PTC Mathcad - Included Worksheet
4:19
PTC Mathcad - Linear Regression
5:21
PTC Mathcad - Protected Areas
4:54
PTC Mathcad - Internal Hyperlinks
3:58
PTC Mathcad Prime 9 - Text Styles
6:53
PM  Controlling
20:20
Жыл бұрын
Project Schedule Crashing
20:22
Жыл бұрын
Goldratt's Critical Chain in PM
16:36
PM Resource Levelling
23:24
Жыл бұрын
Cost of Learning
11:52
Жыл бұрын
Decision Trees for Risk Management
10:23
Scenario Analysis
6:50
Жыл бұрын
Net Present Value (NPV)
10:07
Жыл бұрын
Internal Rate of Return (IRR)
8:03
Sensitivity Analysis
14:56
Жыл бұрын
Decision Matrices
22:02
Жыл бұрын
3 Point Cost Estimates and PERT
7:56
Payback Period Video
11:36
Жыл бұрын
The Critical Path Method
26:58
Жыл бұрын
Пікірлер
@vikasbhat6077
@vikasbhat6077 2 күн бұрын
Thanks for brilliant videos for MPP. Please share the link for EVM theory.
@PatJHeffernan
@PatJHeffernan Күн бұрын
@@vikasbhat6077 Here is the link to the tutorial on the fundamentals of Earned Value: kzbin.info/www/bejne/jIKmnZ-HrMSLm8U
@vikasbhat6077
@vikasbhat6077 Күн бұрын
@@PatJHeffernan Great thankyou.
@aeinxing6508
@aeinxing6508 6 күн бұрын
hi pat, would you please reset the links again, very much appreciate it, I couldn't access into link, it doesn't work...
@PatJHeffernan
@PatJHeffernan 5 күн бұрын
I've had challenges with the link. Try this: drive.google.com/file/d/1nVez6GlXBffNjn4W6K2KiAEnqO5NHckX/view?usp=sharing It isn't the most up to date but covers off most. If it works, let me know and I'll scoot through the various videos updating it.
@aeinxing6508
@aeinxing6508 5 күн бұрын
@@PatJHeffernan Thank you so much !!! I do deeply learn a lot from your videos, wish more and more people give thumbs up and like your video😃
@aeinxing6508
@aeinxing6508 5 күн бұрын
I am SYD residential structural engineer and this is definitely a great new tools for my daily work 😁
@PatJHeffernan
@PatJHeffernan 5 күн бұрын
@@aeinxing6508 I recently moved to CBR
@PatJHeffernan
@PatJHeffernan 5 күн бұрын
@@aeinxing6508 Thanks, I’m glad you find them useful!
@DavidKonyndyk
@DavidKonyndyk 10 күн бұрын
Ok, so how do you use a symbol like sigma in a function without mathcad treating it as a constant? I'm just trying to plot the gaussian distribution using the greek letter sigma, and mathcad turns it green and assumes it's the Boltzmann constant with units in W⋅m−2⋅K−4. How do I make the green turn to black?
@PatJHeffernan
@PatJHeffernan 10 күн бұрын
@@DavidKonyndyk Try going up to the menus and, with the sigma selected, setting is back to “variable”.
@DavidKonyndyk
@DavidKonyndyk 10 күн бұрын
@@PatJHeffernan I'm trying that now, using the label styles as in your video "PTC Mathcad - Label Styles" It overrides me every time and keeps sigma as a constant. if I type 5σ=, it tells me 2.835x10^-7 kg/s^-3K-4. If I change σ to a variable and hit enter, the answer should be a question mark and a red circle should appear around σ telling me my variable has not been defined. Instead it goes back to green and assumes Boltzmann's constant. This is silly because there are multiple other common uses for the Greek letter σ. So why choose one in the software? And if it's to be a constant, then why is not not in the constants dropdown instead of symbols? There needs to be a global assignment options box for each worksheet where you specify these types of things for the entire sheet.
@PatJHeffernan
@PatJHeffernan 10 күн бұрын
@@DavidKonyndyk I’m not sure what to say… I am able to manage sigmas label and shift it between constant and variable without issue (I just pulled out the computer to check).
@PatJHeffernan
@PatJHeffernan 10 күн бұрын
@@DavidKonyndyk As for the constants drop down box, it only has the most common ones listed as there are too many constants to list there. Once a symbol is designated as a variable or constant, it should maintain its definition until changed within the worksheet. If you have suggestions for the UI, you should engage with PTC, I find them very approachable.
