48" Mill Part 4 - Shrink Links

  Рет қаралды 2,008

J&L Narrow Gauge Railroad

J&L Narrow Gauge Railroad

Күн бұрын

Пікірлер: 13
@larrymilliken288
@larrymilliken288 10 ай бұрын
It never ceases to amaze me how intricate old technology was and how it's just as detailed and thought out as anything we build today. Thanks for sharing these snippets of the past with us, Rick.
@tonywatson987
@tonywatson987 10 ай бұрын
Rick, this is an enormous task to take on, even with a full team - I'm amazed at your dedication to save these huge machines for posterity - you are a hero!
@ShodHorse
@ShodHorse 10 ай бұрын
What blows my mind myself is the fact, in over a hundred years we're still using the same principles of building the same things. The only difference is that now we've got computers that do most of the thinking. It makes me wonder how much knowledge has been lost. Your videos and what you and your friends, volunteers, foundation, etc do give me hope that we can rediscover and retain that knowledge.
@davelewandoski4292
@davelewandoski4292 10 ай бұрын
Great video Rick, wish it was longer. Your explanations are great and easily understood. Thanks for doing these.
@trottermalone379
@trottermalone379 10 ай бұрын
Thanks for your update. Holy Smokes! Those are some IMPRESSIVE castings!!
@fxsrider
@fxsrider 10 ай бұрын
Rick I told my wife, who loves to haul me to 5K races and such that we ARE going to come see your work!! I built 747 aircraft for a quarter century, F-16's prior to that and F/A18 before which adds up to 32 years of it. We used to do a similar trick. Called it a "freeze plug" as it was a small round plug we would dip in liquid nitrogen to shrink it and then shoot it into the hole with a rivet gun and let it warm up and act like a solid surface. Then drill the hole where it was supposed to be. I will try to get in touch and figure out a good time in the summer. We are in Mansfield so not too far away.
@elsdp-4560
@elsdp-4560 10 ай бұрын
Thank you for sharing.👍
@happyhome41
@happyhome41 10 ай бұрын
Most excellent
@bcbloc02
@bcbloc02 10 ай бұрын
Seems like leaving the welded on lift points on would make it easier to place the hot links as well?
@karensavarese5684
@karensavarese5684 3 ай бұрын
Will the fabricated plate steel links expand enough? Might have some experimentation to get the center sizing right. Dubs
@YoungstownSteelHeritage
@YoungstownSteelHeritage 2 ай бұрын
Coefficient of expansion doesn't change. Each link has to be sized for the opening it goes into.
@pulsenpal7882
@pulsenpal7882 10 ай бұрын
on some mill prime movers tie rods were used--up to 40 feet---did Tod ever incorporate tie rods?
@YoungstownSteelHeritage
@YoungstownSteelHeritage 10 ай бұрын
Yes. The two bedplates are connected to each other with tie rods.
Tod Engine Shrink Links
9:52
J&L Narrow Gauge Railroad
Рет қаралды 1,9 М.
48" Mill - Mighty BIG Crankshaft!
7:16
J&L Narrow Gauge Railroad
Рет қаралды 2,7 М.
If people acted like cats 🙀😹 LeoNata family #shorts
00:22
LeoNata Family
Рет қаралды 35 МЛН
48" Mill - Steam Engine Connecting Rod
6:03
J&L Narrow Gauge Railroad
Рет қаралды 1,9 М.
Walking Around the Carrie Blast Furnaces Part 1
10:56
J&L Narrow Gauge Railroad
Рет қаралды 6 М.
Hillbilly Wizard frames 11/27/24
4:03
Hillbilly Wizard
Рет қаралды 503
48" Universal Plate Mill Restoration Part 2 - The Bone Yard
8:24
J&L Narrow Gauge Railroad
Рет қаралды 4 М.
Inside the Cylinder of the Tod Engine
6:57
J&L Narrow Gauge Railroad
Рет қаралды 2,1 М.
Walking Around Carrie Furnaces Part 4 - The Ore Bridge
18:47
J&L Narrow Gauge Railroad
Рет қаралды 3,1 М.
48" Universal Plate Mill Restoration Part 1 Overview
16:51
J&L Narrow Gauge Railroad
Рет қаралды 9 М.