my querry is if i have sufficient balance in smart meter prepaid balance, will they deduct this amount from my balance or I will have to deposit the amount of 89.00 rs separately either online or cash in their office. Thanks,nagendra Kumar lal
@Arushfundamentals2 жыл бұрын
The amount bill be added in the monthly billing as "other charge". It may be different amount because in other charge rebate will also be added. You needn't to do any thing. Just wait for the next monthly bill after this adjustment will be given in credit/ debit/ deferment section.
@SabaNaaz11039 ай бұрын
Sir mera new smart prepaid meter lga hai (Bihar) Message aya tha k apna load badhayiye Toh maine 2 se 4 apply kr dya suvidha app se. Aur approve ho gya. Phle fixed charges 5rs per day tha. Par ab 10rs per day ho gya. Kya yeh 10rs per day hamesha katega ?
@Arushfundamentals9 ай бұрын
हाँ
@vakilahmed41653 жыл бұрын
🙏 नमस्कार सर 🙏 मे दिल्ली में रहता हूं मेरा एनडीपीएल कनेक्शन है कमर्शियल एक किलो वाट का मेरे बिल में ADJUSTMENTS = rs 7760 जुड़ कर आ गए हैं इने केसे हटवाए एनडीपील से please reply me 🙏🙏
@6254nicu4 жыл бұрын
1kw se 4kw karwane par security money kitna lagega bihar me,reply soon
@Arushfundamentals4 жыл бұрын
Kindly watch at 8:40 minute of the video for the amount.
@dkvlogs41523 жыл бұрын
In UPPCL fixed charge is 90 rs for rural in 1Kw connection.
@Arushfundamentals3 жыл бұрын
In this video, I have taken the example of Bihar.
@ShubhamSahu-wz1bm3 жыл бұрын
Sir up me gaanv ka fix charge kitna hota hai
@Arushfundamentals3 жыл бұрын
Lifeline consumer ka Rs 50 per month other ka Rs 90 per kW per month.
@dkvlogs41523 жыл бұрын
@@ShubhamSahu-wz1bm mere yaha 90 rs fixed charge
@Arushfundamentals3 жыл бұрын
Lifeline ke liye 1 kW load and maximum 50 unit per month hi allow hai. Isse jyada hone per rural area me Rs 90 per kW per month hi lagega.
@runway4comedy2 жыл бұрын
Sir अगर हमने Main लाइन पर 5 किलो वाट का स्टेबलाइजर लगाया है और हमारे घर का का लोड 2 किलो वाट है तो क्या अब यह लोड 5 + 2 =7 मीटर पर Show होगा क्या अब हम पर विद्युत विभाग की ओर से पेनल्टी लगेगा जब कि हमने मीटर 3 किलो वाट का लगवाया हुआ है Please Reply
@Arushfundamentals2 жыл бұрын
Stabilizer मीटर पर कुछ ज्यादा load नहीं देता है।
@mondaltechnology90612 жыл бұрын
सर एक बात बताइए अगर हम मीटर परचेस कर लेते हैं तो उसका कितना चार्ज लगेगा क्योंकि मीटर का रेंट हर महीने ₹30 करके लगता हैं
@Arushfundamentals2 жыл бұрын
बिहार में मीटर rent नहीं लगता है, ये fix charge है।
@jyotiverma68422 жыл бұрын
Sir mne kuch din phle ac lagwaya h..2 kilo watt ka meter laga h ..4 kg ke liye application di h ..waha unhone 2000 rupay le liye h..sahi hua kya ??
@Arushfundamentals2 жыл бұрын
बिहार का है क्या?
@jyotiverma68422 жыл бұрын
@@Arushfundamentals no sir ji m up se hu. .
@rakesh.bestdrverma79823 жыл бұрын
Thank sir
@Arushfundamentals3 жыл бұрын
Welcome
@travelfreak064 жыл бұрын
2 kw se 3kw kie to kitna parega. Sbpdcl mai
@Arushfundamentals4 жыл бұрын
DSIID category me Rs 2488.50 - Previously deposited Security amount.