@DavidKonyndyk
@DavidKonyndyk 10 күн бұрын
@@PatJHeffernan Well thanks for checking, but I'm on Prime 9.0 and it definitely won't switch. Perhaps it's because I'm on the trial license or something.
@astartar5782
@astartar5782 20 күн бұрын
Hello Pat, is it possible to download this excel file? Please help.
@PatJHeffernan
@PatJHeffernan 19 күн бұрын
Hi. I am happy to provide the bones of the spreadsheet if you want to use it to program your VBA. I'm an educator, I believe the learning is in the doing. (That said, I've struggled to find a suitable means of sharing documents... I've tried Google Docs but seem to run into challenges... I am open to suggestions).
@Engineerselva
@Engineerselva 29 күн бұрын
I cannot find the Task board option in my MS PROJECTS 2019. Can you help me in this?
@PatJHeffernan
@PatJHeffernan 28 күн бұрын
I’m sorry, that must be frustrating. Unfortunately, I’m not setup to do troubleshooting assistance.
@williamcase426
@williamcase426 Ай бұрын
Is there a way to insert an image and automatically move everything down if it is overlapping what is already in the worksheet?
@PatJHeffernan
@PatJHeffernan Ай бұрын
As best I am aware, not automatically, but to create the space needed for the image is a fairly simple process.
@williamcase426
@williamcase426 Ай бұрын
@@PatJHeffernan All right, it's just rather annoying having to push everything down when rearranging a document or copying in something fairly large.
@alisalati1320
@alisalati1320 Ай бұрын
Hello Pat, I understand how to set a baseline at the beginning of a project. However, how to assign an existing schedule as a baseline of a new schedule in MSP? This is an easy task in P6 but I could not find any option to assign an existing/old schedule as baseline current schedule.
@nsolanoc.
@nsolanoc. 2 ай бұрын
Thank you sir for your videos.... Could you teach us how to integrate PTC MathCAD with PTC Creo? Thanks in advance
@PatJHeffernan
@PatJHeffernan 2 ай бұрын
Sorry, I don’t use Creo. Maybe someday…
@BwalyaHiggins-es3cw
@BwalyaHiggins-es3cw 2 ай бұрын
your so good at making it sound simple
@PatJHeffernan
@PatJHeffernan 2 ай бұрын
I’d like to think the process itself is simple. The real challenge is amassing the insights and data to build the decision tree. Thanks.
@BwalyaHiggins-es3cw
@BwalyaHiggins-es3cw 2 ай бұрын
@@PatJHeffernan I just want you to know that you really helped me with something I have been struggling with for a while now and I appreciate it
@PatJHeffernan
@PatJHeffernan 2 ай бұрын
Thanks. Very kind of you to say. I’m glad I was able to help.
@yashawale9516
@yashawale9516 2 ай бұрын
Sahi hai bhai
@arnavrao8252
@arnavrao8252 3 ай бұрын
Why do we use double arrows for Torque? What does that signify? Thank you!
@PatJHeffernan
@PatJHeffernan 3 ай бұрын
This used to be more common as it allows us to signify a torque easily, including direction (right hand rule) in 2D. Newer texts show the torque as a curved arrow, but this requires a 3D diagram to fully comprehend. The double-arrow as torque is simple and easier than curved arrows for personal calculation notes… especially for 2D representation, which most of us do. Curved arrows are easy to misunderstand the direction.
@ubuyashikikanata
@ubuyashikikanata 3 ай бұрын
Hello! I know it's kinda late but can u explain how abs (module) function works for arrays?
@darrylng9562
@darrylng9562 3 ай бұрын
Thank you so much Sir 🙏👍💫
@PatJHeffernan
@PatJHeffernan 3 ай бұрын
Glad you enjoyed it!
@PatJHeffernan
@PatJHeffernan 3 ай бұрын
Excellent. I use a lot of Ctrl-G commands. 👍🏻
@JeromeDemers
@JeromeDemers 3 ай бұрын
sweet, just starting to learn Mathcad. Other pro tip is that once you go in the ribbon menu "operators and symbols" and click symbols and the entire symbols menu drop down, you can mouse over the symbols and Mathcad shows you the Ctrl+G command for them! It actually does that for other Mathcad command.
