Рет қаралды 23,896
This video was taken the night before the uploading on KZbin. This is the middle section that I said I'm going to film. Of all videos so far, this is by far the hardest to film because of the number of people riding the elevator. Uncommon, this elevator breaks down every visit here to the mall. Also the night before as soon as I finish filming, 30 minutes later a loud whirring (presumably from the ventilation shaft) has stirred panic here. This as well triggered the fire alarm. By then, as we hurried down to the car park and Mid Valley, there was a crowd around the elevator only then the elevator that I rode earlier broke down. Fortunately, nothing severely happened by the time I left the building. This video also shows the proof that it is Schindler and the functions of that elevator as it is heavily used when full capacity.
Specification:
Model: Tecnoltic Engineering (Fixtures and Model by Schindler)
Type: Hydraulic
Capacity: 1350kg (2976.2Ibs) or 20 persons
Status: Smooth and on occasions breaks down
Floors Served: B1-B4, LG, G, 1, 2, 3, 4, 5A, 5, 6A, 6 (denoted as 6C), 7 (Rooftop Car Park and Locked)
To watch the elevator video only tune to 3:57.