No video

Wind Turbine Installation Vessel BLUE AMBER

  Рет қаралды 83,526

Neptun Ship Design GmbH

Neptun Ship Design GmbH

Күн бұрын

The installation of 8MW++ wind turbines further offshore in water depth up to 60 meters is not a dream anymore. Neptun Ship Design offers an innovative solution to wind farm developers, wind turbine manufactures and operators around the world. The Jack-Up vessel “Blue Amber” is specifically designed for the efficient and safe installation of the future generation wind turbines. The DP2-dynamic positioning of the WTIV provides unique capabilities for jacking close to the jacket foundation clearance zone of the offshore installation. The vessel’s efficient energy management system in combination with the clean design notation promises an environmental friendly and sustainable ownership. The 4 leg vessel is able to transport 6 turbine sets, consisting of tower, nacelle and blades. The Installation of one turbine set on a jacket structure will require maximum 5 heavy lifts each. The main crane with SWL 2000To@45m and trolley / tugger arrangement on boom is operated by frequency controlled machinery under deck. Comfort class accommodation is provided for 120 persons. A save crew change is guaranteed via helicopter platform with integrated Jet A1 refueling system. Close development coordination and cooperation with market leaders for the main equipment packages makes it now possible to present you a custom made vessel concept, which is focused on lowering the levelised cost of energy -LCoE-, which is the main target of the offshore wind industry.
www.neptun-germ...

Пікірлер
Building the world's tallest floating turbines
10:03
Mammoet
Рет қаралды 35 М.
A Next-generation Wind Installation Vessel from Maersk Supply Service
4:35
Maersk Supply Service
Рет қаралды 3,5 М.
SPONGEBOB POWER-UPS IN BRAWL STARS!!!
08:35
Brawl Stars
Рет қаралды 21 МЛН
Чёрная ДЫРА 🕳️ | WICSUR #shorts
00:49
Бискас
Рет қаралды 6 МЛН
拉了好大一坨#斗罗大陆#唐三小舞#小丑
00:11
超凡蜘蛛
Рет қаралды 14 МЛН
Why Are Floating Wind Turbines So Huge?
14:36
Undecided with Matt Ferrell
Рет қаралды 1 МЛН
Arcadis Ost Orion
8:05
DEMEGroup
Рет қаралды 27 М.
Crowley-ESVAGT Wind Farm Service Operation Vessel
5:52
Crowley
Рет қаралды 4,7 М.
Galloper offshore wind farm | export cable shore landing * full version
9:31
SAL: MV Svenja, transshipment of monopiles to installation vessel
3:07
SPONGEBOB POWER-UPS IN BRAWL STARS!!!
08:35
Brawl Stars
Рет қаралды 21 МЛН