@elkarmouniahmed7821
@elkarmouniahmed7821 3 ай бұрын
Can you please share the excel sheet with estimate duration
@PatJHeffernan
@PatJHeffernan 3 ай бұрын
Try this. I’m not sure if it works as I’m having challenges with Google Docs. drive.google.com/drive/mobile/my-drive?usp=docs_web&pli=1
@zulfikarian
@zulfikarian 3 ай бұрын
Great video. But I want to ask, if somehow actual material resources used is more than what's planned. How do we express it in tracking gant?
@PatJHeffernan
@PatJHeffernan 3 ай бұрын
Hi. The tracking Gantt shows time variance compared to plan. Resource variance is tracked numerically in the database and reported separately.
@MrMarcslist
@MrMarcslist 3 ай бұрын
The 95-100% probability seems to be close to the "pessimitic" estimite in this example (and some other simple examples I have seen). Is this usually the case ? What confidence value do PMs use in real world projects ? Are they looking for 90-100% confidence ?
@PatJHeffernan
@PatJHeffernan 3 ай бұрын
I don’t think it is actually possible to answer your question. The diverse nature of projects across the breadth of industries and circumstances change the variability of factors incredibly. I think you have to learn your industry and the nature of your projects to figure out what your risk tolerance is or should be.
@MrMarcslist
@MrMarcslist 3 ай бұрын
@@PatJHeffernan I am looking for a real world example. So if someone has used this ; what was the industry , what was the confidence value they used , and how far off the pessimistic number was the value ?
@PatJHeffernan
@PatJHeffernan 3 ай бұрын
As noted below.
@elkarmouniahmed7821
@elkarmouniahmed7821 3 ай бұрын
Thank you for your amazing explanation. I would like to get the excel sheet for practicing
@PatJHeffernan
@PatJHeffernan 3 ай бұрын
drive.google.com/drive/mobile/my-drive?usp=docs_web&pli=1
@PatJHeffernan
@PatJHeffernan 3 ай бұрын
Not sure if this works as I’ve had challenges with google docs and permissions. Let me know.
@lions85
@lions85 3 ай бұрын
Hello, very interesting video. It would be possible in MS project to create an excel report at every status update with the EV columns in the way to create my customized graphs in excel or even in powerapps? Thanks
@PatJHeffernan
@PatJHeffernan 3 ай бұрын
I’ve not tried to do that but I suspect it is possible. My next effort is going to be using Power BI to build a dashboard with hooks into MSProject.
@lions85
@lions85 3 ай бұрын
@@PatJHeffernan Hello, thank you for your help. I am trying to use earned value on my project but I am freaking because the project is not really standard. It would be possible to ask you a couple of question to help me figure it out? How can I write you? Thanks a lot
@user-gy1yw8su4g
@user-gy1yw8su4g 3 ай бұрын
Can we create dependent combobox
@PatJHeffernan
@PatJHeffernan 3 ай бұрын
Not that I’m aware.
@jnerikaat
@jnerikaat 3 ай бұрын
Dear Sir, Can you please explain the variance column. Thanks!
@PatJHeffernan
@PatJHeffernan 3 ай бұрын
Sure… if you tune in to this video it will answer your question completely. MS Project 8 - Tracking Progress and Variance kzbin.info/www/bejne/nIu4aHSDZ9yqn7csi=Aw6wTbbZq-44MBa-
@jnerikaat
@jnerikaat 3 ай бұрын
@@PatJHeffernan Many thanks Kind Sir! Most greatly appreciated. Your MS Project videos are the best and most compelling among many I have seen. Easy to listen and learn from start to finish without getting distracted or losing focus. 👍👍👍
@PatJHeffernan
@PatJHeffernan 3 ай бұрын
@@jnerikaat That is very kind of you to say. I’m very glad you found them useful!! 👍🏻
@isaacmleza457
@isaacmleza457 3 ай бұрын
Loud and clear! Watching from Malawi
@bethrousseau4748
@bethrousseau4748 4 ай бұрын
Do you have any idea how to assign a single person split activities and use auto-levelling? For example, parts are ordered and are 4 weeks out but will take 2 hours or a week (no fixed time) for follow-up, or the person has to research suppliers and complete the design with a 1 wk offset of start and finish, but otherwise parallel path efforts at 75%/ 25% time (aside from fixed recurring conflicts)? I can't find anything helpful anywhere and you're the only person who's fully demonstrated many of the things that project can do.
