The newly constructed double-decker flyover in Bengaluru is a significant infrastructure project aimed at easing traffic congestion. Here are some key details:
**Location and Length**: The flyover stretches 5.12 km from Ragigudda to the Central Silk Board junction⁴.
**Cost**: It was built at a cost of ₹449 crore⁴.
**Structure**: The flyover features two separate carriageways, each with two lanes. The lower deck is for vehicular traffic, while the upper deck will accommodate a metro line⁵.
**Traffic Relief**: It aims to provide a signal-free corridor from Ragigudda to HSR Layout and Hosur Road, potentially reducing travel time by over 30%⁴.
**Current Status**: While the main flyover is operational, some ramps connecting HSR Layout to Ragigudda and BTM Layout are still under construction and are expected to be completed by June 2025⁵.
This project is expected to significantly improve the traffic situation at the notoriously congested Central Silk Board junction.
Have you had a chance to see or use the new flyover yet?
Source:
(1) How will South India’s first double-decker flyover in Bengaluru ease .... www.thehindu.c....
(2) South India’s first double-decker flyover opens for public, BMRCL says .... indianexpress.....
(3) . bing.com/searc....
(4) Double Decker Sandwich. / doubledeckersandwich .
(5) Bengaluru: ‘Double-decker flyover has shifted the congestion’. www.deccanhera....
(6) Double-decker flyover opens at Silk Board Junction in Bengaluru .... timesofindia.i....