No, at launch they wont. The reason for this is that they purposely made the platforms longer than the trains so that as ridership goes up they can introduce either longer trains or couple together more units without the huge cost of a station rebuild.
@parva96037 ай бұрын
They won't what?
@Creepercrasher137 ай бұрын
@@parva9603it would appear that the person I was talking to has removed their comment. It was something about the number of trains used vs the platform length or something.
@Meyers17934 ай бұрын
This will truly improve the transit options and travel times for people along Eglinton.
@Nvideofilmsproductions5 ай бұрын
Should be Eglinton/Yonge once this line finally opens
@trainglen224 ай бұрын
So when does this open????
@ultrapierre4 ай бұрын
Exactly … Still Not in Service 😂
@franklobe4 ай бұрын
A project like this would have been done in a matter of months in China.
@jamesbird69373 ай бұрын
fr
@michaelsoars173 ай бұрын
Yeah but it would all be tofu dreg construction
@emekabronson86973 ай бұрын
...with 2-3 worker deaths a day
@pangrey89313 ай бұрын
And half the workers die or get injured and it crashes every few months
@jayvonnoelsmith84453 ай бұрын
Yes
@johnnymegabyte9 ай бұрын
emphasis on the NOT IN SERVICE sign on the train
@XiongHaiFan2 ай бұрын
It goes faster then line 1 so I’m happy
@jonathanshepherd70753 ай бұрын
This looks so bad.
@mega60769 ай бұрын
Does the train not cover the entire platform?
@ttckid239 ай бұрын
It's designed in case when they decide to use 3 car set up but during most testing only 2 cars are used
@mega60769 ай бұрын
@@ttckid23 I think 3 cars
@ttckid239 ай бұрын
@mega6076 it was a statement not a question but thats basically what the stations are designed for
@mega60769 ай бұрын
@@ttckid23 wrong
@zhouyou283 ай бұрын
Why is it still not in service
@MGa-h6iАй бұрын
Ready in 7000 years
@andrewthompson52423 ай бұрын
NOT IN SERVICE
@TheJojoSimz3 ай бұрын
I truly hate the seat layout. It has the same trash layout as the streetcars that feel crammed any time more the 7 people are in it. Wish they had subway car style layout
@oddlyrandom50719 ай бұрын
No safety glass .... Why?
@ttckid239 ай бұрын
There's an protection system GIDS which metrolinx made a video about
@hakohito7 ай бұрын
They need to install safety glass all over the subway stations as well
@ttckid237 ай бұрын
@@hakohito I would say voice that to metrolinx, because it would be more safer if they did
@PlanetLinuxChannel4 ай бұрын
There are plans to add glass to one or two of the busiest transfer stations between Lines 1 and 2. Hopefully they’ll expand the idea to more in the future.
@brianmcdonald65194 ай бұрын
@@hakohito They are going to retrofit a few busy stations, but it would be cost prohibitive to do the whole system. They did a study, and found out it would cost almost as much as building another complete line.
@bobuxman694 ай бұрын
4 years late
@youbetcha68804 ай бұрын
Love the bre concrete.
@KevLaswiss-ek6zt3 ай бұрын
Is this open now running as a transit
@trainglen22Ай бұрын
@@KevLaswiss-ek6zt Regrettably no. Metrolinx and the Doug Ford government is being very quiet on opening this completed LRT line.