@PatJHeffernan
@PatJHeffernan 4 ай бұрын
Hi Beth. Sadly, I don't have a quick answer for you. I'd be happy to investigate but it won't be timely as I'm at the start of a fairly large move. You can likely find me on linkedIn or Facebook to connect if you want to explore a solution some months from now. (My current effort with MSProject is to start looking at MSProject Online and MSProject's integration with Planner to see what opportunities are there).
@kurtsalm2155
@kurtsalm2155 4 ай бұрын
The link to your video list doesn't work.
@PatJHeffernan
@PatJHeffernan 4 ай бұрын
OK, thanks for the comment. I’ll check it out.
@kurtsalm2155
@kurtsalm2155 4 ай бұрын
@@PatJHeffernan I'm a prospective Mathcad customer. You're videos are very helpful to the evaluation process.
@PatJHeffernan
@PatJHeffernan 4 ай бұрын
I can open it with the link so it might be a permissions issue. I reset the permissions so anyone can view (which is what I thought it was set at)... maybe try again?
@PatJHeffernan
@PatJHeffernan 4 ай бұрын
Well, I obviously appreciate the program. I am not associated with PTC at all,... other than being friendly and having participated in one of their webinars.
@juanortiz313
@juanortiz313 4 ай бұрын
this is a usefull video
@PatJHeffernan
@PatJHeffernan 4 ай бұрын
Thanks!
@srinikeshsingarapu2600
@srinikeshsingarapu2600 4 ай бұрын
great job
@PatJHeffernan
@PatJHeffernan 5 ай бұрын
What precisely do you mean by an “iterative plot”? I’m happy to give it some thought if I’m sure I know what you mean.
@Info-God
@Info-God Ай бұрын
Iterative plot could mean: a fascicle/nomogram of the function if it contains a parameter(s) that varies. Like: mx+2y+5=0, where m takes a range of values. There are those graphs on advanced books showing how a function behaves as a specific parameter (m) varies.
@passionofsimulation3005
@passionofsimulation3005 5 ай бұрын
Hi, Thanks for the video. By the way, is it possible to add a interative plot in mathcad?. If so, pls make a tutorial on it.
@dr.strangelove9815
@dr.strangelove9815 5 ай бұрын
Thank you very much!
@PatJHeffernan
@PatJHeffernan 5 ай бұрын
I hope it was useful!
@jip45
@jip45 5 ай бұрын
Thank you very much, Pat.
@PatJHeffernan
@PatJHeffernan 5 ай бұрын
Your welcome!! I’m glad you enjoyed it! 👍🏻
@user-hf5in9cn6r
@user-hf5in9cn6r 5 ай бұрын
Another waste of my time since I wanted to learn about MS Project Resource Leveling only to be told at the end to do it manually.
@PatJHeffernan
@PatJHeffernan 5 ай бұрын
Sorry. You can play with the automated features, they work, but you have to review the choices the AI makes for you and I found you spend more time editing them than I do if I do it manually. This is likely biased based on the size and nature of projects I’ve worked on.
@meriemhadri3887
@meriemhadri3887 5 ай бұрын
very clear explanation, you have a constructive learning methodoloy, thanks from Morroco, for sharing knowledge!
@PatJHeffernan
@PatJHeffernan 5 ай бұрын
Thanks!
@prajwalkumarhr9981
@prajwalkumarhr9981 6 ай бұрын
Hello sir, amazing tutoiral must say. Can i get the excel in which you filled all the details beforehand sir?
@PatJHeffernan
@PatJHeffernan 6 ай бұрын
Thanks. Try this and see how it works: docs.google.com/spreadsheets/d/1w-Ksgy1XD-OI5bbaIhF19DyYRbpLZq2O/edit?usp=drive_link&ouid=103534787204661770563&rtpof=true&sd=true
@santiagonunez7818
@santiagonunez7818 7 ай бұрын
excelent tutorial but if i have a function wich i want to now his maximum ?
@PatJHeffernan
@PatJHeffernan 7 ай бұрын
Not sure what your exact need is… try this: kzbin.info/www/bejne/rpjIXoqggJVmbqcsi=aGO2FzqPygwUvge3
@bizarrelance3698
@bizarrelance3698 8 ай бұрын
Awesome
@PatJHeffernan
@PatJHeffernan 8 ай бұрын
I'm glad you liked it!!