@shahidkaleem9024 жыл бұрын
Lekin maine jab 1 se 4 KW badhaya to mujhse ek bhi rupiya nhi lia office me NBPDCL me, lekin aap keh rhe hai paisa lagega. Mai confuse hu please reply
@Arushfundamentals4 жыл бұрын
1 January se New connection, load enhancement me application fee, security amount etc ab first bill/ next bill me hi jodkar aata hai.
@okokk7963 жыл бұрын
I have 2kw Load And Home load 1hp moter Washing machine Tv led 43 inch 4 fan celling 19 bulb 10 Watt Ac 1.5 ton Mixer grinder RO water purifier Mujhe load enhancement karna chahiye ya nahi abhi 2kw h
@Arushfundamentals3 жыл бұрын
Considering heavy load like AC and motor, please enhance your load from 2 kW to 4 kW.
@okokk7963 жыл бұрын
@@Arushfundamentals thanks 😊😊😊
@sonukumarchoudhary27722 жыл бұрын
@@Arushfundamentals my home load 1 hp moter 1 tv simple TV 13 fan hai 15 buld hai led 9watt wala Mujhe load increase karana chahiye ki nhi abhi mere miter ka load 1kw h
@Arushfundamentals2 жыл бұрын
1 kW sufficient है।
@sonukumarchoudhary27722 жыл бұрын
@@Arushfundamentals to sir mere electronic miter se jo wire MCB me connect kiya hai wo bar bar jal jata hai kyu electrician se dikhaya to wo bol rhe hai load ki wajah se yesa ho rha hai
@praveenkumarvlogs62884 жыл бұрын
1 kilowatt kitne units jala sakte hain
@Arushfundamentals4 жыл бұрын
यूनिट का कोई लिमिट नहीं है। बस आपका एवरेज लोड किसी भी आधे घंटे के पीरियड में 1 किलोवाट रहना चाहिए।
@Arushfundamentals4 жыл бұрын
किसी भी महीने में आधे घंटे का एवरेज मैक्सिमम लोड आपके सैंक्शन लोड से ज्यादा (5% से ज्यादा) होने पर बिल में एक्सेस डिमांड पेनेल्टी लग सकती है।
@abhishekpandit36893 жыл бұрын
Sir mera BPL ka connection tha par ab load 2kw badha diya or penalty vi lagane ko bola h to kitna bill aa sakta h please bataye
@Arushfundamentals3 жыл бұрын
Agar aap apna load badha liye aur maximum demand 2 kW ya usse kam rahega to penalty kyaun lagega.
@abhishekpandit36893 жыл бұрын
@@Arushfundamentals sir maine cyber chalate h eske liye penalty lagane ko bol rha tha
@abhishekpandit36893 жыл бұрын
@@Arushfundamentals sir mera BPL ka connection tha but jee aya or load 2kw badhaya or mai computer chalata hu to eske liye penalty lagane ko bola ye penalty kitna ho sakta h mera Bill 381rupees tha please bataye
@Arushfundamentals3 жыл бұрын
Bina inspection under 126 ke penalty alag se koi nahi laga sakta. Load bhi ab Suvidha app se hi apply kar badhta hai.
@abhishekpandit36893 жыл бұрын
@@Arushfundamentals sir jee aya tha mera connection bpl ka h or mai computer ka shop vi chalata hu usne 2kw load badha diya or penalty vi laga diya mera Bill 380 rupees dues tha to ab penalty k sath kitna bill a sakta h maximum please bataye
@kundankumar-ig4bk4 жыл бұрын
Sir सुविधा app se 3kwh load बढ़ाने पर, सिक्योरिटी money ek hi month me आएगा या installment me
@Arushfundamentals4 жыл бұрын
Ek hi month me, next bill ke sath.
