No video

WSP panel..wiring diagram of K05 relay,power supply in Wheel slide protection device, fault codes..

  Рет қаралды 5,773

Rail Bandhu रेल बंधु

Rail Bandhu रेल बंधु

Күн бұрын

During the course of brake application, there are possibilities
of skidding/sliding/locking of individual axle. In these cases
adhesion between the rails & wheels plays vital roll. Above
situations are likely to cause damage to wheel sets with
increased braking distance. The main purpose of using the
WSPs is to utilize the available adhesion. The WSPs provided
in the system avoids wheel sliding, also cuts the maintenance
cost. Speed sensors, the part of the system detect the speed of
the wheel & sends signal to the processor unit.
The processor unit evaluates the received signal from speed
sensor of the vehicle & generates signals enabling the dump
valve/antiskid valves to control the brake cylinder pressure in
case of any locking/skidding. The control on the brake cylinder
pressure is instantaneous to the wheel to rail adhesion, keeping
the wheels within their optimum range of skidding.
The WSP has some of the major parts.
1. Speed Sensor.
2. Phonic wheel.
3. Microprocessor.
4. Dump valves.
5. Pressure switch.
Microprocessor:
Microprocessor is the heart of the WSP system. This gathers
the signals from phonic wheel & speed sensors, evaluates the
vehicle speed. Moreover, during brake application, it monitors
& bridges the sharp drop of speed of a particular axle/wheel,
enabling the dump valve to control/adjust the brake cylinder
pressure.

Пікірлер: 4
@littlekitchenmasterswaadka9603
@littlekitchenmasterswaadka9603 Жыл бұрын
Very informative video. Nicely explained the😀
@dltsicklinetanwar9388
@dltsicklinetanwar9388 Жыл бұрын
Glad you liked it
@vikasshukla5902
@vikasshukla5902 10 ай бұрын
How can we detect k05 is faulty
@dltsicklinetanwar9388
@dltsicklinetanwar9388 10 ай бұрын
Sir, k05 has four connection points as shown in figure also A1,A2,15&18 When A1 &A2 get supply through a pressure switch, switch activated and connect 15 no. supply to no.18, Now we have to check supply availablity by multimeter May be connection problem sometimes Sometimes we bypass k05 switch wago no 44 (to 42 if pr switch ok) as shown in figure
Survive 100 Days In Nuclear Bunker, Win $500,000
32:21
MrBeast
Рет қаралды 161 МЛН
Они так быстро убрались!
01:00
Аришнев
Рет қаралды 3,1 МЛН
Pool Bed Prank By My Grandpa 😂 #funny
00:47
SKITS
Рет қаралды 19 МЛН
Faiveley new version WSP testing AEF G2
4:32
INFO YPR
Рет қаралды 18 М.
Schedule D2 of LHB coach Indian railways
7:34
रेलवे की जानकारी
Рет қаралды 6 М.
SPEED SENSOR FAULT CORRECTION (WSP) : LHB - COACH
5:05
MODERN RAIL TECHNOLOGY INDIAN RAILWAYS
Рет қаралды 5 М.
WIRING MODIFICATION IN NEW FAIVELEY WSP SYSTEM
2:16
COACHING DEPOT TVC
Рет қаралды 7 М.
Knorr company fault code attend l 7201-0101-4101-4201 l fault code attend
6:15
Survive 100 Days In Nuclear Bunker, Win $500,000
32:21
MrBeast
Рет қаралды 161 МЛН