@abubakriqbal2355
@abubakriqbal2355 8 ай бұрын
Thanks prof
@ashishthapayt
@ashishthapayt 8 ай бұрын
Thank you professor. Do you have any idea of the tools that book publishers use to make the drawings ?
@PatJHeffernan
@PatJHeffernan 8 ай бұрын
Sure. Most popular for professional drawings is the Adobe Suite of software (Illustrator, Photoshop, etc). Getting more common are getting drawings out of 3D models (SolidWorks, Fusion360, etc). When I do this I usually end up augmenting them with markups in Illustrator, etc. For most things I find PPT the simplest and most accessible.
@ashishthapayt
@ashishthapayt 8 ай бұрын
Professor would you share the name of the tool that you use to make the png images of beam's section?
@PatJHeffernan
@PatJHeffernan 8 ай бұрын
Sure. I talk about how I insert images here (PTC Mathcad - Inserting Images kzbin.info/www/bejne/laTUlX2mgtKIh8U). I just make the images in PPT and then use the “save as” feature to turn them into a png.
@swapnilpangavhane7856
@swapnilpangavhane7856 8 ай бұрын
Is there a way to hide these added units for a printable report? Because it doesn't make sense if printed for reporting checking the work.
@PatJHeffernan
@PatJHeffernan 8 ай бұрын
Actually they make perfect sense, it is the empirical formula itself that makes little sense outside the context of its explanatory notes. Why not just add a comment explaining the nature of the equation and units?
@sheikhsadi8605
@sheikhsadi8605 8 ай бұрын
I stucked 2 hour on this and thought mathcad is broken
@user-cy9ip1if2i
@user-cy9ip1if2i 9 ай бұрын
Good
@PatJHeffernan
@PatJHeffernan 8 ай бұрын
Thanks
@user-cy9ip1if2i
@user-cy9ip1if2i 9 ай бұрын
Good
@PatJHeffernan
@PatJHeffernan 7 ай бұрын
Thanks
@twisted4901
@twisted4901 10 ай бұрын
Thanks a lot, sir You made the solution like a pro❤❤
@PatJHeffernan
@PatJHeffernan 10 ай бұрын
Glad you enjoyed it.
@AsserMunch
@AsserMunch 10 ай бұрын
Hi, great stuff as always, thanks for your videos! I have a problem that I guess is a bit tricky to explain. If I want to solve a problem, and use symbolic values, I can't figure out how to define ('save') the output from a solve function containing a symbolic value. In an exercise, a force is given as 'F' and dimensions as multiples of 'a'. With the solve function and explicit parameter, as you show in this video, yes, I can get the output I want, but it remains undefined until I define 'F' and 'a' as numerical values. I would need the values in further equations, so I want to achieve a valuable defined using symbolic values. Maybe I'm missing something basic? I hope it makes sense. Thanks :)
@philipbgood
@philipbgood 11 ай бұрын
My version of MathCAD produces a value of 32 when I multiply a column matrix of A=[1,2,3] by the column matrix of B=[4,5,6]. Is this an error in the software or is it following the rules for vectors or something? I'm thinking it should be undefined.
@PatJHeffernan
@PatJHeffernan 11 ай бұрын
@philipbgood: As I interpret it, Mathcad is dealing with your two column matrices as arrays. If you check the help on Matrix Multiplication it offers this explanation for "two vectors of the same length": "Returns the dot product (inner product) of x and y: a scalar formed by multiplying element-wise the entries of the first vector with the complex conjugate of the entries of the second vector and summing the results." Hope this helps.
@philipbgood
@philipbgood 11 ай бұрын
My version of MathCAD produces a value of 32 when I multiply a column matrix of A=[1,2,3] by the column matrix of B=[4,5,6]. Is this an error in the software or is it following the rules for vectors or something? I'm thinking it should be undefined.
@PatJHeffernan
@PatJHeffernan 11 ай бұрын
@philipbgood: As I interpret it, Mathcad is dealing with your two column matrices as arrays. If you check the help on Matrix Multiplication it offers this explanation for "two vectors of the same length": "Returns the dot product (inner product) of x and y: a scalar formed by multiplying element-wise the entries of the first vector with the complex conjugate of the entries of the second vector and summing the results." Hope this helps.
@RDFB101
@RDFB101 11 ай бұрын
Great tip, just what I'd run into