@Arushfundamentals2 жыл бұрын
Smart मीटर में सिर्फ़ 88.5 रुपये। सामान्य मीटर में अतिरिक्त सिक्युरिटी amount भी लगेगा।
@Arushfundamentals2 жыл бұрын
हाँ, बिल में ही charge होगा।
@Arushfundamentals2 жыл бұрын
30 minutes का average load md hota hai. Bill में excess demand पेनल्टी लगेगा। For MD: - kzbin.info/www/bejne/f5Kag2mso8pnb9E
@kulveermann93974 жыл бұрын
Punjab me app nhi chal rha
@Arushfundamentals4 жыл бұрын
Ye app Bihar ke electricity consumers ke liye hai. Agar aapka Bihar me koi connection hai to aap Suvidha app use kar sakte hain.
@vimalkumarchitranjankumar80044 жыл бұрын
Subh dha apps see load badhane par dusra bill mai bhi sem load hai 1kv
@Arushfundamentals4 жыл бұрын
Might be in process. Sub division office me sampark kijiye.
@yaduvanshiamarjeet97634 жыл бұрын
Sbosha app se load घटने और बढ़ाने के ऊपर क्लिक करने से service unebaldikha rha hai
@Arushfundamentals4 жыл бұрын
सुविधा एप से लोड बढ़ाने - घटाने बनाने का वीडियो देखने के लिए नीचे क्लिक करें। kzbin.info/www/bejne/jaXWaX6ki96ebKM
@Arushfundamentals4 жыл бұрын
प्लेस्टोर से सुविधा ऐप डाउनलोड करने के लिए नीचे क्लिक करें play.google.com/store/apps/details?id=bsphcl.suvidha.org
@sumeetkalwani58283 жыл бұрын
Agar meri factory me sanctioned load 23kw hai par mera maximum demand 9kw aata hai har baar .. Par actually me mera poora machine ka load 30kw hai par maximum demand 9kw hi aata hai ...to kya fine lagega kya ...ya fine bas tab lagta hai jab maximum load .. sanctioned load se jyada ho ?? Please reply
@Arushfundamentals3 жыл бұрын
It depends upon maximum demand. Fine नहीं लगेगा। कहाँ का कनेक्शन है?
@sumeetkalwani58283 жыл бұрын
@@Arushfundamentals madhya pradesh ... Actually mujhe new Machines lena hai factory me .. par me soch raha hu abhi se load increase nahi karwau ..kyuki saari machines ek saath nahi chalegi ... Ek baar ek month ke bill me dekh lu ki maximum demand load kitna aa raha hai ... Agar maximum demand load jyada aaya to fir increase Kara lunga ...abhi se karwaunga to zabardasti deposit dena padega and har month fixed tariff b badega ... To mera ye question hai ki ye legal hai na ki agar suppose aapke pass Jo machines hai uska total load sanctioned load se jyada hai ... Par maximum demand sanctioned load se kam hai ...to ese rakh sakte hai na ..isme koi fine ya penalty to nahi hai ??
@Arushfundamentals3 жыл бұрын
मध्यप्रदेश में industrial connection मांग आधारित है। मीटर के maximum demand के अनुसार और sanctioned load के अनुसार ही बिल बनेगा। आप निश्चित रूप से नया machine रख लीजिए, कोई fine नहीं लगेगा।
@surendrakhatri563 жыл бұрын
राजस्थान में कैशे होगा
@surendrakhatri563 жыл бұрын
9414428629
@ashishkumar41534 жыл бұрын
DS2D me aisa nhi hota hai Ki 75% se kam load rahne par fixed charge 75%ka hi lagega..
@Arushfundamentals4 жыл бұрын
Fixed charge hamesha recorded load ko next higher digit me round off kar ke liye jane ka pravdhan hai. Agar aapka sanction load 4 kW se kam hai to uska 75% nikal kar round off karne par sanction load ke barabar hi ho jata hai. I mean, you would get benefit of 75% minimum billing demand only if your sanctioned load is 4 kW or more and that's why you should choose 4 kW instead of 3 kW.
@nkhan6833 жыл бұрын
2kw se 3 kw load krne me approx bill Kitna badh jata h